N69450-21-R-0041-0002.pdf

PDF 203 KB Posted

Attached to
WEAPONS GENERATION FACILITY B EARLY START SITE Federal contract opportunity
Solicitation number
N69450-21-R-0041
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This modification amends a solicitation for early start site work at Barksdale Air Force Base in Louisiana. The work includes clearing, grading, drainage, environmental remediation, building demolition, utility relocation, fencing installation, and road construction across 53 acres to prepare for a large weapons generation facility. Interested offerors must submit a completed SF-312 nondisclosure agreement to receive the specifications and drawings, with proposals due by August 12, 2021. Unsuccessful offerors will destroy all solicitation materials after award.

View the file

Other files for this federal contract opportunity

Other files attached to WEAPONS GENERATION FACILITY B EARLY START SITE, newest first.
File Type Posted
N69450-21-R-0041-0001.pdf PDF
NEW Safety_Data_Sheet.docx DOCX document
SF-312 (Classified Information Nondisclosure Agreement).pdf PDF
Exhibit B Past Performance Questionnaire.docx DOCX document
Exhibit E SB Participation Commitment Doc.docx DOCX document
N6945021R0041.pdf PDF
Exhibit A Construction Experience Project Data Sheet.docx DOCX document
Exhibit D Historical SB Utilization.docx DOCX document
Attachment A ProjNet How To Guide.pdf PDF
Exhibit C Safety Data Sheet.docx DOCX document
Exhibit F Small Business Subcontracting Plan.doc DOC document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N69450-21-R-0041 - WEAPONS GENERATION FACILITY B EARLY START SITE WORK AT BARKSDALE AIR FORCE BASE, LA

1. This is to clarify the procedure to recieve the IFIO Specifications and Draw ings

2. Post SF-312 Classified Infomation Nondislosure Agreement

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Jul-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945021R0041

X 9B. DATED (SEE ITEM 11)

12-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Jul-2021

CODE

NAVFAC ENGINEERING SYSTEMS COMMAND SE

ROICC BARKSDALE

334 DAVIS AVE WEST STE 103

BARKSDALE LA 71110

N69450 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6945021R0041

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 2

1. The purpose of this amendment is to: (1) Clarify the procedure to receive Weapons Generation Facility Early Start “Issued for Information Only” Specifications and Drawings. (2) Provide SF-312 Classified Information Nondisclosure Agreement.

a. In order to receive the Weapons Generation Facility Early Start “Issued for Information

Only” Specifications and Drawings contractor POC must complete the posted SF‐312, provide an e‐mail contact and return to Herb Fusilier, herbert.l.fusilier.civ@us.navy.mil.

Once received, contractor point of contact will receive the specifications and drawings via DoD SAFE.

b. After award, all non‐successful contractors agree to destroy all Weapons Generation Facility Early Start Specifications and Drawings material.

2. Proposal due date remains unchanged at Thursday, 12 August 2021 at 3 pm Eastern Time.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .