NCA Contractor Safety Checklist - FY-25.pdf

PDF 420 KB Posted

Attached to
Y1JZ--826CM3009 Alexandria NC Rostrum and Historic Wall Repairs and Renovation (VA-25-00078915)
Solicitation number
36C78625B0036
Issued by

About this file

The document is a National Cemetery Administration Safety Checklist for Contractors, designed to ensure comprehensive safety compliance for contractors working at national cemeteries. The checklist requires contractors to submit detailed safety documentation, including a Safety and Health Policy, Accident Prevention Plan, Responsibilities and Lines of Authorities, Medical Support Plan, Training Program, Safety and Health Inspection Procedures, and Site-Specific Safety Plans.

Key requirements include providing a company safety policy, accident reporting procedures, emergency response plans, medical support details, employee training documentation, safety inspection protocols, and specific site safety plans covering areas such as respiratory protection, hazard communication, heat/cold stress monitoring, fall protection, confined space entry, and other OSHA-regulated safety considerations. Contractors must submit various documents at different stages: some with the initial quote/proposal, some within 30 days post-award, and others within 90 days post-award. The checklist is specifically tied to the Alexandria National Cemetery project (Solicitation No. 36C78625B0036) for rostrum and historic wall repairs and renovation, and emphasizes strict adherence to OSHA regulations and comprehensive safety management.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Cemetery Administration Safety Checklist for Contractors

Date of Review

Location (Cemetery name and location) Cemetery Contact

Contract Number Contractor Name

Reviewer’s Name (Print) Reviewer’s Signature

This checklist serves as a guide only, it does not replace or eliminate the need to comply with the requirements set forth in OSHA 29 CFR 1910 General Industry Regulations and OSHA 29 CFR 1926 Construction Regulations. Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational risks and compliance plans. Plans may include but not be limited to:

Item Description Yes No N/A Remarks (Any No or N/A item)

1. Statement of Safety and Health Policy (Due with Quote/Proposal)

a. Includes: Copy of current company Safety and Health Policy Statement, detailing commitment to providing a safe and healthful workplace for all employees.

b. Includes: Contractor’s written safety program goals, objectives, and accident experience goals for the current contract.

c. Includes: Risk Management Processes. Detailed project-specific hazards and controls shall be provided by a Job Hazard Analysis (JHA) for each major phase/activity of work.

2. Responsibilities and Lines of Authorities (Due 90 days post-award)

a. Includes: A statement of the contractor’s ultimate responsibility for the implementation of their Safety and Health Program.

b. Includes: Lines of authority.

c. Includes: The identification and job responsibilities of personnel responsible for safety - at both contractor (Corporate) and cemetery level.

3. Accident Prevention Plan (Due with Quote/Proposal)

a. Accident Reporting and Investigation Procedures PREVENTION: Identify tasks – Identify hazards in tasks – Identify controls to protect from the hazards.

POST INJURY: Bodily injury, property damage incidents, and near misses must be immediately reported to the construction project manager and the Collateral Duty Safety Officer. This does not relieve contractors of OSHA or insurance carrier reporting requirements. The contractor shall conduct an accident investigation. The CO/ COR/ Collateral Duty Safety Officer must be copied on the investigation report within 30 days of the accident.

b. OSHA 300 Log

c. Accident Reporting

• The plan identifies how, when, and who shall complete the Exposure data (man-hours worked).

complete accident investigations, reports, and logs.

make immediate notification of major accidents (fatality or any amputation, loss of an eye, or hospitalization of an employee).

d. Emergency Response Plans:

• Procedures & Tests/Drills Program

• Severe Weather Plan

• Spills Plans

• Fire Prevention Plan/Fire Extinguisher Training

• Posting of Emergency Telephone Numbers

4. Medical Support Outline on-site medical support and off-site medical arrangements including rescue and medical duties for those employees who are to perform them, and the name(s) of on-site Contractor personnel trained in first aid and CPR. A minimum of two employees shall be certified in first aid and CPR per shift/site.

5. Training (Due 30 days post-award or prior commencement of work)

a. Includes requirements for new hire Safety Orientation training at the time of initial hire of each new employee.

b. Includes the list of mandatory training and certifications applicable to this project (e.g., fall protection, confined space entry, equipment operator, vehicle operator, HAZCOM training, PPE) and any requirements for periodic retraining/ recertification.

c. Includes the identity requirements for emergency response training.

d. Includes the procedures for periodic safety and health training for supervisors and employees.

6. Safety and Health Inspections (Due 90 days post-award)

a. Includes the name(s) of individual(s) responsible for conducting safety inspections. (e.g., PM, safety professional, QC, supervisors, employees).

b. Includes proof of inspector's training/ qualifications.

c. Indicates when inspections will be conducted.

d. Furnished sample forms upon which inspections will be recorded.

e. Indicates deficiency tracking system and follow-up procedures.

f. Includes the names of competent and/or qualified person(s) and proof of competency/ qualification to meet specific OSHA competent/ qualified person(s) requirements.

g. Includes any internal/external inspections (e.g., OSHA, NCA AWE)

7. Site Specific Plans and Procedures (Due with Quote/Proposal)

a. Site Sanitation Plan (29 CFR 1910.141)

b. Respiratory Protection Plan (29 CFR 1910.134)

c. Hazard Communication Program (HAZCOM)

d. Abrasive Blasting Plan (29 CFR 1910.94(a)(5)-(6))

e. Heat/Cold Stress Monitoring Plan

f. Crystalline Silica Monitoring Plan (29 CFR 1910.1053)

g. Hazardous Energy Control Plan – Lock Out Tag Out (LOTO)

h. Fall Protection & Prevention Plan (Site- Specific)

i. Confined Space Entry Program

j. Hearing Conservation (29 CFR 1910.95(c)

k. Flammable Liquid Storage (29 CFR

1910.106 (d))

l. Excavation Safety Plan

m. Other:

n. Other:

o. Other:

8. Other:

9. Other:

10. Other:

Remarks:

Date of Review:
Location Cemetery name and location: Calverton Natl Cem
Cemetery Contact:
Contract Number:
Contractor Name:
Reviewer s Name Print:
Remarks:
Check Box31:
0: Off
Check Box32:
0: Off
Check Box33:
0: Off
Text34:
0:
Check Box35: Off
Check Box36: Off
Check Box37: Off
Check Box38: Off
Check Box39: Off
Check Box40: Off
Check Box41: Off
Check Box42: Off
Check Box43: Off
Check Box44: Off
Check Box45: Off
Check Box46: Off
Check Box47: Off
Check Box48: Off
Check Box49: Off
Check Box50: Off
Check Box51: Off
Check Box52: Off
Check Box53: Off
Check Box54: Off
Check Box55: Off
Check Box56: Off
Check Box57: Off
Check Box58: Off
Check Box59: Off
Check Box60: Off
Check Box61: Off
Check Box62: Off
Check Box63: Off
Check Box64: Off
Check Box65: Off
Check Box66: Off
Check Box67: Off
Check Box68: Off
Check Box69: Off
Check Box70: Off
Check Box71: Off
Check Box72: Off
Check Box73: Off
Check Box74: Off
Check Box75: Off
Check Box76: Off
Check Box77: Off
Check Box78: Off
Check Box79: Off
Check Box80: Off
Check Box81: Off
Check Box82: Off
Check Box83: Off
Check Box84: Off
Check Box85: Off
Check Box86: Off
Check Box87: Off
Check Box88: Off
Check Box89: Off
Check Box90: Off
Check Box91: Off
Check Box92: Off
Check Box93: Off
Check Box94: Off
Check Box95: Off
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
Check Box102: Off
Check Box103: Off
Check Box104: Off
Check Box105: Off
Check Box106: Off
Check Box107: Off
Check Box108: Off
Check Box109: Off
Check Box110: Off
Check Box111: Off
Check Box112: Off
Check Box113: Off
Check Box114: Off
Check Box115: Off
Check Box116: Off
Check Box117: Off
Check Box118: Off
Check Box119: Off
Check Box120: Off
Check Box121: Off
Check Box122: Off
Check Box123: Off
Check Box124: Off
Check Box125: Off
Check Box126: Off
Check Box127: Off
Check Box128: Off
Check Box129: Off
Check Box130: Off
Check Box131: Off
Check Box132: Off
Check Box133: Off
Check Box134: Off
Check Box135: Off
Check Box136: Off
Check Box137: Off
Check Box138: Off
Check Box139: Off
Check Box140: Off
Check Box141: Off
Check Box142: Off
Check Box143: Off
Check Box144: Off
Check Box145: Off
Check Box146: Off
Check Box147: Off
Check Box148: Off
Check Box149: Off
Check Box150: Off
Check Box151: Off
Check Box152: Off
Check Box153: Off
Check Box154: Off
Check Box155: Off
Check Box156: Off
Check Box157: Off
Check Box158: Off
Check Box159: Off
Check Box160: Off
Check Box161: Off
Check Box162: Off
Check Box163: Off
Check Box164: Off
Check Box165: Off
Check Box166: Off
Check Box167: Off
Check Box168: Off
Check Box169: Off
Check Box170: Off
Check Box171: Off
Check Box172: Off
Check Box173: Off
Check Box174: Off
Check Box175: Off
Check Box176: Off
Check Box177: Off
Check Box178: Off
Check Box179: Off
Check Box180: Off
Check Box181: Off
Check Box182: Off
Check Box183: Off
Check Box184: Off
Check Box185: Off
Check Box186: Off
Check Box187: Off
Check Box188: Off
Check Box189: Off
Check Box190: Off
Check Box191: Off
Check Box192: Off
Check Box193: Off
Text194:
Text195:
Text196:
Text197:
Text198:
Text199:
Text200:
Text201:
Text202:
Text203:
Text204:
Text205:
Text206:
Text207:
Text208:
Text209:
Text210:
Text211:
Text212:
Text213:
Text214:
Text215:
Text216:
Text217:
Text218:
Text219:
Text220:
Text221:
Text222:
Text223:
Text224:
Text225:
Text226:
Text227:
Text228:
Text229:
Text230:
Text231:
Text232:
Text233:
Text234:
Text235:
Text236:
Text237:
Text238:
Text239:
Text240:
Text241:
Text242:
Text243:
Text244:
Text245:

File details come from the government source that posted it. Updated .