AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Pre-Proposal Inquiries
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Jul-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945021Q0022
X 9B. DATED (SEE ITEM 11)
01-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Jul-2021
CODE
NAVFAC ENGINEERING SYSTEMS COMMAND SE
PWD CORPUS CHRISTI
8851 OCEAN DRIVE, BLDG 19
CORPUS CHRISTI TX 78419-5021
N69450 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
joel.overson@navy.milEMAIL:361-961-3397TEL:
JOEL OVERSON / CONTRACTING OFFICER
N6945021Q0022
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
PRE-PROPOSAL INQUIRIES
PRE-PROPOSAL INQUIRY
Solicitation Number: N6945021Q0022, NAS Corpus Christi, TX
Contractor Name: N/A
Contractor POC (Name and email): N/A
Contract or PPI#
Section of RFP Question Answer
Scope of Work
CLIN 0001
Request original plans so we can see how the portacachere is attached to the building.
Yes. We have the original plans (asbuilt drawings) for the Porte Cochere the shows the attachment to the building.
CLIN 0001
Request any information on lead based paint or asbestos.
We do not have any information on lead based paint nor asbestos for this facility.
CLIN 0001
We need confirmation on where the replacement shingles go.
The replacement shingles will be go on the portion of the main building roof that has been disconnected from the Porte Cochere.
This new hip roof with 4/12 pitch, 5/8” sheathing, building felt and shingles close and protect the disconnected hole in the front of the building above the main entrance.
CLIN 0001
Confirm whether or not the pedestal remain and get new caps after demo.
The pedestals are to be removed down to the base plate (ground level).
CLIN 0001 The pedestals are stucco on the exterior, not sure what’s under the stucco.( I would guess concrete footings). Please confirm.
The pedestals are to be removed. The canopy columns are behind the Stucco and CMU. The four main canopy columns have four individual canopy columns combined with one base plate each and four anchor bolts.
CLIN 0001
Please clarify the intention/preference for "base plate covers" in Scope Item 5-w.
Any low profile cover will present a trip hazard. Should a bollard-type structure be installed to cover the base plate and anchor bolts or does Customer want a low-profile metal cover?
No. A bollard structure shall not be installed to cover the base plate nor anchor bolts. The base plate cover is a simple way to prevent water from accessing the exposed base plates and anchor rods which can create corrosion to the new canopy column structure (anchor rods, bolts, base plates, and canopy columns).
N6945021Q0022
CLIN 0001
Can bollards to be removed be cut flush to grade? Or is entire steel tube to be removed?
Bollards removed shall be cut flush to grade.
CLIN 0001
Bollards closes to Lodge are cast in brick ribbon area. If entire bollard structure is to be removed, please confirm this brick ribbon will need to be restored or can concrete be poured in this area?
Bollards removed closes to Lodge cast in brick ribbon area shall be cut flush to grade.
CLIN 0001
Are existing metal benches to remain? Will Customer remove benches prior to construction or will Contractor be required to relocate?
No. The customer will remove and relocate the metal benches prior to construction.
10 Scope of Work
CLIN 0001
Are metal benches bolted down?
Will bolt holes need to be filled if benches are relocated?
No. The metal benches are not bolted down.
(End of Summary of Changes)