JL-7_N6945020R0010_Site Visit Brief.pdf
PDF 2 MB Posted
- Attached to
- Naval Station Guantanamo Bay Base Operations Support Services Federal contract opportunity
- Solicitation number
- N6945020R0010_Amend_0003
About this file
This briefing document summarizes a site visit for a Base Operations Support services solicitation at Naval Station Guantanamo Bay, Cuba. The solicitation requires services including family housing, facility management, custodial services, pest control, integrated solid waste management, grounds maintenance, utilities management, electrical services, wastewater management, water services, and vehicles and equipment. The contract is an indefinite-delivery, indefinite-quantity combination of fixed-price recurring work and IDIQ non-recurring work over one base year and four option years. The site visit agenda outlines facility tours over two days to familiarize offerors with requirements. Evaluation will use a best value tradeoff of technical and past performance factors weighing more than price alone. The amendment adds attendees to the site visit log.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6945020R0010_SectionC_0003.pdf | ||
| GPI-40_Man-Camp_location.pdf | ||
| N6945020R0010_0003.pdf | ||
| N6945020R0010_SectionJ-Techncial_Attachments_0003.xlsx | XLSX spreadsheet | |
| GPI-21_NAVSEAOP5_VOLUME1.pdf | ||
| JM-2_N6945020R0010_Safety_Data_0003.docx | DOCX document | |
| N6945020R0010_SectionJ_0003.pdf | ||
| JL-1_N6945020R0010_GPI Response_0003.pdf | ||
| JL-8_N6945020R0010_SiteVisit_SignIn_Sheets.pdf | ||
| GPI-44_HistoricalData.pdf | ||
| N6945020R0010_J020000013ELINs_0003.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC SOUTHEAST
Naval Facilities Engineering Command Southeast
Industry Forum
January 6, 2020
Naval Air Station Jacksonville
Jacksonville, Florida
Why are we here today?
Provide an overview of the Facilities Support
Contracting (FSC) Program
Provide information on upcoming Base Operations
Support (BOS) services solicitations
Provide information on NSGB
Provide an overview of the NSGB BOS Solicitation, Proposal Requirements and Considerations
Obtain feedback from industry
AGENDA
Introduction/NAVFAC SE Overview 0915-0930
Safety Discussion 0930-1000
FSC Program & Hot Topics 1000-1030
Base/Solicitation-Specific Brief 1030-1100
Q&A Session 1100-1200
The NAVFAC Mission/Vision
MISSION: Why We Exist
NAVFAC is the Naval Shore and Expeditionary Systems Command that plans, builds, and maintains sustainable facilities, delivers environmental, utilities and other base services, and acquires and manages expeditionary combat force systems and equipment.
VISION: To What We Aspire
We are the facilities technical and business experts with the total trust and confidence of the Navy and Marine Corps.
Fort Worth
Corpus Christi
Kingsville
Barksdale
Meridian
New Orleans
Gulfport Keesler
Pensacola Albany
Orlando
NAVFAC SE AOR
Shaw
Charleston
Beaufort
NAVFAC SE Organization
IPT South Atlantic IPT Gulf Coast IPT South & Central
• NAS Jacksonville • NAS Corpus Christi • NAS JRB Fort Worth
• NS Mayport • NAS Kingsville • NAS JRB New Orleans
• NSA Orlando • NAS Meridian • NS Guantanamo Bay
• NSB Kings Bay • NAS Pensacola • ROICC Barksdale
• NAS Key West • NAS Whiting Field • ROICC Charleston
• SOUTHCOM/Caribbean AOR • NSA Panama City
• CBC Gulfport
• NSA Mid-South
• Capital Improvements • Environmental
• Public Works • Asset Management
• Acquisition, Financial Management, CIO, Counsel • Contingency Engineering
NAVFAC Southeast
Safety Program
Presented By:
Dale J. Powell, CSP, CHST, CFPS
NAVFAC SE Safety Director
Discussion Topics
•Areas of Significant Emphasis for SE Safety:
•Safety Communication Tools
(WORM, ORM Tip Sheets, Program Fact Sheet, Metrics)
•NAVFAC SE Sub-Contractor Safety Initiative
•NAVFAC’s Use of ORM (Operational Risk management)
•Good Catch Reporting
Communication Tools
Good
Catch
Notice
WORM
•NAVFAC SE has created a Weekly Operational Risk
Management (WORM) assessment into our mishap prevention program. This unique and innovative program is designed to give a “look ahead” to core senior leadership and give local leadership an opportunity to ensure all safety mechanisms are in place before high risk activities begin work. The WORM is generated by the PWDs/ROICCs and forwarded to senior
FEC leadership the week prior to high risk activities.
Measuring Performance
Locations
ESAMS
Completion Mishap Near Miss
# of Stressors In-House Contractor
NAVFAC SE Core 56% N/A N/A N/A N/A 0 0
Albany 100% N/A N/A N/A 0 0 4
Barksdale 100% N/A N/A N/A 0 1 0
Beaufort 96% N/A N/A N/A 1.2 0 8
Charleston 99% N/A N/A N/A 0 0 1
Corpus Christi 90% 76% 140 1.8 0 1 0
Fort Worth 99% 97% 43 0.9 0.7 0 2
Gulfport 98% 94% 53 2 0.5 3 1
GTMO 96% 100% 14 0 0.1 0 2
Jacksonville (PWD) 92% 100% 13 0 0 2 1
Key West 90% 87% 303 1.8 0 0 1
Kings Bay 99% 94% 9 0 0.8 3 2
Kingsville 92% 92% 82 0 0.6 0 0
Mayport 91% 100% 10 0 0.5 1 11
Meridian 98% 98% 93 8.4 6.5 1 1
New Orleans 97% 100% 70 2.5 0.8 1 1
Orlando 100% N/A N/A N/A 3.2 0 0
Panama City 99% 99% 75 4 0 1 0
Pensacola 95% 98% 108 5.9 0.5 6 14
Shaw 85% N/A N/A N/A 0 0 0
Whiting 100% N/A N/A 2.8 0.7 0 0
FEC AVG 94% 95% 1013 2.2 0.8 20 49
90% or greater 95% or greater 1.0 or less 1.0 or less Zero
80% - 89% 90% - 94% 1.1 - 1.9 1.1 - 2.9
79% or less 89% or less 2.0 or greater 3.0 or greater 1 or greater
Trending Trending Trending Trending
Medical Surveillance DART Rate
NAVFAC SE Safety Metrics
MonthlyYear To Date
Report for: July-12
Individual Site
Consolidated to FEC Wide
Site Safety Metrics
• Incorporates six areas of safety management
• Identifies trends over the past six months
• Recognizes administrative hurdles in safety management
FEC Wide Metrics
• Reviewed and discussed by CO/XO/OPS at monthly mishap review boards
• Allows sites to see where they “rank” with other PWDs/ROICCs
• Utilizes existing data sources; minimal effort expensed
SE Sub Contractor Safety Initiative
Since OCT 2010, NAVFAC SE construction and service contracts have included provisions in the specifications that all subcontractors must meet:
Experience Modifier Rate not greater than 1.1 and DART rate not greater than 3.0.
0.67 0.73
0.78
0.67
0.37
0.53
0.66 0.64
1.9
0.2
0.4
0.6
0.8
1.2
1.4
1.6
1.8
FY13 FY14 FY15 FY16
F Y
D A
R T
R a te
NAVFAC SE DART Rate Trend
In-House
Contractor
Private Industry
* Updated Information is not Available
NAVFAC SE Operational Spectrum
ORM
CONSTRUCTION
MILCON
ENERGY
MAJOR MAINTENACE
MAJOR REPAIR/RENOVATION
IN-HOUSE WORK FORCE
WEIGHT HANDLING EQUIPMENT
FSC BOS CONTRACTS
FACILITY SERVICES
FACILITY MAINT. SPT
Good Catch Reporting Program
• Good catch reporting is anchored as one of the top safety measurement indicators for NAVFAC safety.
• Encourage and promote good catch reporting from our contracting partners through the following methods:
– Positive recognition from command suite
– Acknowledgement of the contractor’s safety program always improving
– Clearly demonstrates leadership’s active role in mishap prevention
Example of Good Catch Lessons Learned
NAVFAC Southeast
Facilities Support Contracting (FSC)
Program Overview
Presented By:
Charlie Smith
FSC Product Line Coordinator
Facility Support Contracts FY20 – FY22
Contract Type
Scope Location of Work
Approximate Scoping
Estimate/ Duration
Type Projected
RFP
Projected
Award Date
BOS
GUANTANAMO BAY BASE OPERATIONS
SUPPORT CONTRACT
Guantanamo Bay, Cuba $191M/5 yrs. LB FY20, Q1 FY20, Q4
MNT
CORPUS CHRISTI MULTI-FUNCTION
SUPPORT SERVICES CONTRACT
Corpus Christi, TX $5M/5 yrs. 8(a) FY20, Q1 FY20, Q4
MNT
GA/SC NOSCs MULTIFUNCTION
CONTRACT (SUBASE KINGS BAY, GA
AOR)
ATLANTA, GA
AUGUSTA, GA
COLUMBUS, GA
GREENVILLE, SC
COLUMBIA, SC
$5M/5 yrs. 8(a) FY20, Q2 FY20, Q4
MNT
TN/MO NOSCs MULTIFUNCTION
CONTRACT (NSA MILLINGTON, TN AOR)
CHATTANOOGA, TN
KNOXVILLE, TN
ST. LOUIS, MO,
KANSAS CITY, MO
$5M/5 yrs. SB FY20, Q2 FY20, Q4
MNT
SOUTH TEXAS REGIONAL INTEGRATED
SOLID WASTE MANAGEMENT
CONTRACT
Corpus Christi, TX
Kingsville, TX
South Texas Outlying
Fields
$5M/5 yrs. SB FY20, Q2 FY20 Q4
MNT
PENSACOLA INMATE LABOR
COORDINATION CONTRACT
Pensacola, FL $25M/5 yrs. SB FY20, Q2 FY20, Q4
BOS PANAMA CITY BOS CONTRACT Panama City, FL $27M/5 yrs. SDVOSB FY21, Q1 FY21, Q4
MNT
PANAMA CITY FACILITY SERVICES
CONTRACT
Panama City, FL $25M/5 yrs. SDVOSB FY21, Q1 FY21, Q4
BOS
EL SALVADOR CSL COMALAPA AIR
BOS CONTRACT
San Salvador, El
Salvador $13M/5 yrs. LB FY21, Q3 FY22, Q2
MNT
NCBC GULFPORT MULTIFUNCTION
SERVICES
Gulfport, MS $18M/5 yrs. SDVOSB FY21, Q2 FY22, Q1
TOTAL ~$319M
FSC Discussion Topics
Service Orders
Limits of Liability
Systems
Integrated Maintenance Program
Other Considerations
Service Orders
Using current OSD Guidance to standardize
Categories: Emergency, Urgent and Routine
Completion times: Urgent 5 days; Routine 30 days
Any variations will be specifically identified
“Fence line-to-Fence line”
“The Contractor shall perform service orders to accomplish any work identified within the entire boundary of the installation and will include a wide variety of work.”
Intent is to provide an effective way to execute reactive work
Within scope of contract
Within limits of liability of service orders
Within service order quantities available
“New Work” pushback
Service Orders are not tied to an inventory, facility list, etc.
Service Orders
Service Order Limits of Liability
Example: $5,000 in combined direct labor hours and direct material cost
Direct material value is to “bound” KTR risk for material
Order/Payment Change. Service Orders will be:
Unit priced as “Each” in the pricing schedule/ELINs
A specific Quantity will be provided in the ELINs for pricing/bid
Monthly invoicing/payment will be for the specific Quantity completed not 1/12 (for monthly)
A MOD at the end of each performance period will recoup obligated funds for any unused service orders (not ordered or not completed)
Service Orders and Unscheduled Services
Service Order Limits of Liability in direct labor and direct material cost:
Custodial: $500 in combined direct labor hours and direct material cost for all Custodial service orders
Pest: $1,500 in combined direct labor hours and direct material cost for all pest control service orders
Grounds Maintenance and Landscaping: $2,500 in combined direct labor hours and direct material cost for all Grounds Maintenance service orders
Example: If a grounds maintenance service order requires $2,600 in direct labor and direct material cost, the Government may issue a task order in accordance with the
Non-Recurring Work provisions of the contract for the $100 in direct labor and direct material cost that exceeds the grounds maintenance service order limit of liability.
Service Orders are part of the recurring work.
Completion times:
As noted in the Performance Standard in Section C of each sub-specification.
Service Orders – (cont’d)
Intent is to provide an effective way to execute reactive and unscheduled work
Within scope of contract
Within limits of liability of service orders
Within service order quantities available
Service Order Payment. Service Orders will be:
Unit priced as “Each” in the pricing schedule/ELINs
A specific Quantity will be provided in the ELINs for pricing/bid
The Contractor may invoice for completed service orders. The Contractor shall not invoice for incomplete service orders and service orders not issued.
Service orders are invoiced on the month completed (not the month issued).
A modification will be processed at the end of each period of performance and after the final invoice is paid for the period of performance to deduct for service orders not completed. Deduction will be based on the unit prices specified in Attachment J-0200000-
13_ELINs.
Should work exceed the recurring work limits:
The Contractor shall notify the Government IAW Section C, Annex 2, Spec Item 2.13.1
An estimate including the full scope of Work and clearly showing the deductions for the applicable recurring work limit of liability shall be provided. The resultant proposed price shall be for the portion of the work exceeding the recurring work limit of liability.
Limits of Liability
Interpretation and Application of Limits of Liability, example:
Annex 0200000 Spec Item 2.14.1 Notification to the
Government for Work Above the Recurring Work Limitations
“The Contractor is fully responsible for work up to the recurring work limits of liability. Recurring work limits of liability are specified in subsequent annexes or sub-annexes… The Contractor shall provide a detailed scope of work and detailed estimate, within two work days of the notification to the KO, per the non-recurring work procedures in Spec Item 2.15 for any potential task orders resulting from work that exceeded a recurring work limit of liability in the contract. The estimate shall include the full scope of Work and clearly show the deductions for the applicable recurring work limit of liability. The resultant proposed price shall be for the portion of the work exceeding the recurring work limit of liability. Further, the Contractor shall prepare and provide scopes of work and estimates in this manner to the KO when requesting a determination that a recurring work limit of liability has or will be exceeded.”
Limits of Liability – (cont’d)
Annex 1502000 Spec Item 3.1 Service Orders
…” Recurring Work up to the service order limit of liability of $5,000 in combined direct labor hours and direct material cost per service order…”
Ask questions prior to award
Limits of liability will be applied/enforced post award
Systems
FSC/BOS specifications require maintenance of “Systems” for many spec items. Inventories do not list every “piece/part” of the system.
The specs include system descriptions as a basis of estimate.
Example: ATTACHMENT J-1502000-XX “HVAC and Refrigeration Systems commence at and include the utility isolation point of connection and terminate at the conditioned air point of delivery. The Contractor shall develop and implement an IMP for the
HVAC and Refrigeration Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the HVAC and Refrigeration Systems such as: air handling units, blowers, boilers, chillers, compressors (including air compressors), condensers, controls , cooling towers, dehumidifiers, diffusers, driers, ducts, electrical disconnects, evaporators, fans, fan coil units, filters, fire dampers, fresh air dampers, heaters, heat exchangers, heat pumps, hoods, humidification systems, insulation, intakes, package units, piping, pumps, refrigeration boxes, registers, returns, strainers, ultraviolet lighting, valves, VAV boxes, variable frequency drives, water treatment systems, monitoring, control, and instrumentation systems, etc.”
Using the HVAC example above, the Contractor shall be responsible for an IMP of the “HVAC System” to include ancillary parts, equipment, and components that may or may not be specifically listed in the J attachment.
Systems
Other statements you may see in a spec for “systems”
Systems commence at the utility isolation point of connection and terminate at the point of delivery.
The intent with regard to Systems
Straightforward – “maintain the system”
Consider other relevant information – facility size, industry knowledge, location, etc.
Ask questions pre-award
Expect to be responsible for “Systems” requirements post award
IMP
Definition
Integrated Maintenance Program (IMP) is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the
Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state. of readiness. Service orders will not be issued for accomplishment of repairs on systems and equipment maintained under
IMP.
Plain Talk
A “breakdown” maintenance approach is unacceptable
Don’t waste your page count on theory – be clear about
What you plan to do;
How it’s worked;
Adequate resources to get what you propose done.
IMP
Plain Talk (cont’d)
Your approach can be high or low tech but should include:
A solid PM Program and monitoring approach
Timely reactive repairs – response similar to service orders
Minimize downtime and outages
Think “Systems”
Other Considerations
First and Foremost – “Be prepared to perform the work for the price you bid” Limits of Liability will be applied as specified
Prices proposed will be used – don’t expect to re-negotiate post award
Betterments offered in the non-price proposal become part of the contract
Price what you propose All the “bells and whistles” in your technical proposal
Labor quantities and skill levels/qualifications
Management and oversight to ensure quality and safety
Carefully consider non-recurring Unit Priced Labor (UPL), direct labor and direct material cost definitions Understand what’s included – “fully burdened”
UPL applies to “work” - whether performed by prime, sub, or vendor
Questions??
Contractor Courtesy Information for Projects onboard NSGB
Personnel:
3,000 Active Duty
500 DoD Civilians
500 Family Members
2,000 Contractors
500 TCNS that work for the U.S. Government
Total: 6,500 estimated
Land: 45 Square Miles
Facility Structures: 1,642
Infrastructure is old
Airfields: 2 (1 active, 1 inactive)
Piers: 4
Real Property Assets: 4706 (2150 Buildings, 1623 Structures, and
933 Linear Structures)
NSGB Demographics
33 5/16/2013
Mobilization Logistics
•Entry Clearance Forms & Identification
• Submitted 30 days prior to entry, contact Tommy Ivey 757-458-5621
• Passports required as means of identification
• All flights to Guantanamo Bay arrive on the Leeward Side of the island at the air terminal. Upon arrival, you will clear security, and exit the terminal and take one of the buses for transportation to the ferry.
•Berthing
• Management/Supervisory Housing will be rented at a fair market rate
• Initial crew berthing can be setup with the CBQ, contact 757-458-2091.
• Unaccompanied housing will be fully used until capacity is reached, it can be expected that the contractor will need to construct a man-camp to berth additional employees.
• The contractor will be provided an area for camp setup and will pay prevailing rates for electric, water, sewer, and trash services. For planning purposes, please contact the Asset Management Branch at 757-458-5652.
•Work Force
• No available labor pool in NSGB.
• Foreign Nationals may be used, however FNs from dissident areas may be excluded and denied entry.
• No mandated wage rates.
Mobilization Logistics
•Transportation of Personnel
• Air Mobility Command (AMC) flights to and from Jacksonville, FL; Norfolk, VA; and Kingston, Jamaica. AMC terminal NSGB contact 757-458-4850.
•Transportation of Materials and Equipment
• Vessels provided under contract to the Government depart every 14 days from Jacksonville, FL to NSGB and space is available to 3rd parties. Contact current contractor, Schuyler Line Navigation Company LLC, 410-216-9281.
• Government materials take priority over contractor shipments.
• Contractor under no obligation to use government contracted vessels.
• Lay down area will be provided to contractor.
• Compressed gas cylinders must be procured and shipped by contractor.
•On-Base Transportation
• Contractor shall provide necessary personnel, vehicles, and equipment required and shall bear all costs associated.
• Base bus system available 7 days a week.
• Ferry service scheduled runs from Leeward to Windward 7 days a week.
5/16/2013
Base Services
•Utilities
• Contractor will be charged prevailing rates for electric, water, and sewer.
• FY20 rates are:
• Elect: $365.62 / MwH
• Water: $22.04 / Kgal
• Sewer: $3.57 / Kgal
*Updated Rates incorporated via Amendment 0003
• Water and power meters will be furnished and installed at the expense of the contractor.
• Backflow preventers are required at all temporary water connections.
•Medical and Dental
• Medical and dental services available to the contractor’s employees are limited.
• Hospital and Dental Clinic are primarily staffed to treat DOD personnel.
• Government ambulance and medical care when required will be billed at prevailing rates. For more information 757-458-2998 or:
• Dental Care: 011-5399-2239
• Medical Outpatient Care: 011-5399-2230
• Medical In-patient care rates: 011-5399-2185
•Food Services
• Contractor personnel may eat at the Navy Exchange food outlets, or at other open food service facilities on a cash basis at current prices.
• Contractor personnel may also eat at Gold Hill, Leeward, and Seaside galleys.
•Refuse Collection
• Refuse containers at living quarters will be furnished and serviced by the Government. Collection is mandatory.
• Cost to the contractor is based on volume of dumpster.
• Services does not include articles left outside of containers or refuse from construction/demolition sites.
•Exchange, Commissary, and Recreation Facilities
• Exchange and Commissary is open 7 days a week and available to all contractors and their dependents in accordance with base regulations.
• MWR recreation facilities are available for use in accordance with base regulations.
• Internet, Cable, and Phone Services
• The Contractor shall have e-mail internet service for their office on base.
• Internet is available through ViaSAT (855-393-3302) or Phoenix Cable (757-458-2510).
• Cable TV service is available through Phoenix Cable.
• Base telephone service for job sites, offices, and management quarters may be arranged for at Base Communications Business Office (757-458-2500).
• Phone Services for living quarters, personnel and long distance are available through ViaSAT. Cellular service is through T-Mobile.
•Laundry and Dry Cleaning
• The government will make available laundry and dry cleaning facilities for contractor personnel and dependents at prevailing rates.
•Petroleum Products
• Sales of petroleum products shall be made from NAVSTA Supply Department under special deposit procedures based on the prevailing rate.
• Gasoline (MOGAS), aviation gasoline (AVGAS), JP-5, and Diesel Fuel are available.
• Bulk Fuels are available for tanker delivery to your equipment or day tanks.
• Regular filling at station pumps may be utilized by paying prevailing rate.
• All incoming and outgoing mail is handled by air. Expect receipt of inbound mail in about 7-14 days and delivery of outbound mail in about 7-14 days.
• For newly arriving contractors, the PWD staff will help obtain a dedicated post office box at the Base post office. An employee’s address will look like this:
John Doe
PSC 1005, BOX (assigned box number)
(name of contracting company)
FPO AE 09593 (+4 DIGITS ARE REQUIRED)
• A copy of your contract is required to set up a mailbox.
•Banking
• Community Bank is located in the Navy Exchange atrium.
• There is also a Navy Federal Credit Union that’s a non-cash, Member Service Center facility.
• Personal checks may be cashed at the Navy Exchange in the NEX Mall.
• Advised that a petty cash account be opened with Community Bank, a copy of current contract will be required.
•Environmental, HAZMAT, and HAZWASTE
• For Base environmental regulations, please call 757-458-5627.
• For HAZMAT information, please call 757-458-5627.
• For HAZWASTE information, please call 757-458-4994.
Questions??
Base Operations Support (BOS) Services
Naval Station Guantanamo Bay, Cuba
Pre-Proposal Conference and
Site Visit Kickoff Briefing
Site Visit 08-09 January 2020
RFP N69450-20-R-0010
Agenda
Welcome
Overview of the Contract
PWS General Information
BOS Services PWS Structure
Non-Recurring Work Information
Other Considerations
Solicitation Overview
BOS Services Proposal Requirements
Proposal Considerations
RFP/Site Visit Questions and Answers
Site Visit Schedule
Introduction
The purpose of this briefing is to provide instructions for the site visit and a general overview of the solicitation, including:
General Contract Requirements
Overview of the PWS and Technical Specifications
Evaluation Factors and Basis for Award
Proposal Requirements and Considerations
Site Visit Schedule
Nothing said today shall alter the requirements of the solicitation.
The terms and conditions remain unchanged unless the solicitation is amended in writing via amendment.
All attendees must sign in on the site visit log. The sign-in sheet and brief will be posted to Beta Sam via amendment after the site visit.
No questions will be answered at the sites.
Overview of the Contract
General Description:
This solicitation is for Base Operations Support (BOS) Services at
Naval Station Guantanamo Bay (NSGB), Cuba.
This requirement includes all labor, operations, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to perform the following: Family Housing, Facility
Management, Facility Investment, Custodial, Pest Control, Integrated
Solid Waste Management (ISWM), Other (Swimming Pools), Grounds
Maintenance and Landscaping, Utilities Management, Electrical, Wastewater, Water, and Base Support Vehicles and Equipment
(BSVE).
The outcomes for this acquisition are consistent with the Federal
Acquisition Regulation (FAR) 37.101 definition of service contracts.
The Section C Performance Work Statement (PWS) is provided as an attachment to the RFP
Supports PBSC (Performance Based Service Contracting)
Uses Navy-wide templates
Standard structure
Tabular format
2 standard/general and 4 functional/technical annexes
Annex 1 – Contains information relevant to the entire scope of the contract.
Annex 2 – Management and administration requirements relevant to the entire scope of the contract (including mobilization/demobilization).
Annexes 3 through 17 contain the technical information and requirements peculiar to that technical annex. Each of these annexes can contain 1 or more sub-annexes.
PWS General Information
Spec
Item Standard Use
General Information
Information unique to the understanding of the technical requirements of this specification
Management & Administration
Management and administrative requirements unique to the planning, execution, management and administration of the performance requirements of this specification. This cost is spread to Spec Item 3 for recurring or Spec Item 4 for 100% non-recurring work.
Recurring Work
All Recurring Work technical requirements of this specification.
Non-recurring Work
A pre-priced list of unplanned and unscheduled Unit Priced Task (UPT)
Work (non-negotiated) and Unit Priced Labor (UPL) Work (negotiated).
SECTION C: Annex Content – Technical Annexes 3 - 18
SECTION F: Summarization of reports
Contains a summary list and examples of data deliverables and reports
SECTION J: Documents, Exhibits, and Other Attachments
Recurring Work ELINs
Non-recurring Work ELINs
Client ordering of pre-priced line items via task order or FedMall
Other Attachments
Definitions and Acronyms
Directives, Instructions, and References
Common Output Level (COL) Standards (where applicable)
Inventories and Maps
Descriptions, Locations, and Frequencies for Scheduled Work
Standard numbering convention
Numbering example: “J-1500000-07”
BOS Services
PWS Structure
Annex 1 (0100000) – General Information
Annex 2 (0200000) – Management and Administration
Annex 14 (1400000) – Housing
• 1401000 – Family Housing
Annex 15 (1500000) – Facilities Support
• 1501000 – Facility Management
• 1502000 – Facility Investment
• *1502000 – (DHA) Facility Investment
• *1502000 – (JTF) Facility Investment
• 1503010 – Custodial
• 1503020 – Pest Control
• 1503030 – ISWM
• 1503040 – Other (Swimming Pools)
• 1503050 – Grounds Maintenance and Landscaping
Annex 16 (1600000) – Utilities
• 1601000 – Utilities Management
• 1602000 – Electrical
• 1604000 – Wastewater
• 1606000 – Water
Annex 17 (1700000) - BSVE
Non-Recurring Work Orders
Non-Recurring Work Orders
Intent is to provide an effective way to execute reactive and unscheduled work
Within scope of contract
Two “types”
Type One: Negotiated:
Unit Priced Labor (UPL), ELIN A700, and Material and Equipment, ELIN A702
Most commonly used when work under a service order exceeds liability limits
Ordered as authorized by the KO via task order
Units of measure are LH and DO
Type Two: Pre-Priced
Individual priced, distinct, and severable tasks, i.e ELINs A703, A705, A706... These are non-negotiable after award
Ordered through FedMall
Units of measure are CY, SF, LF, EA, CF, and DA
Contractor reports these task orders (ordered non-recurring service) to the KO monthly
Each ELIN defines the estimated quantities; however, the not to exceed limit is the non-recurring total
Non-Recurring Work & Other Considerations
Non-Recurring Work Continued
Invoicing and Receiving Payment:
Payment of individual negotiated and pre-priced task orders through WAWF
Payment of pre-priced orders through FedMall
Other Considerations The requirements of this contract vary from other solicitations.
Do not copy and paste your proposal.
Review the FSC Discussion Topics Brief. Additional examples, definitions, etc. are provided in the specification
Solicitation Overview
Solicitation, Attachments, and Amendments:
Posted on the Beta Sam website at:
https://beta.sam.gov/
Two amendments have been issued to date
It is the offeror’s responsibility to obtain the RFP files, along with any amendments, from Beta Sam
If possible, vendors are encouraged to follow the solicitation to receive automatic updates regarding the solicitation
Solicitation Overview
Contract Type: Facilities Support Indefinite-Quantity
Combination of recurring work (firm-fixed price (FFP)) and non-recurring work
(indefinite delivery indefinite quantity (IDIQ))
Each period of performance has two Contract Line Item Numbers (CLINs), one for recurring work and one for non-recurring work
Contract Term:
One year base period and four one-year option periods, total of 5 years
FAR 52.217-8, Option to Extend Services, provides the authority to extend contract performance up to 6 months (if necessary)
Basis for Award:
Best Value Tradeoff
The technical factors (Factors 1, 2, 3, and 4) are of equal importance to each other and, when combined, are equal in importance to the past performance factor (Factor 5). When the proposal is evaluated as a whole, the technical factors and past performance factor combined are significantly more important than price.
BOS Services
Proposal Requirements
Volume I – Responsibility Determination Binder
Volume II – Price Proposal
Section B
Section J Exhibit Line Item Numbers (ELINS) Attachment
Price Narrative
Volume III – Non-Price/Technical Proposal
Factor 1 – Corporate Experience
Factor 2 – Management
Factor 3 – Technical Approach
Factor 4 – Safety
Factor 5 – Past Performance
Proposal Considerations
Review the instructions and submittal requirements in Sections L and M of the
RFP and ensure you have addressed all requirements
Verify accuracy of SAM registration
Create a checklist to ensure you have addressed all requirements.
Sign and return all solicitation amendments
Address every element within each factor
Make sure insurance information is up-to-date for the safety factor
Utilize the attachments provided in Section J to submit Corporate Experience, Safety, and ELIN pricing data in the format provided
Ensure data is consistent throughout the proposal (price and technical)
Number proposal pages consecutively and stay within the page limitations provided. Pages exceeding the page limitation will not be evaluated.
Clearly label and separate/tab each factor in your proposal
Do not copy and paste from a prior proposal
Ask questions if you are uncertain about something
RFP/Site Visit Questions and Answers
All questions/pre-award inquiries must be submitted in writing
This ensures all potential offerors receive information at the same time.
Follow the instructions in the RFP for submission of pre-award inquiries via the Government Pre-award Inquiry Form (GPIF).
Deadline for questions/pre-award Inquiries is:
2:00 PM EST, Wednesday, 15 January 2020.
Government responses will be posted via amendment. Site visit questions resulting in a change to the solicitation will be addressed in an amendment.
Section L.4 of the RFP - Submit all questions in writing to jennifer.doherty@navy.mil and courtney.j.peterson@navy.mil .
The list of site visit attendees will be posted via amendment.
** Do not attempt to contact the Government site visit points of contact for additional information **
REMINDER
****NO PHOTOGRAPHS ALLOWED without
Escorts Approval!****
NSGB BOS Services
Site Visit Schedule – Day 1
Wednesday, 8 January 2020
Note: Time is stated in Eastern Standard Time (EST)
0845 Pick Up from the Downtown Lyceum
0900 Kickoff Meeting – M207 PWD Building - Welcome PWD and ACQ
0930 Marine Hill Pool
0945 Drive by Barge Dropoff/Cold Storage
1000 Stop at the Vehicle Maintenance Bldg - N36
1015 Stop at the Power Plant/Desal Plant - (Break)
1100 Drive around Camp Justice (sewer pump out/generators)
1110 Taurman Sub-Station
1120 Drive past UBOS yard (AV 78) and thru Cable Beach/Magazines
1130 Loop thru the Recycling Center and C Pool
1140 Loop around the NEX
1150 Stop at Lizard Island WWTP and Gold Hill Lift Station
Drive by Gold Hill Barracks and Stop at Gold Hill Galley –
LUNCH ($5.60 cash)
1315 Skyline Dr - Stop at Water Plant 3
1345 Stop at Housing Self Help/Villimar WWTP behind Self Help
1405 Drive thru Scrap Metal Yard, Dump/Landfill/Burn Boxes/Sludge Pits
1420 Drive to NE Gate/MOP 21 (BREAK)
1510 Stop at a sample of Fair Market Rental Housing
1530 Drive around the BOS Lay Down Area - Northeast Yard 1
1540 Stop at the Hospital - (BREAK)
1605 Drive around Marine Hill
1635 Drive past the Admiral's House at Marine Site - M101
1645 Return to drop off at Downtown Lyceum
End of Day 1
Note: Lunch at the Galley is payable in cash only.
NSGB BOS Services
Site Visit Schedule – Day 2
Thursday, 09 January 2020
0900 Depart Downtown Lyceum
0930 Ferry ride to Leeward
0930 – 1000 BREAK
1010 Stop by the Generators
1020 Drive around for Runway Lighting/Navigation Aids/BEQ/WWTP
1040 Stop at Recreation Hill
1100 Stop at Leeward Galley –LUNCH ($5.60 cash)
1145 Back to Ferry Landing
1200 Ferry back to Windward
1200 - 1230 BREAK
1245 Drive to JTF Area
1300 Stop at the Muse Unit/WWTP/Generators/D4 Lift Station
1315 Drive around JTF Areas
1325 Drive down thru Windmill Beach
1345 Drive by the Windjammer Pool/PV Array
Drive by the Central Ave Substation/Electric Lay Down Yard
(Bldg 972)/Turbines/JPJ Hill
1410 JPJ Hill (BREAK)
1430 Stop at the High School – Old HVAC/Chiller System
1445 Tour Proposed Man Camp Areas
1500 -1700 Debrief – M207 PWD Building
End of Site Visit
Note: Time is stated in Eastern Standard Time (EST)
Note: Lunch at the Galley is payable in cash only
Water Program Lessons Learned
*The following was briefed on site at GTMO
Water Program – Requirements stated within the contract are to be performed.
1. Staffing – Difficulty in getting trained personnel and for both Water Plant, Distribution system and water line breaks.
2. Utilities Management Requirements Drawings and dig permits
3. Logistical issues with Materials – adequate materials for all utility breaks, leaks, Chemical treatment of drinking water.
4. Materials issues with storage. The climate outside is not conducive to store certain materials in.
5. Materials – chemicals area NSF and properly stored
6. Equipment – adequate equipment on leeward and windward
7. Transportation Requirements on Island - Ability to get material to Leeward/Windward as needed (if there is no ferry or if ferry is full)
Water Program Lessons Learned: Continued
8. Ability to get material on island immediately when critical equipment breaks
9. Training on all utility systems – RO, WP3, Distribution. Systems are getting more automated.
10. Learn to isolate areas and keep water to most of base during breaks
11. Follow AWWA standards when making repairs, ensuring disinfection procedures.
12. Section C requirements for IMP, PM and notifications to the government.
13. Section F deliverable requirements – SOPs, Update SOPs as needed to document changes,
14. Sanitary Survey is conducted every 3 years. All corrective actions must be completed.
15. Water laboratory must meet all requirements outlined in CNIC M-5090.1, 29 Jun
2018.
16. Do not assume any certifications or qualifications of personnel, facilities or equipment.