J-0200000-12_ELINs_0005.xlsx
XLSX spreadsheet 67 KB Posted
- Attached to
- NAS Corpus Christi and NOSC Harlingen MFSS
- Solicitation number
- N69450-20-R-0052
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6945020R0052-0006.pdf | ||
| N6945020R0052-0006_Attachments.zip | ZIP file | |
| N6945020R0052_0005.pdf | ||
| N6945020R0052_SectionJ_Technical_0005.pdf | ||
| N6945020R0052._0004zip.zip | ZIP file | |
| N6945020R0052_0004.pdf | ||
| N6945020R0052-0003.pdf | ||
| N6945020R0052_JL7_SiteVisitBriefpdf.pdf | ||
| N6945020R0052_JL8_SiteVisitAttendees.pdf | ||
| N6945020R0052_JL4_SiteVisitItinerary.pdf | ||
| N6945020R0052_00002.pdf | ||
| N6945020R0052_JL5.jpg | JPG image | |
| N6945020R0052_JL6_COVID19.pdf | ||
| N6945020R0052_00001.pdf | ||
| N6945020R0052_JL2_NASCC.xls | XLS spreadsheet | |
| N6945020R0052_JL3_SECNAV5512.pdf | ||
| N6945020R0052_Attachments.zip | ZIP file | |
| N6945020R0052.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001-Base Period
| Attachment J-0200000-12 |
| Exhibit Line Item Numbers |
| Solicitation No.: N69450-20-R-0052 |
| Line Item 0001 - Recurring Work - Base Period | |||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||
| ELIN/Sub-ELINs A001 through A012 | |||||
| Category | Sub-Category | ELIN | Sub-ELIN | Annex/Sub-annex | |
| Spec Item | Description | Spec Item 3 | |||
| Labor Hours | Spec Item 3 | ||||
| Labor Cost | Spec Item 3 | ||||
| Material Cost | Spec Item 3 | ||||
| Equipment Cost | Annex 0200000 and Functional Annexes' Spec Items 1 and 2 |
On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||||||
| Cost | Profit/Fee | Quantity | Unit of Measure | Unit Price | Total Price | ||||
| Facility Investment | Service Orders (CRNSE) | A001 | A001AA | 1502000 | 3.1.1 | Emergency Service Orders | 8 | EA | |
| Facility Investment | Service Orders (CRNSE) | A001 | A001AB | 1502000 | 3.1.2 | Urgent Service Orders | 20 | EA | |
| Facility Investment | Service Orders (CRNSE) | A001 | A001AC | 1502000 | 3.1.3 | Routine Service Orders | 116 | EA | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | A001 | A001AD | 1502000 | 3.2.1 | Auto Lifts | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | A001 | A001AF | 1502000 | 3.2.3 | Automatic Doors | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | A001 | A001AH | 1502000 | 3.2.5 | Boilers and Unfired Pressure Vessels (UPV) | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | A001 | A001AM | 1502000 | 3.2.9 | HVAC and Refrigeration Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | A001 | A001AQ | 1502000 | 3.2.12 | Vertical Transportation Equipment (VTE) and Systems | 12 | MO | |
| Facility Investment | Other Recurring Services Program (CRNSE) | A001 | A001AR | 1502000 | 3.3.1 | Exhaust Hoods and Ducts | 12 | MO | |
| Facility Investment | Other Recurring Services Program (CRNSE) | A001 | A001AS | 1502000 | 3.3.2 | Water Softening Services | 12 | MO | |
| Facility Investment | Service Orders (CCAD) | A002 | A002AA | 1502000 | 3.1.1 | Emergency Service Orders | 4 | EA | |
| Facility Investment | Service Orders (CCAD) | A002 | A002AB | 1502000 | 3.1.2 | Urgent Service Orders | 10 | EA | |
| Facility Investment | Service Orders (CCAD) | A002 | A002AC | 1502000 | 3.1.3 | Routine Service Orders | 20 | EA | |
| Facility Investment | Preventive Maintenance Program (CCAD) | A002 | A002AD | 1502000 | 3.2.12 | Vertical Transportation Equipment (VTE) and Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (Navy Lodge) | A003 | A003AA | 1502000 | 3.2.3 | Automatic Doors | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (Navy Lodge) | A003 | A003AB | 1502000 | 3.2.12 | Vertical Transportation Equipment (VTE) and Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (DLA) | A004 | A004AA | 1502000 | 3.2.9 | HVAC and Refrigeration Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (DLA) | A004 | A004AB | 1502000 | 3.2.12 | Vertical Transportation Equipment (VTE) and Systems | 12 | MO | |
| Facility Investment | Other Recurring Services Program (MWR) | A005 | A005AA | 1502000 | 3.3.1 | Exhaust Hoods and Ducts | 12 | MO | |
| Facility Investment | Service Orders (NOSC Harlingen) | A006 | A006AA | 1502000 | 3.1.1 | Emergency Service Orders | 4 | EA | |
| Facility Investment | Service Orders (NOSC Harlingen) | A006 | A006AB | 1502000 | 3.1.2 | Urgent Service Orders | 10 | EA | |
| Facility Investment | Service Orders (NOSC Harlingen) | A006 | A006AC | 1502000 | 3.1.3 | Routine Service Orders | 20 | EA | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | A006 | A006AE | 1502000 | 3.2.2 | Automated Gate | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | A006 | A006AG | 1502000 | 3.2.4 | Auxillary Generators | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | A006 | A006AH | 1502000 | 3.2.5 | Boilers and Unfired Pressure Vessels (UPV) | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | A006 | A006AJ | 1502000 | 3.2.6 | Compressed Air Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | A006 | A006AK | 1502000 | 3.2.7 | Emergency Light Testing and Maintenance | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | A006 | A006AL | 1502000 | 3.2.8 | Fire Protection Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | A006 | A006AM | 1502000 | 3.2.9 | HVAC and Refrigeration Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | A006 | A006AN | 1502000 | 3.2.10 | Hurricane Shutters | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | A006 | A006AP | 1502000 | 3.2.11 | Intrusion Detection Systems | 12 | MO | |
| Custodial | Custodial (NOSC Harlingen) | A007 | A007AA | 1503010 | 3.1 | Scheduled Services | 12 | MO | |
| Custodial | Custodial (NOSC Harlingen) | A007 | A007AB | 1503010 | 3.2 | Custodial Service Orders | 24 | EA | |
| Other (Swimming Pools) | Other (Swimming Pools) (CRNSE) | A008 | A008AA | 1503040 | 3.1 | Pool Operator Maintenance | 12 | MO | |
| Grounds Maintenance and Landscaping | Grounds Maintenance and Landscaping (NOSC Harlingen) | A009 | A009AA | 1503050 | 3.1 | Improved Grounds | 12 | MO | |
| Grounds Maintenance and Landscaping | Grounds Maintenance and Landscaping (NOSC Harlingen) | A009 | A009AB | 1503050 | 3.4 | Grounds Maintenance Service Orders | 12 | EA | |
| Wastewater | Wastewater (CRNSE) | A010 | A010AA | 1604000 | 3.1 | Preventative Maintenance | 12 | MO | |
| Water | Water (CRNSE) | A011 | A011AA | 1606000 | 3.1 | Preventative Maintenance Program | 12 | MO | |
| BSVE | Recurring Work (CRNSE) | A012 | A012AA | 1700000 | 3.1.1 | Firefighting Apparatus Equipment Certification | 12 | MO | |
| Total Recurring Functions Base Year |
CLIN 0002 - Base Period
| Attachment J-0200000-12 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N69450-20-R-052 |
| Line Item 0002 - Non-recurring - Base Period |
| Provide Prices for Non-recurring Work in accordance with Section C, Spec Item 4 |
| ELINs A700 through A720 |
| ELIN | Product Name | Description | Spec Item 4 | |
| Labor Hours | Spec Item 4 | |||
| Labor Cost | Spec Item 4 | |||
| Material Cost | Spec Item 4 | |||
| Equipment Cost | Annex 0200000 and Functional Annexes' Spec Items 1 and 2 |
On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site Cost | Profit/Fee | Estimated Quantity | Unit of Measure | Unit Price | Extended Price | |||||||
| A700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | |||||||||||
| 500 | 500 | HR | |||||||||||
| A701 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A702. | $25,000.00 | $25,000.00 | 100,000 | EA | $1.00 | $100,000.00 | |||||
| A702 | High Cleaning Above 10 feet |
Available on FedMall or via Task Order. All high dusting above 10 feet shall to be performed with ladders, scissors lifts, or similar piece of equipment to ensure access the all high cleaning area and the safety of Contractor employees. All dust and debris shall be removed. Surfaces below the work shall be protected from dust and debris.
| Completion Time: 10 Days | 20 | HF | ||
| A703 | Interior Window Cleaning |
Available on FedMall or via Task Order. The Contractor shall clean window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas.
| Completion Time: 10 Days | 10 | HF | ||
| A704 | Exterior Window Cleaning |
Available on FedMall or via Task Order. The Contractor shall clean window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas.
Where storm windows exist, the Contractor shall clean both sides of the storm window and the outside of the inner glass.
Where window screens exist, the Contractor shall remove, clean and replace window screeen.
| Completion Time: 10 Days | 12 | HF | ||
| A705 | Window Blind Cleaning |
Available on FedMall or via Task Order. Blinds shall cleaned. If removed for cleaning, blinds are returned to their original location within two working days.
| Completion Time: 10 Days | 50 | EA | ||
| A706 | Stripping, Coating, and Buffing - 4 Coats |
Available on FedMall or via Task Order. The Contractor shall strip and rewax floors to ensure that floors are clean and sightly. Floors are cleaned, free of previously applied wax, and have a uniform gloss finish. Four Coats provides for approximately 3.5 months of wear.
| Completion Time: 10 Days | 10 | HF | ||
| A707 | Carpet and Rug Deep Cleaning |
Available on FedMall or via Task Order. The Contractor shall deep clean carpets and rugs to ensure that floors are clean and sightly. Acceptable methods for deep cleaning include shampooing, chemical extraction, steam cleaning, and other similar deep cleaning processes. Shampooed carpets shall be free of streaks, spots, and stains.
Where furniture and/or other equipment exist, the Contractor shall remove furniture or other equipment prior to carpet and rug deep cleaning. After carpet or rug dries, the Contractor shall return furniture and/or other equipment to their original position.
| Completion Time: 10 Days | 10 | HF | ||
| A708 | Restroom Cleaning |
Available on FedMall or via Task Order.
The Contractor shall clean and disinfect restrooms to ensure they are clean, sanitary, and free of offensive odors. Restroom service shall include task, such as: clean and disinfect floors, walls, partitions, fixtures, mirrors, locker rooms, and shower areas including shower mat and curtain, remove graffiti from restroom surfaces and empty trash containers.
Restroom supplies include toilet paper, toilet seat protectors, soap, and paper towels shall be replenished.
| Completion Time: period of performance will be specified when ordered. | 1000 | HF | ||
| A709 | Special Event Grass Cutting |
Available on FedMall or via Task Order. Grass shall be mowed and trimmed to a uniform height of 3 inches. Clippings and debris shall be removed.
| Complete all work within 3 calendar days. | 1900 | HF | ||
| A710 | Special Event Edging |
Available on FedMall or via Task Order. Edging to provide a uniform edged cut. All clippings shall be removed.
| Complete all work within 3 calendar days. | 10000 | LF | ||
| A711 | Hedge Pruning |
Available on FedMall or via Task Order. The Contractor shall prune hedges according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 20 | EA | ||
| A712 | Shrub Pruning |
Available on FedMall or via Task Order. The Contractor shall prune shrubs according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 50 | EA | ||
| A713 | Tree Pruning |
DBH up to 8 inches
Available on FedMall or via Task Order. The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 6 | EA | ||
| A714 | Tree Pruning |
DBH from 8 to 25 inches
Available on FedMall or via Task Order. The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 6 | EA | ||
| A715 | Tree Pruning |
DBH from 25 to 36 inches
Available on FedMall or via Task Order. The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 8 | EA | ||
| A716 | Tree Pruning |
DBH from 36 inches and larger
Available on FedMall or via Task Order. The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 8 | EA | ||
| A717 | Tree and Stump Removal |
DBH up to 8 inches
Available on FedMall or via Task Order. Remove trees including stumps and roots. Remove stumps and remove roots to 4 inches below ground level. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | 10 | EA | ||
| A718 | Tree and Stump Removal |
DBH from 8 to 25 inches
Available on DoD E-Mall Remove trees including stumps and roots. Remove stumps and remove roots to 4 inches below ground level. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | 10 | EA | ||
| A719 | Tree and Stump Removal |
DBH from 25 to 36 inches
Available on FedMall or via Task Order. Remove trees including stumps and roots. Remove stumps and remove roots to 4 inches below ground level. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
| Work shall be completed within 7 calendar days. | 12 | EA | ||
| A720 | Tree and Stump Removal |
DBH from 36 inches and larger
Available on FedMall or via Task Order. Remove trees including stumps and roots. Remove stumps and remove roots to 4 inches below ground level. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
| Work shall be completed within 7 calendar days. | 12 | EA | |
| Total Non-recurring Work: |
CLIN 0003 - 1st Option Period
| Attachment J-0200000-12 |
| Exhibit Line Item Numbers |
| Solicitation No.: N69450-20-R-0052 |
| Line Item 0003 - Recurring Work - Option Year One | |||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||
| ELIN/Sub-ELINs B001 through B012 | |||||
| Category | Sub-Category | ELIN | Sub-ELIN | Annex/Sub-annex | |
| Spec Item | Description | Spec Item 3 | |||
| Labor Hours | Spec Item 3 | ||||
| Labor Cost | Spec Item 3 | ||||
| Material Cost | Spec Item 3 | ||||
| Equipment Cost | Annex 0200000 and Functional Annexes' Spec Items 1 and 2 |
On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||||||
| Cost | Profit/Fee | Quantity | Unit of Measure | Unit Price | Total Price | ||||
| Facility Investment | Service Orders (CRNSE) | B001 | B001AA | 1502000 | 3.1.1 | Emergency Service Orders | 8 | EA | |
| Facility Investment | Service Orders (CRNSE) | B001 | B001AB | 1502000 | 3.1.2 | Urgent Service Orders | 19 | EA | |
| Facility Investment | Service Orders (CRNSE) | B001 | B001AC | 1502000 | 3.1.3 | Routine Service Orders | 115 | EA | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | B001 | B001AD | 1502000 | 3.2.1 | Auto Lifts | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | B001 | B001AF | 1502000 | 3.2.3 | Automatic Doors | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | B001 | B001AH | 1502000 | 3.2.5 | Boilers and Unfired Pressure Vessels (UPV) | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | B001 | B001AM | 1502000 | 3.2.9 | HVAC and Refrigeration Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | B001 | B001AQ | 1502000 | 3.2.12 | Vertical Transportation Equipment (VTE) and Systems | 12 | MO | |
| Facility Investment | Other Recurring Services Program (CRNSE) | B001 | B001AR | 1502000 | 3.3.1 | Exhaust Hoods and Ducts | 12 | MO | |
| Facility Investment | Other Recurring Services Program (CRNSE) | B001 | B001AS | 1502000 | 3.3.2 | Water Softening Services | 12 | MO | |
| Facility Investment | Service Orders (CCAD) | B002 | B002AA | 1502000 | 3.1.1 | Emergency Service Orders | 4 | EA | |
| Facility Investment | Service Orders (CCAD) | B002 | B002AB | 1502000 | 3.1.2 | Urgent Service Orders | 10 | EA | |
| Facility Investment | Service Orders (CCAD) | B002 | B002AC | 1502000 | 3.1.3 | Routine Service Orders | 20 | EA | |
| Facility Investment | Preventive Maintenance Program (CCAD) | B002 | B002AD | 1502000 | 3.2.12 | Vertical Transportation Equipment (VTE) and Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (Navy Lodge) | B003 | B003AA | 1502000 | 3.2.3 | Automatic Doors | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (Navy Lodge) | B003 | B003AB | 1502000 | 3.2.12 | Vertical Transportation Equipment (VTE) and Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (DLA) | B004 | B004AA | 1502000 | 3.2.9 | HVAC and Refrigeration Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (DLA) | B004 | B004AB | 1502000 | 3.2.12 | Vertical Transportation Equipment (VTE) and Systems | 12 | MO | |
| Facility Investment | Other Recurring Services Program (MWR) | B005 | B005AA | 1502000 | 3.3.1 | Exhaust Hoods and Ducts | 12 | MO | |
| Facility Investment | Service Orders (NOSC Harlingen) | B006 | B006AA | 1502000 | 3.1.1 | Emergency Service Orders | 4 | EA | |
| Facility Investment | Service Orders (NOSC Harlingen) | B006 | B006AB | 1502000 | 3.1.2 | Urgent Service Orders | 10 | EA | |
| Facility Investment | Service Orders (NOSC Harlingen) | B006 | B006AC | 1502000 | 3.1.3 | Routine Service Orders | 20 | EA | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | B006 | B006AE | 1502000 | 3.2.2 | Automated Gate | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | B006 | B006AG | 1502000 | 3.2.4 | Auxillary Generators | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | B006 | B006AH | 1502000 | 3.2.5 | Boilers and Unfired Pressure Vessels (UPV) | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | B006 | B006AJ | 1502000 | 3.2.6 | Compressed Air Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | B006 | B006AK | 1502000 | 3.2.7 | Emergency Light Testing and Maintenance | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | B006 | B006AL | 1502000 | 3.2.8 | Fire Protection Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | B006 | B006AM | 1502000 | 3.2.9 | HVAC and Refrigeration Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | B006 | B006AN | 1502000 | 3.2.10 | Hurricane Shutters | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | B006 | B006AP | 1502000 | 3.2.11 | Intrusion Detection Systems | 12 | MO | |
| Custodial | Custodial (NOSC Harlingen) | B007 | B007AA | 1503010 | 3.1 | Scheduled Services | 12 | MO | |
| Custodial | Custodial (NOSC Harlingen) | B007 | B007AB | 1503010 | 3.2 | Custodial Service Orders | 24 | EA | |
| Other (Swimming Pools) | Other (Swimming Pools) (CRNSE) | B008 | B008AA | 1503040 | 3.1 | Pool Operator Maintenance | 12 | MO | |
| Grounds Maintenance and Landscaping | Grounds Maintenance and Landscaping (NOSC Harlingen) | B009 | B009AA | 1503050 | 3.1 | Improved Grounds | 12 | MO | |
| Grounds Maintenance and Landscaping | Grounds Maintenance and Landscaping (NOSC Harlingen) | B009 | B009AB | 1503050 | 3.4 | Grounds Maintenance Service Orders | 12 | EA | |
| Wastewater | Wastewater (CRNSE) | B010 | B010AA | 1604000 | 3.1 | Preventative Maintenance | 12 | MO | |
| Water | Water (CRNSE) | B011 | B011AA | 1606000 | 3.1 | Preventative Maintenance Program | 12 | MO | |
| BSVE | Recurring Work (CRNSE) | B012 | B012AA | 1700000 | 3.1.1 | Firefighting Apparatus Equipment Certification | 12 | MO | |
| Total Recurring Functions Option Year One |
CLIN 0004 - 1st Option Period
| Attachment J-0200000-12 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N69450-20-R-052 |
| Line Item 0004 - Non-recurring - Option Period One |
| Provide Prices for Non-recurring Work in accordance with Section C, Spec Item 4 |
| ELINs B700 through B720 |
| ELIN | Product Name | Description | Spec Item 4 | |
| Labor Hours | Spec Item 4 | |||
| Labor Cost | Spec Item 4 | |||
| Material Cost | Spec Item 4 | |||
| Equipment Cost | Annex 0200000 and Functional Annexes' Spec Items 1 and 2 |
On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site Cost | Profit/Fee | Estimated Quantity | Unit of Measure | Unit Price | Extended Price | ||||||
| B700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | ||||||||||
| 500 | HR | |||||||||||
| B701 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A702. | $50,000.00 | $50,000.00 | 100,000 | EA | $1.00 | $100,000.00 | ||||
| B702 | High Cleaning Above 10 feet |
Available on FedMall or via Task Order. All high dusting above 10 feet shall to be performed with ladders, scissors lifts, or similar piece of equipment to ensure access the all high cleaning area and the safety of Contractor employees. All dust and debris shall be removed. Surfaces below the work shall be protected from dust and debris.
| Completion Time: 10 Days | 20 | HF | ||
| B703 | Interior Window Cleaning |
Available on FedMall or via Task Order. The Contractor shall clean window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas.
| Completion Time: 10 Days | 10 | HF | ||
| B704 | Exterior Window Cleaning |
Available on FedMall or via Task Order. The Contractor shall clean window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas.
Where storm windows exist, the Contractor shall clean both sides of the storm window and the outside of the inner glass.
Where window screens exist, the Contractor shall remove, clean and replace window screeen.
| Completion Time: 10 Days | 11 | HF | ||
| B705 | Window Blind Cleaning |
Available on FedMall or via Task Order. Blinds shall cleaned. If removed for cleaning, blinds are returned to their original location within two working days.
| Completion Time: 10 Days | 50 | EA | ||
| B706 | Stripping, Coating, and Buffing - 4 Coats |
Available on FedMall or via Task Order. The Contractor shall strip and rewax floors to ensure that floors are clean and sightly. Floors are cleaned, free of previously applied wax, and have a uniform gloss finish. Four Coats provides for approximately 3.5 months of wear.
| Completion Time: 10 Days | 10 | HF | ||
| B707 | Carpet and Rug Deep Cleaning |
Available on FedMall or via Task Order. The Contractor shall deep clean carpets and rugs to ensure that floors are clean and sightly. Acceptable methods for deep cleaning include shampooing, chemical extraction, steam cleaning, and other similar deep cleaning processes. Shampooed carpets shall be free of streaks, spots, and stains.
Where furniture and/or other equipment exist, the Contractor shall remove furniture or other equipment prior to carpet and rug deep cleaning. After carpet or rug dries, the Contractor shall return furniture and/or other equipment to their original position.
| Completion Time: 10 Days | 10 | HF | ||
| B708 | Restroom Cleaning |
Available on FedMall or via Task Order.
The Contractor shall clean and disinfect restrooms to ensure they are clean, sanitary, and free of offensive odors. Restroom service shall include task, such as: clean and disinfect floors, walls, partitions, fixtures, mirrors, locker rooms, and shower areas including shower mat and curtain, remove graffiti from restroom surfaces and empty trash containers.
Restroom supplies include toilet paper, toilet seat protectors, soap, and paper towels shall be replenished.
| Completion Time: period of performance will be specified when ordered. | 1000 | HF | ||
| B709 | Special Event Grass Cutting |
Available on FedMall or via Task Order. Grass shall be mowed and trimmed to a uniform height of 3 inches. Clippings and debris shall be removed.
| Complete all work within 3 calendar days. | 1900 | HF | ||
| B710 | Special Event Edging |
Available on FedMall or via Task Order. Edging to provide a uniform edged cut. All clippings shall be removed.
| Complete all work within 3 calendar days. | 10000 | LF | ||
| B711 | Hedge Pruning |
Available on FedMall or via Task Order. The Contractor shall prune hedges according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 20 | EA | ||
| B712 | Shrub Pruning |
Available on FedMall or via Task Order. The Contractor shall prune shrubs according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 50 | EA | ||
| B713 | Tree Pruning |
DBH up to 8 inches
Available on FedMall or via Task Order. The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 5 | EA | ||
| B714 | Tree Pruning |
DBH from 8 to 25 inches
Available on FedMall or via Task Order. The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 6 | EA | ||
| B715 | Tree Pruning |
DBH from 25 to 36 inches
Available on FedMall or via Task Order. The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 7 | EA | ||
| B716 | Tree Pruning |
DBH from 36 inches and larger
Available on FedMall or via Task Order. The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 8 | EA | ||
| B717 | Tree and Stump Removal |
DBH up to 8 inches
Available on FedMall or via Task Order. Remove trees including stumps and roots. Remove stumps and remove roots to 4 inches below ground level. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | 9 | EA | ||
| B718 | Tree and Stump Removal |
DBH from 8 to 25 inches
Available on DoD E-Mall Remove trees including stumps and roots. Remove stumps and remove roots to 4 inches below ground level. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | 10 | EA | ||
| B719 | Tree and Stump Removal |
DBH from 25 to 36 inches
Available on FedMall or via Task Order. Remove trees including stumps and roots. Remove stumps and remove roots to 4 inches below ground level. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
| Work shall be completed within 7 calendar days. | 11 | EA | ||
| B720 | Tree and Stump Removal |
DBH from 36 inches and larger
Available on FedMall or via Task Order. Remove trees including stumps and roots. Remove stumps and remove roots to 4 inches below ground level. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
| Work shall be completed within 7 calendar days. | 12 | EA | |
| Total Non-recurring Work: |
CLIN 0005 -2nd Option Period
| Attachment J-0200000-12 |
| Exhibit Line Item Numbers |
| Solicitation No.: N69450-20-R-0052 |
| Line Item 0005 - Recurring Work - Option Year Two | |||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||
| ELIN/Sub-ELINs C001 through C012 | |||||
| Category | Sub-Category | ELIN | Sub-ELIN | Annex/Sub-annex | |
| Spec Item | Description | Spec Item 3 | |||
| Labor Hours | Spec Item 3 | ||||
| Labor Cost | Spec Item 3 | ||||
| Material Cost | Spec Item 3 | ||||
| Equipment Cost | Annex 0200000 and Functional Annexes' Spec Items 1 and 2 |
On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||||||
| Cost | Profit/Fee | Quantity | Unit of Measure | Unit Price | Total Price | ||||
| Facility Investment | Service Orders (CRNSE) | C001 | C001AA | 1502000 | 3.1.1 | Emergency Service Orders | 8 | EA | |
| Facility Investment | Service Orders (CRNSE) | C001 | C001AB | 1502000 | 3.1.2 | Urgent Service Orders | 19 | EA | |
| Facility Investment | Service Orders (CRNSE) | C001 | C001AC | 1502000 | 3.1.3 | Routine Service Orders | 115 | EA | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | C001 | C001AD | 1502000 | 3.2.1 | Auto Lifts | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | C001 | C001AF | 1502000 | 3.2.3 | Automatic Doors | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | C001 | C001AH | 1502000 | 3.2.5 | Boilers and Unfired Pressure Vessels (UPV) | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | C001 | C001AM | 1502000 | 3.2.9 | HVAC and Refrigeration Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | C001 | C001AQ | 1502000 | 3.2.12 | Vertical Transportation Equipment (VTE) and Systems | 12 | MO | |
| Facility Investment | Other Recurring Services Program (CRNSE) | C001 | C001AR | 1502000 | 3.3.1 | Exhaust Hoods and Ducts | 12 | MO | |
| Facility Investment | Other Recurring Services Program (CRNSE) | C001 | C001AS | 1502000 | 3.3.2 | Water Softening Services | 12 | MO | |
| Facility Investment | Service Orders (CCAD) | C002 | C002AA | 1502000 | 3.1.1 | Emergency Service Orders | 4 | EA | |
| Facility Investment | Service Orders (CCAD) | C002 | C002AB | 1502000 | 3.1.2 | Urgent Service Orders | 10 | EA | |
| Facility Investment | Service Orders (CCAD) | C002 | C002AC | 1502000 | 3.1.3 | Routine Service Orders | 20 | EA | |
| Facility Investment | Preventive Maintenance Program (CCAD) | C002 | C002AD | 1502000 | 3.2.12 | Vertical Transportation Equipment (VTE) and Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (Navy Lodge) | C003 | C003AA | 1502000 | 3.2.3 | Automatic Doors | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (Navy Lodge) | C003 | C003AB | 1502000 | 3.2.12 | Vertical Transportation Equipment (VTE) and Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (DLA) | C004 | C004AA | 1502000 | 3.2.9 | HVAC and Refrigeration Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (DLA) | C004 | C004AB | 1502000 | 3.2.12 | Vertical Transportation Equipment (VTE) and Systems | 12 | MO | |
| Facility Investment | Other Recurring Services Program (MWR) | C005 | C005AA | 1502000 | 3.3.1 | Exhaust Hoods and Ducts | 12 | MO | |
| Facility Investment | Service Orders (NOSC Harlingen) | C006 | C006AA | 1502000 | 3.1.1 | Emergency Service Orders | 4 | EA | |
| Facility Investment | Service Orders (NOSC Harlingen) | C006 | C006AB | 1502000 | 3.1.2 | Urgent Service Orders | 10 | EA | |
| Facility Investment | Service Orders (NOSC Harlingen) | C006 | C006AC | 1502000 | 3.1.3 | Routine Service Orders | 20 | EA | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | C006 | C006AE | 1502000 | 3.2.2 | Automated Gate | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | C006 | C006AG | 1502000 | 3.2.4 | Auxillary Generators | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | C006 | C006AH | 1502000 | 3.2.5 | Boilers and Unfired Pressure Vessels (UPV) | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | C006 | C006AJ | 1502000 | 3.2.6 | Compressed Air Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | C006 | C006AK | 1502000 | 3.2.7 | Emergency Light Testing and Maintenance | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | C006 | C006AL | 1502000 | 3.2.8 | Fire Protection Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | C006 | C006AM | 1502000 | 3.2.9 | HVAC and Refrigeration Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | C006 | C006AN | 1502000 | 3.2.10 | Hurricane Shutters | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | C006 | C006AP | 1502000 | 3.2.11 | Intrusion Detection Systems | 12 | MO | |
| Custodial | Custodial (NOSC Harlingen) | C007 | C007AA | 1503010 | 3.1 | Scheduled Services | 12 | MO | |
| Custodial | Custodial (NOSC Harlingen) | C007 | C007AB | 1503010 | 3.2 | Custodial Service Orders | 24 | EA | |
| Other (Swimming Pools) | Other (Swimming Pools) (CRNSE) | C008 | C008AA | 1503040 | 3.1 | Pool Operator Maintenance | 12 | MO | |
| Grounds Maintenance and Landscaping | Grounds Maintenance and Landscaping (NOSC Harlingen) | C009 | C009AA | 1503050 | 3.1 | Improved Grounds | 12 | MO | |
| Grounds Maintenance and Landscaping | Grounds Maintenance and Landscaping (NOSC Harlingen) | C009 | C009AB | 1503050 | 3.4 | Grounds Maintenance Service Orders | 12 | EA | |
| Wastewater | Wastewater (CRNSE) | C010 | C010AA | 1604000 | 3.1 | Preventative Maintenance | 12 | MO | |
| Water | Water (CRNSE) | C011 | C011AA | 1606000 | 3.1 | Preventative Maintenance Program | 12 | MO | |
| BSVE | Recurring Work (CRNSE) | C012 | C012AA | 1700000 | 3.1.1 | Firefighting Apparatus Equipment Certification | 12 | MO | |
| Total Recurring Functions Option Year Two |
CLIN 0006 - 2nd Option Period
| Attachment J-0200000-12 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N69450-20-R-0052 |
| Line Item 0006 - Non-recurring - Option Period Two |
| Provide Prices for Non-recurring Work in accordance with Section C, Spec Item 4 |
| ELINs C700 through C720 |
| ELIN | Product Name | Description | Spec Item 4 | |
| Labor Hours | Spec Item 4 | |||
| Labor Cost | Spec Item 4 | |||
| Material Cost | Spec Item 4 | |||
| Equipment Cost | Annex 0200000 and Functional Annexes' Spec Items 1 and 2 |
On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site Cost | Profit/Fee | Estimated Quantity | Unit of Measure | Unit Price | Extended Price | |||||||
| C700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | |||||||||||
| 500 | 500 | HR | |||||||||||
| C701 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A702. | $50,000.00 | $50,000.00 | 100,000 | EA | $1.00 | $100,000.00 | |||||
| C702 | High Cleaning Above 10 feet |
Available on FedMall or via Task Order. All high dusting above 10 feet shall to be performed with ladders, scissors lifts, or similar piece of equipment to ensure access the all high cleaning area and the safety of Contractor employees. All dust and debris shall be removed. Surfaces below the work shall be protected from dust and debris.
| Completion Time: 10 Days | 20 | HF | ||
| C703 | Interior Window Cleaning |
Available on FedMall or via Task Order. The Contractor shall clean window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas.
| Completion Time: 10 Days | 10 | HF | ||
| C704 | Exterior Window Cleaning |
Available on FedMall or via Task Order. The Contractor shall clean window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas.
Where storm windows exist, the Contractor shall clean both sides of the storm window and the outside of the inner glass.
Where window screens exist, the Contractor shall remove, clean and replace window screeen.
| Completion Time: 10 Days | 11 | HF | ||
| C705 | Window Blind Cleaning |
Available on FedMall or via Task Order. Blinds shall cleaned. If removed for cleaning, blinds are returned to their original location within two working days.
| Completion Time: 10 Days | 50 | EA | ||
| C706 | Stripping, Coating, and Buffing - 4 Coats |
Available on FedMall or via Task Order. The Contractor shall strip and rewax floors to ensure that floors are clean and sightly. Floors are cleaned, free of previously applied wax, and have a uniform gloss finish. Four Coats provides for approximately 3.5 months of wear.
| Completion Time: 10 Days | 10 | HF | ||
| C707 | Carpet and Rug Deep Cleaning |
Available on FedMall or via Task Order. The Contractor shall deep clean carpets and rugs to ensure that floors are clean and sightly. Acceptable methods for deep cleaning include shampooing, chemical extraction, steam cleaning, and other similar deep cleaning processes. Shampooed carpets shall be free of streaks, spots, and stains.
Where furniture and/or other equipment exist, the Contractor shall remove furniture or other equipment prior to carpet and rug deep cleaning. After carpet or rug dries, the Contractor shall return furniture and/or other equipment to their original position.
| Completion Time: 10 Days | 10 | HF | ||
| C708 | Restroom Cleaning |
Available on FedMall or via Task Order.
The Contractor shall clean and disinfect restrooms to ensure they are clean, sanitary, and free of offensive odors. Restroom service shall include task, such as: clean and disinfect floors, walls, partitions, fixtures, mirrors, locker rooms, and shower areas including shower mat and curtain, remove graffiti from restroom surfaces and empty trash containers.
Restroom supplies include toilet paper, toilet seat protectors, soap, and paper towels shall be replenished.
| Completion Time: period of performance will be specified when ordered. | 1000 | HF | ||
| C709 | Special Event Grass Cutting |
Available on FedMall or via Task Order. Grass shall be mowed and trimmed to a uniform height of 3 inches. Clippings and debris shall be removed.
| Complete all work within 3 calendar days. | 1900 | HF | ||
| C710 | Special Event Edging |
Available on FedMall or via Task Order. Edging to provide a uniform edged cut. All clippings shall be removed.
| Complete all work within 3 calendar days. | 10000 | LF | ||
| C711 | Hedge Pruning |
Available on FedMall or via Task Order. The Contractor shall prune hedges according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 20 | EA | ||
| C712 | Shrub Pruning |
Available on FedMall or via Task Order. The Contractor shall prune shrubs according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 50 | EA | ||
| C713 | Tree Pruning |
DBH up to 8 inches
Available on FedMall or via Task Order. The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 5 | EA | ||
| C714 | Tree Pruning |
DBH from 8 to 25 inches
Available on FedMall or via Task Order. The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 6 | EA | ||
| C715 | Tree Pruning |
DBH from 25 to 36 inches
Available on FedMall or via Task Order. The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 7 | EA | ||
| C716 | Tree Pruning |
DBH from 36 inches and larger
Available on FedMall or via Task Order. The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped, balanced and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist and in accordance with UFGS UFGS-31 11 00
| Work shall be completed within 7 calendar days. | 8 | EA | ||
| C717 | Tree and Stump Removal |
DBH up to 8 inches
Available on FedMall or via Task Order. Remove trees including stumps and roots. Remove stumps and remove roots to 4 inches below ground level. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | 9 | EA | ||
| C718 | Tree and Stump Removal |
DBH from 8 to 25 inches
Available on DoD E-Mall Remove trees including stumps and roots. Remove stumps and remove roots to 4 inches below ground level. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | 10 | EA | ||
| C719 | Tree and Stump Removal |
DBH from 25 to 36 inches
Available on FedMall or via Task Order. Remove trees including stumps and roots. Remove stumps and remove roots to 4 inches below ground level. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
| Work shall be completed within 7 calendar days. | 11 | EA | ||
| C720 | Tree and Stump Removal |
DBH from 36 inches and larger
Available on FedMall or via Task Order. Remove trees including stumps and roots. Remove stumps and remove roots to 4 inches below ground level. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
| Work shall be completed within 7 calendar days. | 12 | EA | |
| Total Non-recurring Work: |
CLIN 0007 - 3rd Option Period
| Attachment J-0200000-12 |
| Exhibit Line Item Numbers |
| Solicitation No.: N69450-20-R-0052 |
| Line Item 0007 - Recurring Work - Option Year Three | |||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||
| ELIN/Sub-ELINs D001 through D012 | |||||
| Category | Sub-Category | ELIN | Sub-ELIN | Annex/Sub-annex | |
| Spec Item | Description | Spec Item 3 | |||
| Labor Hours | Spec Item 3 | ||||
| Labor Cost | Spec Item 3 | ||||
| Material Cost | Spec Item 3 | ||||
| Equipment Cost | Annex 0200000 and Functional Annexes' Spec Items 1 and 2 |
On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||||||
| Cost | Profit/Fee | Quantity | Unit of Measure | Unit Price | Total Price | ||||
| Facility Investment | Service Orders (CRNSE) | D001 | D001AA | 1502000 | 3.1.1 | Emergency Service Orders | 8 | EA | |
| Facility Investment | Service Orders (CRNSE) | D001 | D001AB | 1502000 | 3.1.2 | Urgent Service Orders | 19 | EA | |
| Facility Investment | Service Orders (CRNSE) | D001 | D001AC | 1502000 | 3.1.3 | Routine Service Orders | 115 | EA | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | D001 | D001AD | 1502000 | 3.2.1 | Auto Lifts | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | D001 | D001AF | 1502000 | 3.2.3 | Automatic Doors | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | D001 | D001AH | 1502000 | 3.2.5 | Boilers and Unfired Pressure Vessels (UPV) | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | D001 | D001AM | 1502000 | 3.2.9 | HVAC and Refrigeration Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (CRNSE) | D001 | D001AQ | 1502000 | 3.2.12 | Vertical Transportation Equipment (VTE) and Systems | 12 | MO | |
| Facility Investment | Other Recurring Services Program (CRNSE) | D001 | D001AR | 1502000 | 3.3.1 | Exhaust Hoods and Ducts | 12 | MO | |
| Facility Investment | Other Recurring Services Program (CRNSE) | D001 | D001AS | 1502000 | 3.3.2 | Water Softening Services | 12 | MO | |
| Facility Investment | Service Orders (CCAD) | D002 | D002AA | 1502000 | 3.1.1 | Emergency Service Orders | 4 | EA | |
| Facility Investment | Service Orders (CCAD) | D002 | D002AB | 1502000 | 3.1.2 | Urgent Service Orders | 10 | EA | |
| Facility Investment | Service Orders (CCAD) | D002 | D002AC | 1502000 | 3.1.3 | Routine Service Orders | 20 | EA | |
| Facility Investment | Preventive Maintenance Program (CCAD) | D002 | D002AD | 1502000 | 3.2.12 | Vertical Transportation Equipment (VTE) and Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (Navy Lodge) | D003 | D003AA | 1502000 | 3.2.3 | Automatic Doors | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (Navy Lodge) | D003 | D003AB | 1502000 | 3.2.12 | Vertical Transportation Equipment (VTE) and Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (DLA) | D004 | D004AA | 1502000 | 3.2.9 | HVAC and Refrigeration Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (DLA) | D004 | D004AB | 1502000 | 3.2.12 | Vertical Transportation Equipment (VTE) and Systems | 12 | MO | |
| Facility Investment | Other Recurring Services Program (MWR) | D005 | D005AA | 1502000 | 3.3.1 | Exhaust Hoods and Ducts | 12 | MO | |
| Facility Investment | Service Orders (NOSC Harlingen) | D006 | D006AA | 1502000 | 3.1.1 | Emergency Service Orders | 4 | EA | |
| Facility Investment | Service Orders (NOSC Harlingen) | D006 | D006AB | 1502000 | 3.1.2 | Urgent Service Orders | 10 | EA | |
| Facility Investment | Service Orders (NOSC Harlingen) | D006 | D006AC | 1502000 | 3.1.3 | Routine Service Orders | 20 | EA | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | D006 | D006AE | 1502000 | 3.2.2 | Automated Gate | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | D006 | D006AG | 1502000 | 3.2.4 | Auxillary Generators | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | D006 | D006AH | 1502000 | 3.2.5 | Boilers and Unfired Pressure Vessels (UPV) | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | D006 | D006AJ | 1502000 | 3.2.6 | Compressed Air Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | D006 | D006AK | 1502000 | 3.2.7 | Emergency Light Testing and Maintenance | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | D006 | D006AL | 1502000 | 3.2.8 | Fire Protection Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | D006 | D006AM | 1502000 | 3.2.9 | HVAC and Refrigeration Systems | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | D006 | D006AN | 1502000 | 3.2.10 | Hurricane Shutters | 12 | MO | |
| Facility Investment | Preventive Maintenance Program (NOSC Harlingen) | D006 | D006AP | 1502000 | 3.2.11 | Intrusion Detection Systems | 12 | MO | |
| Custodial | Custodial (NOSC Harlingen) | D007 | D007AA | 1503010 | 3.1 | Scheduled Services | 12 | MO | |
| Custodial | Custodial (NOSC Harlingen) | D007 | D007AB | 1503010 | 3.2 | Custodial Service Orders | 24 | EA | |
| Other (Swimming Pools) | Other (Swimming Pools) (CRNSE) | D008 | D008AA | 1503040 | 3.1 | Pool Operator Maintenance | 12 | MO | |
| Grounds Maintenance and Landscaping | Grounds Maintenance and Landscaping (NOSC Harlingen) | D009 | D009AA | 1503050 | 3.1 | Improved Grounds | 12 | MO | |
| Grounds Maintenance and Landscaping | Grounds Maintenance and Landscaping (NOSC Harlingen) | D009 | D009AB | 1503050 | 3.4 | Grounds Maintenance Service Orders | 12 | EA | |
| Wastewater | Wastewater (CRNSE) | D010 | D010AA | 1604000 | 3.1 | Preventative Maintenance | 12 | MO | |
| Water | Water (CRNSE) | D011 | D011AA | 1606000 | 3.1 | Preventative Maintenance Program | 12 | MO | |
| BSVE | Recurring Work (CRNSE) | D012 | D012AA | 1700000 | 3.1.1 | Firefighting Apparatus Equipment Certification | 12 | MO | |
| Total Recurring Functions Option Year Three |
CLIN 0008 - 3rd Option Period
| Attachment J-0200000-12 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N69450-20-R-0052 |
| Line Item 0008 - Non-recurring - Option Period Three |
| Provide Prices for Non-recurring Work in accordance with Section C, Spec Item 4 |
| ELINs D700 through D720 |
| ELIN | Product Name | Description | Spec Item 4 | |
| Labor Hours | Spec Item 4 | |||
| Labor Cost | Spec Item 4 | |||
| Material Cost | Spec Item 4 | |||
| Equipment Cost | Annex 0200000 and Functional Annexes' Spec Items 1 and 2 |
On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site Cost | Profit/Fee | Estimated Quantity | Unit of Measure | Unit Price | Extended Price | |||||||
| D700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | |||||||||||
| 500 | 500 | HR |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .