CLIN 0002 Roof_Attachment G_NASCC Spill Response Poster.pdf
PDF 1 MB Posted
- Attached to
- Bldg 99 Roof & Portico at NAS Corpus Christi, TX
- Solicitation number
- N6945021Q0022
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPILL RESPONSE INFORMATION
EXTREMELY IMPORTANT
ONLY RAIN MAY ENTER THE STORM DRAIN.
KEEP ALL CHEMICALS AND SPILLS FROM ENTERING STORM
DRAINS, BAYS, PONDS, & CRITICAL HABITAT.
WHAT TO DO
STEP 2 - SHUT OFF SOURCE OF SPILL, IF POSSIBLE.
STEP 3 - CONTAIN SPILL WITH PROPER ABSORBENTS IN
ASSIGNED SPILL KITS.
STEP 4 - NOTIFY COMMAND DUTY OFFICER (CDO)
361-534-9093.
STEP 5 - NOTIFY & SUBMIT SPILL REPORT WITH PHOTOS TO
ENVIRONMENTAL DEPT. 361-961-5353/3776/5356
SPILL KIT LOCATION:
BUILDING/HANGAR NO:
STEP 1 - IF MATERIAL SPILLED PRESENTS A POTENTIAL TO
HARM HUMAN LIFE, EVACUATE THE AREA
IMMEDIATELY. CALL 911.
Any AFFF even if spilled on concrete/asphalt.
Any Sanitary Sewer Overflow (SSO) or discharge.
Any sheen, discoloration, odor, or hazardous substance in storm drains/bays/ponds/grassy areas.
25 gallons or more of oil or fuel on concrete/asphalt.
Regulatory Reportable
Spills:
Spillers are responsible for cleanup actions and costs.
Spills not requiring regulatory notification, must still be reported to the Environmental Dept.
All staining and spill residuals must be photographed and explained.
Attachment G
Naval Air Station Corpus Christi Spill/Incidental Release Response Checklist
IN CASE OF EMERGENCY, CALL 911.
FOR REPORTABLE SPILLS, NOTIFY COMMAND DUTY OFFICER (CDO) 361-534-9093.
SUBMIT THIS SPILL REPORT WITH PHOTOS AND NOTIFY ENVIRONMENTAL DEPT. OF ALL SPILLS, INCLUDING NON-REPORTABLE/INCIDENTAL SPILLS, 361-961-5353/3776/5356.
Spillers are responsible for spill cleanup, report, and costs.
DATE:______TIME:______LOCATION:_______________________________________
REPORTING INDIVIDUAL:_________________________________________________
CONTACT INFORMATION:_________________________________________________
1. Time of occurrence:______
2. Type of emergency or chemical spilled:___________________________________
3. Number and types of injures:___________________________________________
4. Estimated quantity of spill:________gallons
5. Source of spill:_______________________________________________________
6. Behavior of spill;
1. Is fire or flammable chemicals involved?
2. Is spill flowing into storm drain?
3. Is spill flowing or on/toward soil?
4. Is spill flowing towards bay system?
5. Is the spill reactive?
RESPONDING AGENCY:___________________________________________________
ARRIVAL TIME OF RESPONDERS:______ CONTACT NUMBER:____________
Site assessment: _______________________________________________________ PPE required: __________________________________________________________ Remedial action taken: __________________________________________________
Incident completion time: ______
Incident report copied to: _________________________ Date: ______ Time: ______
YES NO
REPORTABLE SPILLS:
Any AFFF, Sanitary Sewer Overflow (SSO) or sewage discharge, even if spilled on concrete/asphalt.
Any sheen, discoloration, odor, or hazardous substance in storm drains/bays/ponds/grassy areas.
25 gallons or more of oil or fuel on concrete/asphalt.
Spills not requiring regulatory notification, must still be reported to Environmental. Take photos and explain all stains and residues.
Attachment G 2 of 3
FORM 8: DEWATERING AND VISUAL MONITORING CHECKLIST
To be completed for Dewatering Equipment Pits/Sumps/Manholes/Wells/ Secondary/Containment/ Transformer Substations/Small Infrastructure Repair Trenches and any other potential discharge to stormwater for projects less than 1 acre. NOT to be used for construction site dewatering, unless it is stated specifically in the Site Specific Stormwater Pollution Prevention Plan, Construction Stormwater Permit, or Notice of Intent and with prior approval from the Environmental Director. Follow Dewatering SOP: SPCC1
Please submit forms to: ross.ybarra@navy.mil and leticia.graves@navy.mil.
Include photos and sample results if available. EV Services: 961-3760/961-6826 *Spill Prevention/Tank Manager – Update SPCC Form 5 if dewatering is from Secondary Containment.
Name: Date: Time:
Email: Phone:
Last Rainfall: Volume Dewatered (gal):
Rainfall (in.): Rainfall Duration (hrs): Project Acres:
Location and Project:
___ Pit ___ Sump ___ Manhole ___ Transformer ___ Trench ___ Secondary Containment
___ Other (describe)
Source: ___Rainwater (uncovered) ___Groundwater/Infiltration ___ Potable/Drinking Water
Other (describe) Parameters No Yes Comments (If “yes”, list possible source of pollutant(s)).
Color
Odor
Floating Solids
Settled Solids
Suspended Solids
Foam
Oily Sheen
Other *If “Yes is checked, do not discharge to the storm drain. Coordinate with Environmental Dept., 961-2170/5356/5353 **If all responses are “No” advise EV of discharge and submit this form.
Discharge from Secondary Containment:
Time Valve Opened:
Time Valve Closed:
Discharge Location: __ Storm Drain
__ Stormwater Manhole
__Grassy Area
__ Oil Water Separator
___ Drum / Barrel for sampling and proper disposal (contact EV Services)
Best Management Practice (BMP) ___Filter Sock ___ Wattles ___Other (describe)
Is sludge being removed? ___ No ___ Yes (contact EV Services) 961-3760/6826
Volume or weight of sludge removed: _____ lbs. / _____ gallons
Will filter bag be discarded? ___ No ___ Yes (contact EV Services) 961-3760/6826
Was an oil-absorbent pad used to remove oily sheen and residue?
___ No ___ Yes (contact EV Services) 961-3760/6826
Equipment used for dewatering is free of contaminants.
___ Yes ___ No Stop! Not eligible for dewatering. New equipment must be used.
Attachment G
| Date 1: |
| TIME 1: |
| BUILDING #: |
| REPORTING INDIVIDUAL: |
| ACTIVITY NAME & NUMBER: |
| TIME 2: |
| CHEMICAL SPILLED: |
| INJURIES: |
| AMOUNT: |
| SPILL SOURCE: |
| RESPONDING AGENCY: |
| TIME 3: |
| Site assessment: |
| Remedial action taken: |
| Remedial action taken cont: |
| TIME 4: |
| REPORTING AGENCY: |
| DATE 2: |
| TIME 5: |
| PPE required cont: |
| PPE required: |
| Site assessment cont: |
| CONTACT NUMBER: |
| Check Box1: Off |
| 1: Off |
| 4: Off |
| 5: Off |
| 3: Off |
| 2: Off |
| 9: Off |
| 10: Off |
| 8: Off |
| 7: Off |
| 6: Off |
| Name: |
| Date: |
| Time: |
| Email: |
| Phone: |
| Last Rainfall: |
| Volume Dewatered gal: |
| Rainfall in: |
| Project Acres: |
| Location and Project: |
| Other describe: |
| Source: |
| Other describe_2: |
| Comments If yes list possible source of pollutantsColor: |
| Comments If yes list possible source of pollutantsOdor: |
| Comments If yes list possible source of pollutantsFloating Solids: |
| Comments If yes list possible source of pollutantsSettled Solids: |
| Comments If yes list possible source of pollutantsSuspended Solids: |
| Comments If yes list possible source of pollutantsFoam: |
| Comments If yes list possible source of pollutantsOily Sheen: |
| Comments If yes list possible source of pollutantsOther: |
| If all responses are No advise EV of discharge and submit this form: |
| Discharge from Secondary Containment: |
| Time Valve Opened: |
| Time Valve Closed: |
| Discharge Location: |
| Best Management Practice BMP: |
| Other describe_3: |
| Is sludge being removed: |
| lbs: |
| gallons: |
| Will filter bag be discarded: |
| Yes contact EV Services 96137606826: |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| Check Box36: Off |
| Check Box37: Off |
| Check Box38: Off |
| Check Box39: Off |
| Check Box40: Off |
| Check Box41: Off |
| Check Box42: Off |
| Check Box43: Off |
| Check Box44: Off |
| Check Box45: Off |
| Check Box46: Off |
| Check Box47: Off |
| Check Box48: Off |
| Check Box49: Off |
| Check Box50: Off |
| Check Box51: Off |
| Check Box52: Off |
| Check Box53: Off |
| Check Box54: Off |
| Check Box55: Off |
| Check Box56: Off |
| Check Box57: Off |
| Check Box58: Off |
| Check Box59: Off |
| Text60: |
File details come from the government source that posted it. Updated .