Cost Estimate Worksheet - Alexandria National Cemtery - PO No 826CM3009 - FY-25.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Y1JZ--826CM3009 Alexandria NC Rostrum and Historic Wall Repairs and Renovation (VA-25-00078915)
- Solicitation number
- 36C78625B0036
About this file
The document is a Cost Estimate Worksheet for a VA National Cemetery construction project at Alexandria National Cemetery. The solicitation (36C78625B0036) covers Rostrum, Historic Wall Repairs and Renovation (Project No. 826CM3009) located at 1450 Wilkes Street in Alexandria, VA. The worksheet provides a comprehensive divisional breakdown for contractors to estimate project costs, including general conditions, site investigation, and multiple construction divisions from earthwork to electrical systems. The project requires contractors to provide all necessary tools, labor, materials, equipment, and professional supervision to complete the renovation work, with the cost estimate structured to capture detailed line-item expenses across various construction categories. The project is being executed by the Department of Veterans Affairs National Cemetery Administration for fiscal year 2025, with contractors expected to submit a lump sum total cost including potential overhead and profit percentages.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IFB Contractor Cost Estimate Worksheet |
| Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number. |
If a Division is not being used put N/A in that field.
Additional lines/items can be added if needed or appropriate.
| Offeror shall use and edit to fit Task Order Project |
| ALEXANDRIA NATL CEM: Project Title: Rostrum, Historic Wall Repairs and Renovation |
| Solicitation No: 36C78625B0036 |
| Project No: 826CM3009 |
| Division | Unit of Measure | # of Units | Unit Cost $ | Extended/Total Cost $ | Comments / Remarks |
| Division 0 - Special Sections | |||||
| General Conditions and Administration | JB | 1 | |||
| Division 01 - General Requirements | |||||
| Mobilization | JB | 1 |
| Division 02 - Existing Conditions | ||
| Site Investigation | JB | 1 |
| Division 03 - Concrete |
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastic, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings (Doors, Windows, etc...)
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12- Furnishings
Division 13 - Special Construction
Division 14 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
| Mechanical, Electrical, Plumbing Subtotal | ||
| General Construction Subtotal | ||
| Total Base Construction Cost | ||
| Insurance (if applicable) | ||
| Bonding (if applicable) | ||
| Overhead | ________ % | $0.00 |
| Profit | ________ % | $0.00 |
| GRAND TOTALS | $ |
File details come from the government source that posted it. Updated .