N6945018R1800_SiteVisitBrief.pdf
PDF 357 KB Posted
- Attached to
- Base Operations Support (BOS) I Services at NS Mayport, MCSF Blount Island, and Outlying Areas
- Solicitation number
- N6945018R1800
About this file
This document provides details for a federal solicitation seeking Base Operations Support services. The solicitation will be issued by the Naval Facilities Engineering Command Southeast and seeks services including facility investment, custodial, pest control, integrated solid waste management, grounds maintenance, utilities management, and environmental services at Naval Station Mayport, Blount Island Command, and their outlying areas. The requirement is performance-based and will be fulfilled through an indefinite-delivery indefinite-quantity facilities support contract with recurring and non-recurring work priced using firm-fixed-price and indefinite quantity contract line items. The contract term is anticipated as one base year plus seven one-year options for a total of eight years. The solicitation number will be N69450-18-R-1800 and is planned for release on or after October 30, 2017, with proposals due December 7, 2017. The primary NAICS code is 561210 and the annual small business size standard is $38.5 million.
N6945018R1800_SiteVisitBrief.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J-0200000-13ELINs_0005.xlsx | XLSX spreadsheet | |
| N6945018R1800-0005.pdf | ||
| N6945018R1800-0004_Attachments.zip | ZIP file | |
| N6945018R1800-0004.pdf | ||
| N6945018R1800_GPIs_0003.pdf | ||
| N6945018R1800-0003.pdf | ||
| N6945018R1800-0002.pdf | ||
| N6945018R1800_SiteVisitAttendees.pdf | ||
| N6945018R1800-0001.pdf | ||
| N6945018R1800.pdf | ||
| MBOSI_Attachments2of3.zip | ZIP file | |
| MBOSI_Attachments1of3.zip | ZIP file |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mayport Base Operations Support I Services
(MBOS I)
Pre-Proposal Conference and
Site Visit Kickoff Briefing
RFP N69450-18-R-1800
30 November 2017
Agenda
Welcome and Introductions
Overview of the Contract
Technical Attachments General Information
MBOS I Services PWS Structure
FSC Discussion Topics
MBOS I Services Proposal Requirements
Solicitation Documents
Lessons Learned
Submission of RFP/Site Visit Questions and
Answers
Site Visit Schedule
Overview of the Contract
General Description:
The outcomes to be achieved are Base Operations Support (BOS) I services at Naval Station (NAVSTA) Mayport Jacksonville, Florida;
Marine Corps Support Facility – Blount Island (MCSF-BI) Jacksonville, Florida; and the outlying areas supported by these commands. This requirement includes all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to perform: Port Operations, Facility
Investment, Custodial, Pest Control, Integrated Solid Waste
Management, Other (Swimming Pools), Grounds Maintenance and
Landscaping, Utilities Management, Electrical, Wastewater, Steam, Water, Base Support Vehicles and Equipment (BSVE), Environmental, and other related services. The outcomes for this acquisition are consistent with the Federal Acquisition Regulation
(FAR) 37.101 definition of service contracts.
The Section C Performance Work Statement (PWS) is provided as an attachment to the RFP
Supports PBSC (Performance Based Service Contracting)
Uses Navy-wide templates
Standard structure
Tabular format
1 standard functional annex
Annex 1 – Contains information relevant to the entire scope of the contract.
Annex 2 – Management and administration requirements relevant to the entire scope of the contract (including mobilization/demobilization).
Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Each of these annexes can contain 1 or more sub-annexes.
Section C PWS General Information
Section C PWS General Information
Spec
Item Standard Use Priced
General Information
Non-cost information unique to the understanding of the technical requirements of this specification No
Management & Administration
Management and administrative requirements unique to the planning, execution, management and administration of the performance requirements of this specification. This cost is spread to Spec Item 3 for
Recurring Work or Spec Item 4 for 100% Non-Recurring Work.
Yes
Recurring Work
All Recurring Work technical requirements of this specification. Yes
Non-recurring Work
A pre-priced list of unplanned and unscheduled Unit Priced Task (UPT)
Work (non-negotiated) and Unit Priced Labor (UPL) Work (negotiated).
Yes
SECTION C: Annex Content – Technical Annexes 3 - 18
General Information
SECTION F: Deliverables
Contains a list of data deliverables and reports
SECTION J: Documents, Exhibits, and Other Attachments
Recurring Work ELINs
Non-recurring Work ELINs
Client ordering of pre-priced line items via task order
Other attachments
Definitions and Acronyms
Wage Determinations
Directives, Instructions, and References
Common Output Level (COL) Standards (where applicable)
Inventories and Maps
Descriptions, Locations, and Frequencies for Scheduled Work
Standard numbering convention
Numbering example: “J-0200000-13”
MBOS I Services – PWS Structure
Annex 1 (0100000) – General Information
Annex 2 (0200000) – Management and Administration
Annex 6 (0600000) – Port Operations
Annex 15 (1500000) – Facilities Support
• 1502000 – Facility Investment
• 1502000 – Facility Investment – MCSF-BI
• 1503010 – Custodial – MCSF-BI
• 1503020 – Pest Control – MCSF-BI
• 1503030 – Integrated Solid Waste Management – MCSF-BI
• 1503040 – Other (Swimming Pools)
• 1503050 – Grounds Maintenance and Landscaping – MCSF-BI
Annex 16 (1600000) – Utilities
• 1601000 – Utilities Management
• 1602000 – Electrical
• 1604000 – Wastewater
• 1605000 – Steam
• 1606000 – Water
Annex 17 (1700000) – Base Support Vehicles and Equipment
Annex 18 (1800000) – Environmental
Annex 18 (1800000) – Environmental – MCSF-BI
FSC Discussion Topics
Service Orders
Limits of Liability
Systems
Integrated Maintenance Program
Other Considerations
Service Orders
Using current Office of the Secretary of Defense (OSD) Guidance to standardize
32 hours (direct labor hours)
Categories:
Emergency
Urgent
Routine
Completion times:
Emergency: Responded to within one hour of receipt of call.
Work continues without interruption until emergent condition is arrested and damage to facilities, systems, ground structures, other assets and personnel is mitigated.
If follow-up work is required (after the emergency condition is arrested) to complete the restoration and ensure facilities, systems, ground structures and other assets are fully functional and in normal working condition, the Contractor may request time extension equal to a Routine Service Order.
Urgent: Within 5 working days
Routine: Within 30 calendar days
Any variations will be specifically identified
Fence line-to-Fence line, up to and including the fence and outlying areas:
“The Contractor shall perform service order work in a timely manner to accomplish any work identified within the entire boundary of the installation to ensure facilities, systems, ground structures and other assets are fully functional, in normal working condition and function properly in accordance with specified standards.”
“Service orders will include a wide variety of work.”
Service Orders – (cont’d)
Intent is to provide an effective way to execute reactive and unscheduled work
Within scope of contract
Within limits of liability of service orders
Within service order quantities available
Pushback:
New Work
Not tied to or included in an inventory, facility list, etc.
Service Order Limits of Liability:
The Contractor has full responsibility for any work up to the service order limit of liability of 32 direct labor hours or $2,500 in direct material cost per service order.
Direct material value is to “bound” KTR risk for material
Service Order/Payment Change. Service Orders will be:
Unit priced as “Each” in the pricing schedule/ELINs
A specific Quantity will be provided in the ELINs for pricing/bid
The Contractor may invoice for completed service orders. The Contractor shall not invoice for incomplete service orders and service orders not issued.
A modification will be process at the end of each period of performance and after the final invoice is paid for the period of performance to deduct for service orders not issued and incomplete service orders. Deduction will be based on the unit prices specified in
Attachment J-0200000-13 ELINs.
Limits of Liability
Interpretation and Application of Limits of Liability, example:
Section C, Annex 0200000 Management and Administration, Spec Item 2.14.1 Notification to the Government for Work Above the Recurring Work Limitations:
“The Contractor is fully responsible for work up to the recurring work limits of liability.
Recurring work limits of liability are specified in subsequent annexes and sub-annexes.
When work is expected to exceed the recurring work limits of liability, the Contractor shall notify the KO and provide a rough order of magnitude (ROM) estimate for the work exceeding the Contractors recurring work limits of liability within two hours of identification. For the portion exceeding the Contractors recurring work limit of liability, the Government may issue a service order or non-recurring work task order in accordance with the non-recurring work portion of the contract detailed below or accomplish the work by means other than this contract.”
“The Contractor shall provide a detailed scope of work and detailed estimate, within two work days of the notification to the KO, per the non-recurring work procedures in Spec
Item 2.15 for any potential task orders resulting from work that exceeded a recurring work limit of liability in the contract. The estimate shall include the full scope of Work and clearly show the deductions for the applicable recurring work limit of liability. The resultant proposed price shall be for the portion of the work exceeding the recurring work limit of liability. Further, the Contractor shall prepare and provide scopes of work and estimates in this manner to the KO when requesting a determination that a recurring work limit of liability has or will be exceeded.”
Limits of Liability – (cont’d)
Informational Note: “The Government has found that providing ROMs, detailed scopes of work and detailed estimates within two working days per the non-recurring work procedures in Spec Item
2.15 has required a significant effort to successfully meet the requirements.”
Section C, Sub-annex 1502000 Facility Investment, Spec Item 3.1 Service Orders:
The Contractor has full responsibility for any work up to the service order limit of liability of
32 direct labor hours or $2,500 in direct material cost per service order.
The Government will only pay for the portion of direct labor and/or direct material that exceeds the service order limits of liability. Examples of work exceeding the Service Order limits of liability:
If a service order requires 33 direct labor hours and $2,500 in direct material cost, the
Government may issue a task order in accordance with the Non-recurring Work portion of the contract for the one direct labor hour that exceeds the Service Order limit of liability.
If a service order requires 32 direct labor hours and $2,600 in direct material cost, the
Government may issue a task order in accordance with the Non-recurring Work portion of the contract for the $100 in direct material cost that exceeds the Service Order limit of liability.
If a service order requires 33 direct labor hours and $2,600 in direct material cost, the
Government may issue a task order in accordance with the Non-recurring Work portion of the contract for the one direct labor hour and $100 in direct material cost that exceeds the Service Order limit of liability.
Other examples (i.e., PM and IMP) are include in the specs
Ask questions prior to award
Limits of Liability will be applied/enforced post award
Systems
Specifications require maintenance on “Systems” for many spec items. Systems Descriptions do not list every “piece/part” of the system. For Example:
Section J, Sub-annex 1502000 Facility Investment, Attachment J-1502000-19 HVAC and
Refrigeration Systems:
“HVAC and Refrigeration Systems commence at and include the utility isolation point of connection and terminate at the conditioned air point of delivery. The Contractor shall develop and implement an IMP for the HVAC and Refrigeration Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the HVAC and Refrigeration Systems such as: air handling units, blowers, boilers, chillers, compressors (including air compressors), condensers, controls, cooling towers, dehumidifiers, diffusers, driers, ducts, electrical disconnects, evaporators, fans, fan coil units, filters, fire dampers, fresh air dampers, heaters, heat exchangers, heat pumps, hoods, humidification systems, insulation, intakes, package units, piping, pumps, refrigeration boxes, registers, returns, strainers, ultraviolet lighting, valves, VAV boxes, variable frequency drives, water treatment systems, monitoring and control systems including the EMCS.
The Energy Management Control System (EMCS) is a centralized Building Automation
System that provides monitoring and control of HVAC systems (e.g., Chillers, Air
Handlers, Cooling Towers, Pumps, DX Split Systems, Outside Air Units, Variable Air
Volume Boxes, Fan Terminal Units, etc.) in multiple facilities. The EMCS includes all equipment and components of the EMCS (e.g., Hardware, Software, Controllers, Field
Devices, Graphics, monitoring and control system, etc.).
Systems – (cont’d)
The EMCS is designed on an open standard BACnet Protocol. The EMCS uses Tridium's
Niagara-AX Framework for the Direct Digital Controls (DDC) systems integration of the diverse systems that are utilized locally by different facilities. The EMCS Supervisor
Workstation, located at Building 1966, uses a web-based building management system interface, EC-Net A/X Graphics Package. In general, all DDC control devices within the facilities that are linked via the base wide EMCS, communicate to a building level JACE
(Java Application Control Engine) device, which in turn communicates to a centralized controller located in the Naval Station Mayport Public Works Building 1966 via fiber optic communication network and copper telephone network.”
Using this HVAC example, the Contractor shall be responsible for an IMP of the “HVAC
System” to include ancillary parts, equipment, and components that may or may not be specifically listed in the J attachment.
Other statements you may see in a spec for “systems”
Systems commence at the utility isolation point of connection and terminate at the point of delivery.
The intent with regard to Systems
Straightforward – “maintain the system”
Consider other relevant information – facility size, industry knowledge, location, etc.
Ask questions pre-award
Expect to be responsible for “Systems” requirements post award
Integrated Maintenance Program (IMP)
IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service
Orders will not be issued for accomplishment of repairs on systems and equipment maintained under IMP.
Plain Talk:
A “breakdown” maintenance approach is unacceptable
Don’t waste your page count on theory – be clear about
What you plan to do;
How it’s worked;
Adequate resources to get what you propose done.
Your approach can be high or low tech but should include:
A solid PM Program and monitoring approach
Timely reactive repairs – response similar to service orders
Minimize downtime and outages
Think “Systems”
Other Considerations
First and Foremost – “Be prepared to perform the work for the price you bid”
LOLs will be applied as specified
Prices proposed will be used – don’t expect to re-negotiate post award
Price what you propose
All the “bells and whistles” in your technical proposal
Labor quantities and skill levels/qualifications
Management and oversight to ensure quality and safety
Insert info from price evaluation factor
Carefully consider non-recurring Unit Priced Labor (UPL) and direct labor definitions
Understand what’s included – “fully burdened”
UPL applies to “work” - whether performed by prime, sub, or vendor
Additional examples, definitions, etc. are provided in the specification
MBOS I Services – Proposal Requirements
Volume I – Responsibility Determination Binder
Volume II – Price Proposal
Section B
Section J Exhibit Line Item Numbers (ELINS) Attachment
JB-2 Supplemental Pricing Attachment
Price Narrative
Factor 5 – Small Business Utilization
Volume III – Non-Price/Technical Proposal
Factor 1 – Corporate Experience
Factor 2 – Management
Factor 3 – Technical Approach
Factor 4 – Safety
Factor 6 – Past Performance
MBOS I Services – Proposal Requirements
Basis for Award:
Best Value Tradeoff
The relative order of importance of the non-cost/price evaluation factors is the technical Factors 1, 2, 3, 4 and 5 are of equal importance to each other and, when combined, are equal in importance to the past performance evaluation/performance confidence assessment Factor 6. When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-cost/price evaluation factors) are significantly more important than price.
Facilities Support Indefinite-Quantity Contract
Combination of recurring work and non-recurring work
Recurring Work/Firm-Fixed Price (FFP) and Non-Recurring Work/Indefinite Delivery
Indefinite Quantity (IDIQ) CLINs
Period of Performance: Base period of one year and seven one-year option periods, not to exceed a total of 8 years.
FAR 52.217-8 Option (up to 6 months, if necessary)
Solicitation Documents
Solicitation, Attachments, and Amendments
Posted on the Navy Electronic Commerce Online and Federal Business Opportunities websites at:
https://www.neco.navy.mil/ https://www.fbo.gov/
Vendors are encouraged to register on both sites to receive automatic updates regarding the solicitation.
Lessons Learned (prior to proposal submission)
Verify accuracy of SAM and VETS-4212 registrations
Sign and return all solicitation amendments
Ask questions if you are uncertain about something
Create a checklist to ensure you have addressed all requirements
Utilize the MS EXCEL pricing attachments provided in Section J to submit data in the format provided
Ensure data is consistent throughout the proposal (price and technical)
Number proposal pages consecutively and stay within the page limitations provided. Pages exceeding the page limitation will not be evaluated.
Make sure insurance information is up-to-date for the safety factor
Do not copy and paste from a prior proposal
Clearly label and separate/tab each factor in your proposal
Address every element within each factor
Small Business Lessons Learned
Non-Price Factor 5, Small Business Utilization
Achievements
• Narrative describing SB achievements in supporting Govt’s SB policies
• Provide Small Business Subcontracting Record for each project cited under Factor
1, Corporate Experience
• Provide ISRs (or equivalent) for each project cited if subcontracting plan was required, and explanations for any instances of failures to meet goals
• Teaming/JV/Mentor-Proteges – Explain and demonstrate meaningful involvement in the management of the subcontracting program.
Small Business Participation and Commitment
• Submit Small Business Participation and Commitment Strategy attachment.
• Submit supplemental narrative to address specific elements of strategy, such as subcontract binding agreements, post award execution roles, specific initiatives employed to enhance SB participation and future involvement.
• Ensure first tier subcontract participation rate is 20% of the contract value; if not explain how participation rates were established
• Ensure SB Participation and Commitment Strategy and subcontracting plan (if required) are in agreement
RFP/Site Visit Questions and Answers
All Site Visit Questions must be submitted in writing
This ensures all potential offerors receive accurate information at the same time.
Follow the instructions in the RFP for submission of Pre-award
Inquiries and use the Government Pre-award Inquiry Form (GPIF).
Deadline for questions and Pre-award Inquiries is:
2:00 PM EST, Thursday, 7 December 2017.
Site visit questions and answers will be posted to NECO and FBO.
Site visit questions resulting in a change to the solicitation will be addressed in an amendment.
Submit all questions in writing to cari.fiebach@navy.mil (with a copy to rebecca.m.jones@navy.mil).
The list of site visit attendees will be posted on NECO/FBO.
** Do not attempt to contact the Government site visit points of contact for additional information **
MBOS I Services – Site Visit Schedule
TIME* ACTIVITY
07:00 Meet at Park and Ride at A1A and Wonderwood
07:15 Depart Park and Ride for Welcome/Introduction/Site Visit and Security Briefs, NS Mayport Bogey’s Restaurant
08:45 Depart Bogey’s for windshield tour of Navy Fuel Depot Heckscher Drive
09:30 Depart Navy Fuel Depot Heckscher Drive for Marine Corps Support Facility – Blount Island (MCSF-BI) with stops at MCSF-BI Blast, Paint and Curing Facility and MCSF-BI Wash Rack Facility
10:15 Depart MCSF-BI for windshield tour of Child Development Center and Navy Exchange
11:30 Return to Park and Ride at A1A and Wonderwood for lunch break
12:30 Depart Park and Ride for NS Mayport Bldg. 1488 Southeast Regional Maintenance Center
13:15 Depart Bldg. 1488 for NS Mayport Bldg. 2104 Medical/Dental Clinic
13:45 Depart Bldg. 2104 for NS Mayport Bldg. 1391 Fitness Center
14:15 Depart Bldg. 1391 for NS Mayport Wastewater Treatment Plant
14:45 Depart Wastewater Treatment Plant for windshield tour of Wharves with stops at NS Mayport Bldg. 2307 Alpha Pier Electrical Distribution Facility
15:15 Depart Bldg. 2307 for NS Mayport Base Support Vehicles and Equipment Maintenance and Repair Facilities
15:30 Depart Base Support Vehicles and Equipment Maintenance and Repair Facilities en route to Park and Ride at A1A and Wonderwood and conclude Site Visit
*Eastern Standard Time (EST)
File details come from the government source that posted it. Updated .