NAVMWR-26-R-0041_0006_NAS Lemoore Comm Rec.pdf

PDF 369 KB Posted

Attached to
NAS Lemoore Community Recreation Center Project
Solicitation number
NAVMWR-26-R-0041
Issued by

About this file

This is Amendment 0006 to solicitation NAVMWR-26-R-0041 for the NAS Lemoore Community Recreation Project at Naval Air Station Lemoore, California. The amendment, effective July 20, 2026, does not extend the proposal receipt deadline. The document consists primarily of Questions and Answers (Q&A) addressing proposer inquiries regarding project scope, design requirements, and existing conditions. Key clarifications include confirmation that the existing building is approximately 30,750 square feet; the contractor and Designer of Record must provide their own design solution (design-build project); asbestos-containing material (ACM) abatement will be priced as a separate Contract Line Item Number (CLIN 0002) at the government's option; exterior improvements, exterior painting, and parking lot improvements are excluded from the base scope but may be offered as alternative pricing; the existing roofing system will remain in service with compatible repairs for any required penetrations; and existing utility systems (electrical, gas, communications, water, sewer, fire water) are assumed operational and available for connection. The fire alarm system must be upgraded to include a mass notification system compatible with the base-wide Giant Voice system. The domestic water main piping size is 2 inches. Utility reports for 2021 through 2025 are provided as Attachment A, containing monthly meter readings and costs for water, electric, sewage, and natural gas consumption. The contracting officer is A'Keesha Stark (CNIC Facilities and Construction Contracting, Millington, Tennessee), with Debbie Little serving as Contract Specialist.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

1 5

0006 20 July 2026 N27-12 N944

CNIC Facilities and Construction Contracting A'Keesha Stark, Contracting Officer 5720 Integrity Drive, Lassen Building 457 Millington, TN 38055 akeesha.r.stark.naf@us.navy.mil / (901) 930-7405

Debbie Little, Contract Specialist debra.s.little9.naf@us.navy.mil

(901) 874-6860

NAVMWR-26-R-0041

16 June 2026

NAVMWR-26-R-0041

NAS Lemoore Community Recreation Project Amendment 0006

Continued on Page 2...

A'Keesha Stark, Contracting Officer

Lemoore Community Recreation Center Project NAS Lemoore, CA

Amendment 0006 Page 2 of 3

NAVMWR-26-R-0041

BLOCK 14 CONTINED:

A. ADD:

Q.32. Charrette and Existing Design Documentation: The solicitation references the charrette process but does not include any supporting design documentation. Are any charrette deliverables available for proposer use, including existing or proposed floor plans, programming documents, prioritization matrices, conceptual sketches, vignettes, presentation materials, or other A/E consultant work products? Additionally, are there any existing record drawings (as-builts), programming studies, or previously developed design documents that identify the intended renovation scope or space layout? If these documents are not available during the solicitation period, will they be provided after award?

A.32. The design charrette offers a design solution; however, this is a design build project. The Contractor and the Designer of Record should provide their design solution for the project.

Q.33. Hazardous Materials/ACM Scope: Amendment 0005, Question 21 states that NAVFAC will perform asbestos-containing material (ACM) abatement and that it is not the Contractor’s responsibility. However, the revised Section B includes CLIN 0002 directing the contractor to price and perform ACM abatement, including labor, testing, containment, and disposal. Please clarify which direction the governs the solicitation so proposers can accurately price the work.

A.33. Per the revised Section B, the NAFI would like for contractor to provide a price to perform the abatement as a separate CLIN in the event, the NAFI decides to exercise the option for contractor to perform the work.

Q.34. Building Area: The solicitation references multiple building areas:

29,500 SF (Charrette Narrative); Approximately 30,750 SF (consistent with available planning information); Approximately 32,000 SF (Amendment 0005, Question 6). Please confirm the official building area to be used for design, estimating, and pricing purposes.

A.34. The existing building is approximately 30,750 SF which is consistent with the available planning information.

Q.35. Authority Having Jurisdiction (AHJ). Please identify the Authority Having Jurisdiction (AHJ) for this project and provide any applicable design standards, review requirements, or guidance documents available to the design team.

A.35. The Contracting Officer is the primary concern. The Fire and Life Safety team will also have an area of jurisdiction, as well.

Q.36. Existing Record Documents: Will record drawings (as-builts) be made available to the successful offeror, or should the design team assume that existing conditions must be independently field verified and documented?

A.36. Clause H states that whatever the government provides shall be verified. So essentially, if as-built drawings are provided, the design team should “assume that existing conditions must be independently field verified and documented.

Q.37. Bid Clarification: Please identify any additional clarifications or anticipated amendments that may affect the proposal preparation prior to the proposal due date. Exterior

NAVMWR-26-R-0041 Lemoore Community Recreation Center Project NAS Lemoore, CA

Amendment 0006 Page 3 of 3

Scope: Other than the work specifically identified in the RFP, should proposers include any exterior improvements as part of the base proposal?

A.37. No.

Q.38. Bid Clarification: Parking Lot Improvements: Should proposers include parking lot improvement, such as sealing, restriping, ADA compliant parking stalls, accessible paths of travel, and associated signage, within the base bid as an additive alternate?

A.38. Parking lot improvements are not part of the scope of work; however, contractors may provide pricing as an alternative price for evaluation.

Q.39. Bid Clarification: Exterior Painting: Should exterior repainting of the building be included in the base scope, excluded, or provided as an additive alternate?

A.39. No.

Q.40. Bid Clarification: Existing Roofing: Our proposal assumes the existing roofing system will remain in service. Any required roof penetrations will be repaired with materials compatible with the existing roof and include applicable workmanship warranties. Please confirm this assumption is acceptable.

A.40. Confirmed.

Q.41. Bid Clarification: Existing Utilities: Our proposal assumes existing electrical, gas, communications, domestic water, sanitary sewer, fire water, and other utility systems are operational and available for connection. We intend to include costs for verifying utility locations and connection points.

Please confirm this assumption.

A.41. Confirmed.

Q.42 The charrette report mentions the existing building is not equipped with a mass notification system and is not interfaced with the Giant Voice base-wide mass notification system. Current UFC requires a mass notification system and integration with the base-wide MNS. Will this project require the fire alarm system to be upgraded to a combination fire alarm/mass notification system and interfaced with the Giant Voice base-wide MNS?

A.42. Yes, the current system will need to be upgraded to provide a Mass Notification System that is compatible with the base system.

Q.43. What is the piping size on the domestic water main?

A.43. 2 inches.

Q.44. What are the meter reading for the building and are there utility reports for 2021 through 2023 when the building was in full use?

A.44. Reports are incorporated as Attachment A.

///////////////////////////////////////////////////////NOTHING ELSE FOLLOWS///////////////////////////////////////////////////

ATTACHMENT A

FecComplexId Facno1 Facno2 Aserial Os TenantName Rate Ts UsCode Units Jon Commodity Fy Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep TotalUnits TotalCost SW34 825 @ A 28888 NEX - LEMOORE 3.62$ FW KGAL EBILL21974802021 Water 2021 1.90 1.00 1.20 1.60 0.90 1.00 1.10 1.60 1.10 1.20 1.10 1.20 14.90 53.94$ SW34 825 @ A 28888 NEX - LEMOORE 56.95$ EL MWH EBILL21974802021 Electric 2021 3.90 5.00 3.50 4.50 3.10 3.40 4.20 3.60 3.30 4.30 3.40 3.80 46.00 2,619.70$ SW34 825 @ A 28888 NEX - LEMOORE 2.34$ SE KGAL EBILL21974802021 Sewage 2021 - - - - - - - - - - - - - -$ SW34 825 @ A 28888 NEX - LEMOORE 12.57$ NG MBTU EBILL21974802021 Gas 2021 - - 58.50 71.80 73.80 55.00 28.90 - - - - - 288.00 3,620.16$

SW34 825 @ A 28888 NEX - LEMOORE 22.89$ NG MBTU EBILL22335552022 Gas 2022 - 0.80 16.70 84.90 58.10 68.90 18.40 2.20 - 0.30 - 12.30 262.60 6,010.91$ SW34 825 @ A 28888 NEX - LEMOORE SE KGAL EBILL22335552022 Sewage 2022 - - - - - - - - - - - - - -$ SW34 825 @ A 28888 NEX - LEMOORE 5.47$ FW KGAL EBILL22335552022 Water 2022 1.20 0.90 1.30 1.40 1.60 1.50 1.10 1.20 1.00 1.40 0.90 1.20 14.70 80.41$ SW34 825 @ A 28888 NEX - LEMOORE 105.83$ EL MWH EBILL22335552022 Electric 2022 4.60 2.40 3.50 3.00 2.80 3.10 4.30 1.60 3.90 2.60 2.10 3.50 37.40 3,958.04$

SW34 825 @ A 28888 NEX - LEMOORE 34.13$ NG MBTU EBILL22640052023 Gas 2023 - - - - 104.70 111.90 84.45 8.39 - - - 15.91 325.35 11,104.20$ SW34 825 @ A 28888 NEX - LEMOORE 5.55$ FW KGAL EBILL22640052023 Water 2023 1.69 0.96 1.55 0.89 1.01 1.09 1.40 2.05 1.57 1.14 0.90 1.10 15.35 85.19$ SW34 825 @ A 28888 NEX - LEMOORE 21.74$ NG MBTU EBILL22640052023 Gas 2023 - 0.28 96.88 97.44 - - - - - - - - 194.60 4,230.60$ SW34 825 @ A 28888 NEX - LEMOORE SE KGAL EBILL22640052023 Sewage 2023 - - - - - - - - - - - - - -$ SW34 825 @ A 28888 NEX - LEMOORE 111.66$ EL MWH EBILL22640052023 Electric 2023 3.11 2.96 4.77 2.28 3.33 2.85 3.87 3.06 3.05 3.78 3.04 3.03 39.13 4,369.26$

SW34 825 @ A 28888 NEX - LEMOORE 136.32$ EL MWH EBILL23012852024 Electric 2024 3.77 2.99 2.99 3.70 2.95 3.71 2.98 3.14 3.20 3.14 3.21 3.30 39.08 5,327.39$ SW34 825 @ A 28888 NEX - LEMOORE NG MBTU EBILL23012852024 Gas 2024 - - - - - - - - - - - 13.63 13.63 -$ SW34 825 @ A 28888 NEX - LEMOORE SE KGAL EBILL23012852024 Sewage 2024 - - - - - - - - - - - - - -$ SW34 825 @ A 28888 NEX - LEMOORE 5.57$ FW KGAL EBILL23012852024 Water 2024 1.34 0.92 1.00 0.72 0.68 0.76 0.73 0.96 1.86 0.53 1.13 1.00 11.63 64.78$ SW34 825 @ A 28888 NEX - LEMOORE 36.31$ NG MBTU EBILL23012852024 Gas 2024 - 10.57 8.89 6.39 26.47 14.53 3.35 - - - - - 70.20 2,548.96$

SW34 825 @ A 28888 NEX - LEMOORE 0.85$ SE KGAL CNIC Sewage 2025 - - - - - - - - - - - - - -$ SW34 825 @ A 28888 NEX - LEMOORE 116.24$ EL MWH CNIC Electric 2025 3.10 2.99 3.79 3.03 3.76 3.01 3.00 2.99 3.73 2.98 3.73 3.09 39.20 4,556.61$ SW34 825 @ A 28888 NEX - LEMOORE 5.04$ FW KGAL CNIC Water 2025 2.69 0.74 1.19 0.78 2.39 0.82 1.84 1.27 1.83 2.73 2.93 1.06 20.27 102.16$ SW34 825 @ A 28888 NEX - LEMOORE 17.53$ NG MBTU CNIC Gas 2025 - 0.28 25.51 52.06 96.05 29.51 22.21 2.79 1.66 - - 8.03 238.10 4,173.89$