This is Amendment 0005 to a Request for Proposal (RFP) for the repair and renovation of the ADM Baker Pool Complex at Naval Base San Diego. The amendment was issued on April 29, 2026, by the CNIC Facilities and Construction Contracting office (Contracting Officer: Alanna Young) in response to 15 Requests for Information (RFIs) submitted by prospective offerors. The solicitation number is NAVMWR-26-R-0029, and the amendment does not extend the offer receipt deadline.
The RFI responses address technical and design clarifications for the pool complex renovation, including: confirmation that fiber optic point-of-contact details, slide flume inner diameter specifications, and VGB suction pipe details will be provided during site visits; that no shade structure is required at the slide tower top; that the existing slide pump is inoperable (last operational in 2016) and the pool depth at the slide entry point is 12 feet; that the splash pad (approximately 800 square feet) is acceptable for ages 0-5 and may exceed the specified square footage to accommodate 15 spray units; that a 2,500-gallon treatment tank meeting national codes is acceptable (rather than California's 4,000-gallon requirement); that standard manufacturer warranties are acceptable; that splash pad treatment system location and dimensions will be provided during site visits; that three-phase power is believed available with access to be shown on-site; and that the wading pool plumbing and filtration is completely separate from the lap pool system with its own mechanical pump.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0007.pdf | ||
| Amendment 0006.pdf | ||
| ADM Baker Pool Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| NAVMWR-26-R-0029 Amendment 0002 Pre-Proposal Meeting.pdf | ||
| NAVMWR-26-R-0029 Amendment 0001.pdf | ||
| NAVMWR-26-R-0029.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
1 3
0005 29 April 26 ADM Baker Pool N25-07 N944
CNIC Facilities and Construction Contracting Alanna Young/ alanna.g.young.naf@us.navy.mil 5720 Integrity Drive, Lassen Building 457 Millington, TN 38055 901-574-0848
NAVMWR-26-R-0029
12 March 2026
NAVMWR-26-R-0029
Amendment 0005 NB San Diego Repair ADM Baker Pool Complex
1. This amendment is being issued in response to requests for information (RFIs)..
Alanna Young, Contracting Officer
22 Apr 2026
NAVMWR-26-R-0029 Repair ADM Baker Pool Complex NB San Diego
Page | 2 Amendment 0005
Block 14 Continued:
NAVMWR-26-R-0009 for the NB San Diego Repair ADM Baker Pool Project is to hereby incorporate the change to the Request for Proposal:
1. Answer the Following RFIs :
Q: 2: Can we see a detail of where the fiber optic point of contact is in the building?
A: 2: Can provide during site visit
Q: 3: Please advise Slide Manufacturer and a model number or footprint drawing
A: 3: N/A
Q: 4: What is the inner diameter of the fiberglass slide flumes? "31 ", 32" or 36" wide? Both slides please.
A: 4: Can provide during site visit
Q: 5: Do you want a shade structure at the top of the slide tower?
A: 5: No
Q: 6: Can we receive a photo of current suction pipe from the pool and current Virginias Graham Baker (VGB) set up? We can wait and see this during our site visit.
A: 6: Can provide during site visit
Q: 7: Is the slide pump in current working condition? Do we need to supply a new pump if the current unit can be re-used?
A: 7: Slide pump inop. Last time it was turned on was 2016.
Q:8: How deep is the pool where the slide enters the pool?
A: 8: 12 feet
Q:9: For the Splash Pad of approx. 800 square feet, we will design both above ground and below ground sprayers - we might exceed 800 square feet to fit the number of units requested (15) in the space. Is that acceptable? Is there a target age group?
A: 9: Yes, Ages 0-5
Q:10: The State of California requires a 4,000 gallon tank for all spray parks regardless of size (sometimes larger than necessary) - if our engineer designs a 2,500 gallon tank which meet all national codes is that OK?
NAVMWR-26-R-0029 Repair ADM Baker Pool Complex NB San Diego
Page | 3 Amendment 0005
A: 10: Yes
Q: 11: The RFP mentions 30 year warranty design. There are no warranties of that longevity from any manufacturer - We can offer standard warranties and a quarterly maintenance contract to extend the life of the splash pad and slide. (Extended warranty plan)
A: 11: A standard manufacturer warranty is acceptable. Yes
Q: 12: Is the splash pad treatment system required to be located within an existing mechanical building, or is a prefabricated system acceptable?
A: 12: How big is the system? Space may be limited in the current mechanical room. Can provide dimensions during walk though.
Q: 13: If an existing mechanical building is to be utilized, what space is available?
A: 13: Can provide information during site visit.
Q: 14: Is Single or Three Phase power at the electrical panel? How much amperage is available for use within that panel?
A: 14: I believe 3 phase however we have access and can show the power source for the facility.
Q: 15: Is the wading pool plumbing completely separate from the lap pool plumbing and filtration?
A: 15: Yes, wading pool has its own mechanical with pump.