This is a synopsis notice for a Base Operations Support I services contract opportunity at Naval Station Mayport, Blount Island Command, and outlying areas in Florida. The services include facility investment, custodial, pest control, integrated solid waste management, swimming pools, grounds maintenance, utilities management, electrical, wastewater, steam, water, base support vehicles and equipment, and environmental services. Custodial, pest control, solid waste management, and grounds maintenance will primarily be at Blount Island Command. The contract type is an indefinite-quantity facilities support contract to be competitively procured using FAR Part 15 procedures. The term is a one-year base period plus seven one-year options, not to exceed eight years total. The minimum guarantee is the base period recurring work requirement. The NAICS code is 561210 with an annual small business size standard of $38.5 million. The solicitation will be issued on or after October 30, 2017.

N6945018R1800_GPIs_0003.pdf

View the file

Other files

File Type Posted
J-0200000-13ELINs_0005.xlsx XLSX spreadsheet
N6945018R1800-0005.pdf PDF
N6945018R1800-0004_Attachments.zip ZIP file
N6945018R1800-0004.pdf PDF
N6945018R1800-0003.pdf PDF
N6945018R1800-0002.pdf PDF
N6945018R1800_SiteVisitBrief.pdf PDF
N6945018R1800_SiteVisitAttendees.pdf PDF
N6945018R1800-0001.pdf PDF
N6945018R1800.pdf PDF
MBOSI_Attachments2of3.zip ZIP file
MBOSI_Attachments1of3.zip ZIP file
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N69450-18-R-1800 Mayport BOS I Services

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

58 of 72 5252.215-9300 (b) (2) b

70 of 72 M.3.3 (5)

15 of 34 F 2.3.5

225 of

366 J-1503020-01 CWP, SDS

3 64 of 72 M

M.3 3. (b), fourth line in

RELEVANT

PROJECT

paragraph

RELEVANT PROJECTS [specifically, “or 2) shall be completed within the last five (5) years”]. Would the Navy please extend the Past Performance period for relevant projects from 5 years to a minimum of 7 years since most BOS contracts tend to be greater than 5 years in duration? In the past 10 years, the Navy and DoD has greatly reduced the amount of similar large, multi-year unrestricted BOS contracts. To cover all of the scope elements that this contract requires while demonstrating the ability to successfully complete a similar large contract of this magnitude, a greater past performance period allows industry to be competitive for this contract and the Navy to see successful delivery of a multi-year BOS contract. With the last RBOS solicitation canceled, the 5-year performance period favors the incumbent.

GOVERNMENT RESPONSE PENDING.

4 58, 70-71 L, M

L(a)(2)(c) -p.58

M.3(b)(5) -p.70-71

Under the Price Proposal Binder Instructions for the Price Proposal in Section L, offerors are requested to "Submit all Non-Price Factor 5 Small Business Utilization requirements and Small Business Subcontracting Plan (if applicable)." Section M lists Factor 5, Small Business Utilization as a Non-Cost/Price Factor to be submitted within the Non-Price Proposal. Is the Government's intent for all material included within Factor 5, Small Business Utilization to be duplicated in both the Price Volume and the Non- Price Proposal?

See Government response to GPI No. 1.

5 59 L (b)(3)e

Section L (b)(3)(3) states that "Colored font may be used for headers/footers, section headings, and subheadings" in the Non-Price Proposal. Is it acceptable for Offerors to also use colored font in headers/footers, sections headings, and subheadings of the Responsibility Determination and Price Proposals?

Colored font may be used for headers/footers, section headings, and subheadings in all proposal volumes.

6 67 M (3)(i)a When providing the completed Attachment JB-1 as part of Factor 3, will the Government allow this to be excluded from page count? No. The JB-1 is not excluded from the page count.

REFERENCE

The Non-Price Factor 5 Small Business Utilization submittal requirements shall be provided in the Price Proposal Binder only. The Non-Price Factor 5 submission and Small Business Subcontracting Plan (if applicable) shall not be included in the Non-Price Proposal Binder.

Amend No.

Yes, Planned Pesticide Use Sheets, including labels and Safety Data Sheets for each pesticide intended for use, shall be submitted with the Contractor’s Work Plan Post Award.

Can you confirm that the Contractors Work Plan, Planned Use Sheets, and Safety Data Sheets are to be submitted after award with the other pest control deliverables or as stated in the reference areas with the proposal

GPI

No. QUESTION GOVERNMENT RESPONSE

Can you confirm the placement of Factor 5 Small Business Utilization.

Does it belong under Price or Non Price Volume. These two references seem to contradict its placement.

Amendment 0003

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

7 70-71 M M.3(b)(5)

Offerors are required to provide copies of the most current ISRs associated with each project listed under the Corporate Experience Factor within the Non-Price Proposal volume. However, these ISRs are not excluded from page count for the Non-Price Proposal in Section L(a)(3)(h) on p.59. Will the Government exclude ISRs from the overall page count of the Non-Price Proposal?

All Non-Price Factor 5 Small Business Utilization submittal requirements (including ISRs) shall be provided in the Price Proposal Binder. With the exception of the price narrative and the Factor 5 Small Business Utilization narratives, there is no page limitation on the Price Proposal.

8 106-108 C / 1502000 3.1

Section C-1502000 provides historic service call data for Mayport. A detailed analysis identifies that only 21 of the 585 sample calls were HVAC calls. This number seems low for Mayport. Please confirm that less than 4% of service calls are for HVAC, or that all these calls were accounted for elsewhere.

Historically, HVAC and Refrigeration systems have been included in an Integrated Maintenance Program (IMP). The historical service call data includes service calls for HVAC and Refrigeration systems not included in an IMP.

9 47, 274 C / 0600000 and 1700000 3.1, 3.1.1

Section C-0600000 3.1 identifies a historical 1,025 ship movements per year to be accounted for in this area (J-0600000-03). Section C-1700000

3.1.1 identifies 1,720 WHE/MHE/CESE Services a year to be accounted for in this area. Please confirm that the 1,025 ship movements are not included in the 1,720 services.

The historical quantity of 1,025 ship movements per year identified in Section J, Annex 0600000 Port Operations Attachment J-0600000-03 Historical Data for Ships Movements are included in the historical 1,720 WHE/MHE/CESE Services annually identified in Section C, Annex 1700000 BSVE, Spec Item 3.1.1 WHE/MHE/CESE Services.

10 270-274 C / 1700000 3.1.1 Related information identifies an average 4 hrs for each service, is this time on station, or does it include wait and preperation time?

Historically, WHE/MHE/CESE Services average approximately four hours each. This is the number of direct labor hours required to complete the work and does not include travel time, time for job preparation, standby, and similar indirect labor elements.

11 51,52 C / 0600000 3.2.2

The performance Objective identifies that we are to "provide and operate " the conveyor. The related information indicates that we are to deliver and set-up the conveyor, and that it will be operated by ships forces. Will we be required to operate the conveyor, or will ships forces operate it?

The Contractor shall provide and operate one portable conveyor to support Port Operations.

Refer to: Section C, Annex 0600000 Port Operations, Spec Item 3.2.2 Ship to Shore Conveyor.

12 53 L L.12

Are all procurement contracts/purchases anticipated for material, tools, equipment, and services considered "subcontracts", regardless if procured from a large or small business, from Phase-In through completion of the contract period of performance, when establishing the total Subcontracting value?

Yes, regardless if procured froma a large or small buinsess (total subcontracting value), offerors will be evaluated on the levels of small business participation proposed and the degree of commitment to use named sources on first tier (direct awards) subcontracts for material, tools, equipment, and services for the total contract to include options. NOTE: If any of the subcontracts for material, tools, equipment, and services are included in the prime's indirect and overhead cost, a detailed explanantion must be given, per Small Business Subcontracing Plan, para 6.

13 67 M (3)(i)a When providing the completed Attachment JB1 as part of Factor 3, will the Government allow this to be excluded from page count? See Government response to GPI No. 6.

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

14 57 L 5252.215-

If offerors provide a table of content/table of figures with each volume to assist the government in evaluation, will they be excluded from page count?

A table of contents/table of figures is not required but may be submitted. They will not be excluded from the page count for the non-price proposal submittal; only blank tab dividers, Past Performance Questionnaires, and Contractor Performance Assessment Reports are excluded.

There is no page limitation on the responsibility determination submission. With the exception of the price narrative and Factor 5 Small Business Utilization narratives (as stated in the respective factors), there is no page limitation on the pricing proposal.

15 59 L 5252.215-

9300(b)(3)(a &d)

The Non-Price Proposal Binder instructions state that the offeror shall, "Identify the company names, CAGE Code, and DUNS for all team members and identify their role (prime, joint venture partner, significant subcontractor, subcontractor, etc.);" AND "State a clear acknowledgement within the beginning of the binder that nothing in the following proposal is meant to supersede or reduce any of the individual requirements to which the offer addresses."

Are these items to be included within the text of the Technical response or should they be included in the Binder cover letter?

It is at the offeror's discretion to submit this information within the text of the technical response or in a binder cover letter. However, note that the referenced acknowledgement must be within the beginning of the binder.

16 58 L 5252.215-

9300(b)(2)(d

The RFP states that submitted CD-ROM documents be provided in "readable/searchable electronic format". Is it required that text included in the image be searchable, or that only the information included in the graphic caption be searchable.

All text shall be submitted in readable/searchable electronic format.

17 58 L 5252.215-

9300(b)(1)(k

Can the Government confirm that screenshots/photographs are exempt from font requirements, as they are used to show the image and not intended to be read?

No. The requirement remains as stated in the RFP, "Text (including text in all graphics, exhibits and tables) will be black using a font no smaller than 11 point, Times New Roman or Courier."

18 58 L 5252.215-

9300(b)(1)(k

Can the Government confirm that all headers/footers are exempt from font requirements?

See Government response to GPI No. 17. The only exception to the font requirements for headers/footers is that colored font may be used.

19 58 L 5252.215-

9300(b)(1)(k

The RFP states, "Text will be black using a font no smaller than 11 point".

Can the Government confirm that font sizes for tables and graphics be reduced to 9 pt?

See Government response to GPI No. 17.

20 52 L L.8 The Government has not provided a Phase-In CLIN. Does this favor the incumbent?

No. Although there is no separately priced CLIN for Phase-In and Phase-Out, as stated in section L.8 PHASE-IN AND PHASE-OUT of the RFP, "Pricing shall include applicable Phase-In and Phase-Out costs".

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

21 58 & 62 L & M.3 5252.215- 9300(b)(2)(c

Section L states that that the contractor shall, "Submit all Non‐Price Factor 5 Small Business Utilization requirements and Small Business Subcontracting Plan (if applicable). Non‐Price Factor 5 and the Small Business Subcontracting Plan must have an individual tab divider ;"

Can the government confirm that offerors are required to submit identical Small Business Subcontracting Plans in both the Price Proposal Binder AND the Non-Price Binder?

No. See Government response to GPI No. 1.

The RFP states: “As stated in the solicitation, all technical factors when combined are of equal importance to the performance confidence assessment (past performance) rating; and all technical factors and the performance confidence assessment (past performance) rating, when combined are significantly more important than price.” The importance of other factors over price was also significantly stressed by the USG at the latest Industry Day/site visits.

The evaluation criteria in Section M is ambiguous regarding how the Government intends to determine differentiating evaluation factors amongst offerors within the Non-Price Proposal. The solicitation currently states, “all technical factors and the performance confidence assessment rating, when combined are significantly more important than price”.

Recommendation: Based on other NAVFAC solicitations, we recommend this solicitation be amended to include weighted evaluation criteria as detailed below:

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

• Factor 4 Safety—Those Offerors who demonstrate an effective safety management system, as indicated by the required information provided in their safety narrative may be considered more favorably in the evaluation.

o Offeror’s DART rates will be evaluated against the following Navy standards:

Risk DART Very High Greater than 2.0 High From 1.0 to 2.0 Moderate From 0.50 to 0.99 Low From 0.25 to 0.49 Very Low Less than 0.25

• Factor 5 Small Business Utilization—The extent to which the proposal provides Small Business Subcontracting goals that meet or exceed the minimum NAVFAC Small Business Subcontracting Targets. Proposals that provide goals exceeding the NAVFAC Subcontracting Targets may be rated higher.

• Adjectival Ratings/Descriptions—The following are the non-cost/price ratings to be used in the evaluation of the proposals for all factors except Factor A, Past Performance and Factor E, Small Business Utilization:

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

Outstanding: Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Multiple significant strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low. No deficiency or significant weakness exists.

Good: Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains multiple strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.

No deficiency exists.

Acceptable: Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.

Marginal: Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements.

The proposal has one or more weaknesses which are not offset by strengths.

Risk of unsuccessful performance is high.

Unacceptable Proposal does not meet requirements and contains one or more deficiencies. Proposal is unawardable.

The weighting of the evaluation factors is as stated in section M.1 and M.3 of the RFP, technical factors 1, 2, 3, 4 and 5 are of equal importance to each other and, when combined, are equal in importance to the past performance evaluation/performance confidence assessment Factor 6. When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined are significantly more important than price.

Additional evaluation criteria will not be incorporated via amendment. The Government has established objective rating definitions and methods; reference the DoD Source Selection Procedures for additional information. However, in accordance with FAR 15.304(d), "The rating method need not be disclosed in the solicitation".

62 M.1 Basis of Award (4)

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

• The following are the past performance relevancy ratings and confidence assessments to be used in the evaluations for Factor A, Past Performance:

o Past Performance Relevancy Ratings

Very Relevant: Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant: Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

• The following are the past performance relevancy ratings and confidence assessments to be used in the evaluations for Factor A, Past Performance:

o Past Performance Relevancy Ratings Very Relevant: Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant: Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

Performance Confidence Assessments Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence: Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Limited Confidence: Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence: Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort

23 66 M.3 (2) Factor 2, Management

Can the Government verify that Section J- Attachment JB1 FTE is excluded from the page count of the Non-Price Proposal? See Government response to GPI No. 6.

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

24 71 M.3

(2) Factor 5, Small

Business Utilization

The RFP states, "The anticipated prime and first tier overall small business participation rate for this acquisition (i.e. work to be performed by small businesses as the prime and/or subcontractors) is 20% of the contract value."

To ensure more robust competition, would the Government instead consider a small business requirement against subcontracted dollar value with goals as indicated in Section L.12 - Subcontracting Plan?

The Small Business Participation Plan and the Small Business Subcontracting Plan (if applicable) must be in agreement. The Small Business Participation Plan rate of 20% of the contract value is the amount of work to be performed by small businesses, whether the offeror is a small business prime (performing at least 20% of the work) or if the offeror is a large business prime subcontracting 20% to small businesses. The 20% is based on the total contract value.

For the Small Business Subcontracting Plan (required for large businesses only), the NAVFAC small business subcontracting goals are the target percentages of all subcontracted work to be performed by small businesses. Reference L.12 Subcontracting Plan on RFP Page 53 of 72 for complete list of small business subcontracting targets.

Note that the following contract values are provided as an example ONLY. An example of how the plans must be in agreement is as follows: (1) For the Small Business Participation Plan, 20% of a $100K total contract value would be $20K. In this example, it would be expected that $20K worth of work on the contract would be performed by small businesses;

(2) The Small Business Subcontracting plan should be in agreement and reflect $20K subcontracted to small businesses. Of the $100K sample contract value, if the total subcontracted work is 30% (or $30K), with 10% ($10K) subcontracted to large businesses and 20% ($20K) subcontracted to small businesses, this would be reflected in the Small Business Subcontracting Plan as 33.33% subcontracted to large businesses and 66.67% subcontracted to small businesses. The 66.67% is just over the NAVFAC subcontracting target of 65% for Small Businesses.

25 71 M.3

(6) Factor 6, Past Performance

Can the government confirm that all 'past performance recognition documents' are excluded from the page count of the Non-Price Proposal?

No. Performance recognition documents are included in the page count. Only blank tab dividers, Past Performance Questionnaires, and Contractor Performance Assessment Reports are excluded from the Non-Price Proposal page limitation.

26 N/A

N6945018R180 0_JB1FTE.xlsx

N6945018R180

0_JB2.xlsx

Cells A33:A37

The attached JB-1 and JB-2 Excel files have Sub-Annex values that do not match the PWS Section C for 1502000 Facility Investment, Other Recurring Services. Can the USG correct the Sub-Annex values in cell A33:A37 under Other Recurring Services Program to reflect 3.5.2, 3.5.3, 3.5.4, 3.5.5 and 3.5.6?

Refer to Amendment 0002. 0002

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

27 N/A N6945018R180 0_JB2.xlsx N/A

Can the USG clarify where they would like ODCs to be priced on the JB-2 Supplemental Pricing Sheet? Can offerors modify/add columns in order to align with specific estimating practices?

Offerors are responsible for allocating proposed pricing to the JB-2 Supplemental Pricing data elements in the format provided. As stated the RFP, offerors shall provide a price narrative explaining how all direct and indirect costs are allocated to the cost elements identified in the JB-2.

Pricing shall be provided for all JB-2 Supplemental Pricing data elements whether work is proposed to be performed by the offeror as the prime contractor, subcontracted, or accomplished by other means.

No, offerors shall not modify/add columns in order to align with their specific estimating practices.

Offerors shall utilize the MS EXCEL pricing attachments provided in Section J to submit the ELIN and JB-2 Supplemental Pricing data in the format provided. Formulas shall be traceable. Failure to do so may be cause to render the offer nonresponsive. Refer to:

5252.215-9300 CONTENT OF PROPOSALS (JAN 2003), (b) The offeror shall submit the following information, (2) Price Proposal Binder, e, RFP Page 58 of 72.

28 2 Section A -

Solicitation/Cont ract Form

A.5

In Section A.5, the Government has provided the incumbent's revenue for each year of contract performance since award of the current contract.

Since these values have no relationship to the new RFP for the Mayport and Jacksonville contracts, can the Government please provide the revenue earned by the incumbent contractor for only the Mayport portion on the current contract?

GOVERNMENT RESPONSE PENDING.

29 24 Section C, Annex 0200000 2.8.7

Spec Item 2.8.7 says the Contractor shall obtain all required corporate and personnel Security Clearances prior to commencement of work. However, there is no DD254 provided with the RFP. What are the Security Clearance requirements?

Contractor personnel must have a current favorably adjudicated National Agency Check with Law and Credit (NACLC) Tier 3 Investigation to verify their trustworthiness. Refer to:

Section C, Annex 0200000 Management and Administration, Spec Item 2.8.8 Access to Sensitive Unclassified Information.

30 24 Section C, Annex 0200000 2.8.7 Upon contract award, will the Government provide a list of all contractor personnel with required clearances?

No. In accordance with FAR 52.222-41(n) Seniority List, the incumbent shall furnish the Contracting Officer a certified list of the names and anniversary dates of employment of all service employees on the Contractor's or subcontractor's payroll during the last month of contract performance, which will be turned over to the successor Contractor at the commencement of the succeeding contract. However, security clearance data is not available to the Government.

See Government response to GPI No. 29 for Contractor personnel security requirements.

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

31 260 Section C- 1601000 3.3.1 J-1601000-07 does not provide the date of last inspection, testing and certification for the backflow preventers as stated in 3.3.1. Please provide.

Inspection, testing, and certification of Backflow Preventers is ongoing. Currently, all Backflow Preventer certifications are current.

32 273 Section C – 1700000

C.2.4 3.1.1

Government Furnished Property Annex 2 C.2.4 references section H.10, which does is not include as part of the solicitation package. However, section H.8 states that no Government Furnished Property is provided.

Annex 17000 identifies five mobile cranes. Are these cranes considered Government Owned Property, or is the offeror expected to procure this equipment.

Reference to Section H revised via Amendment 0002.

The mobile cranes identified in Annex 1700000 BSVE are Government Owned - Contractor Operated and are not provided to the Contractor as Government-Furnished Equipment.

33 63 & 106 Section C – 1502000 3.1

Please provide the current backlog of service orders for Mayport and Blount Island with details for the contractor to incorporate into their planning.

No further data will be provided. Service Order quantities are provided by paying activity in Section J, Annex 0200000 Management and Administration, Attachment J-0200000-13 ELINs.

34 64 & 106

Section C – 1502000

Section C – 1700000

3.1 3.3.5

Does the Government intend to prorate the annual workload quantity into monthly incriments to calculate the deductions? If so, will the Government increase the value for Service Orders that exceed the monthly amount?

No, the Government will not prorate the annual workload quantity into monthly increments to calculate the deductions. Deduction will be based on the unit prices specified in Attachment J-0200000-13 ELINs.

35 66 & 110 Section C – 1502000 3.2

Please provide the current backlog of preventive maintenance actions for Mayport and Blount Island with details for the contractor to incorporate into their planning.

This data is not available.

36 66 & 110 Section C – 1502000 3.2 Please provide the current preventive maintenance schedule for all systems/facilities/equipment, for both Mayport and Blount Island.

No further data will be provided. The Contractor shall develop and implement a PM program for facilities, systems, ground structures and other assets to ensure they are safe, fully functional, minimize breakdowns and to maximize useful life. Refer to: Section C, Sub-annex 1502000 Facility Investment, Spec Item 3.2 Preventive Maintenance (PM) Program.

70 & 114

Section C - 1502000

Section C - 1602000

Section C - 1604000

Section C - 1605000

Section C - 1606000

3.3 3.2

Is there a Government approved IMP that can be used as a masterplan for all utilities? If so, will the Government please provide to offerors?

No, there are not a Government approved IMPs that can be used as a masterplan for all utilities.

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

38 296 Section C- 1800000 3.1

Section 3.1 states that contractors shall contain, clean up and report spills in a manner that complies with the SPCC plan, Facility Response Plans (FRP), OPNAVINST 5090.1 series. Will the Government please provide these documents?

Naval Station Mayport Spill Prevention, Control, and Countermeasure Plan is provided as a separate attachment titled: GPI_38_NSMayport_SPCC_Plan.pdf.

DoD policy limits the dissemination of information. Facility Response Plans will be made available to the successful offeror with appropriate credentials post award.

OPNAV Instructions are available at: <https://doni.documentservices.dla.mil/opnav.aspx>.

39 36 Section C - 2000000 2.10.2.7

This section states the Contractor shall identify, clean-up and control contractor caused hazardous substance spills according to the regulations set forth by NAVSTA Mayport Hazardous Waste Management Plans, Spill Prevention, Control, and Countermeasure Plans, and Facility Response Plans and SOPA (ADMIN) MYPTINST 5090.4 series. Will the Government please provide these documents?

NAVSTA Mayport Hazardous Waste Management Plans is provided as a separate attachment titled: GPI_39_SOPA_(ADMIN)_MYPTINST_5090.1G.

Naval Station Mayport Spill Prevention, Control, and Countermeasure Plan is provided as a separate attachment titled: GPI_38_NSMayport_SPCC_Plan.pdf.

DoD policy limits the dissemination of information. Facility Response Plans will be made available to the successful offeror with appropriate credentials post award.

Naval Station Mayport SOPA (ADMIN) MYPTINST 5090.4B is provided as a separate attachment titled: GPI_39_SOPA_(ADMIN)_MYPTINST_5090.4B.pdf.

40 294 Section C- 1800000 2.4.2

This section states that training shall include requirements for implementing the Base’s SPCC Plans, the Base’s Storm water Pollution Prevention Plan (SWPPP) and OPNAVINST 5090.1 series, and 5090.4 series. Will the Government please provide these documents?

Naval Station Mayport Spill Prevention, Control, and Countermeasure Plan is provided as a separate attachment titled: GPI_38_NSMayport_SPCC_Plan.pdf.

Refer to: Section J, Annex 1800000 Environmental, Attachment J-1800000-05 Storm Water Monitoring Plan - NAVSTA Mayport for Naval Station Mayport Stormwater Pollution Prevention Plan

OPNAV Instructions are available at: <https://doni.documentservices.dla.mil/opnav.aspx>.

41 315 Section C- 1800000 3.3

This section states that hazardous waste shall be picked up at SAAs within 2 working hours of request call from the SAA owner and taken to the 90 Day Storage Facility. Will the Government please provide a list of SAAs?

MCSF - BI Satellite Accumulation Area Map is provided as a separate attachment titled:

GPI_41_SAA_Map_MCSF-BI.pdf. 0002

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

42 316 Section C- 1800000 3.3

This section states that waste accepted at the 90-Day Storage Facility must be processed (packaged, labeled, and in correct placement) by COB, form DD1348 shall be submitted within 5 days. Can the Government please confirm who the DD1348s be submitted to? Can the Government also verify if waste will be disposed of through a contract with DLA?

DD1348 shall be submitted to the Contracting Officer (KO) or a representative designated by the Contracting Officer, the Contracting Officer's Representative (COR), and the Installation Environmental Program Manager (IEPM).

All regulated waste shall be disposed of through NAVSTA Mayport Part B Facility. Refer to: Section C, Annex 0200000 Management and Administration, Spec Item

2.10.2.5 Regulated Waste Disposal.

43 31 I

52.211-12 Liquidated Damages--

Construction

What is the daily rate for liquidated damages under FAR 52.211-12? See Amendment 0002. The referenced clause has been moved from clauses incorporated by reference to clauses incorporated by full text and rates have been provided. 0002

44 101 Annex 1502000 2.2.1 Can the Government verify how many Cathodic Protection Systems are there and where they are located?

Section C, Sub-annex 1502000 Facility Investment - MCSF-BI, Spec Item 2.2.1 Certification, Training, and Licensing (Page 101 of 331) includes Certification, Training, and Licensing requirements for any personnel performing work on cathodic protection systems under this Sub-annex. There is not a separately maintained inventory for this requirement.

45 300 J-1605000-02 complete

How many Air Compressors, Alarm Devices, antennae, chemical Feed systems, control panels, deaerator systems, electric motors, filters, other current devices, receivers, reverse osmosis water filtration systems, sensors, tanks, transmitters, etc. are there for the IMP... as they are not listed in the any of the J attachments?

A component level inventory will not be provided.

The Performance Work Statement (PWS) are based on a Systems Approach. The Contractor is responsible for the Systems described in the PWS and all mechanically and electrically interlocked parts, equipment, and components forming the systems.

46 265 J-1503040-03 complete Will the government provide a list of all equipment to be maintained at each pool listed? See Government response to GPI No. 45.

47 58 L

5252.215-

CONTENT

OF

PROPOSAL

S (b)(1)(h)

RFP says "agreements must include company name, DUNS number, address, point of contact, email address, phone number and fax number for the joint venture/partnership and each member of the joint venture/partnership". At this point, joint venture operating agreements have already been executed. Is it sufficient to include the above required information in the signed letters of commitment rather than revising and re-excuting the operating agreement to include that information?

That will suffice.

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

Section C Annex 1602000 Annex 1604000 Annex 1605000 Annex 1606000 paragraph 3.2

The Utilities Annexes under paragraphs 3.2 require a 15 minutes response time during normal working hours. What would constitute a response? Due to the impact this response time would have on available resources would the government consider matching the response times contained in Annex 1502 of 1 hour.

Response time commences upon Contractor discovery or Government notification and ends when personnel qualified to diagnose and repair the system arrives onsite with the tools, material, and equipment required to accomplish the repair.

Response times will not be revised.

49 NA GPIF NA Prior to releasing Questions & Answers will the Government remove Column I?

Offeror information (Column I on the Government Pre-Award Inquiry Form) will not be disclosed. Only questions, solicitation references for the questions, and Government responses will be provided.

50 52 L.10 1

"In accordance with the referenced clause, the contractor may be entitled to an adjustment in contract price only when a new Service Contract Labor Standards wage determination, Construction Wage Rate Requirements general decision, or CBA is modified into the contract and it affects wages and fringe benefits of covered employees." It is not specified in this sentence whether we do or don't escalate CBAs IAW the agreements. Can you clarify if we can escalate CBAs? Do we use the current year wage rates and benefits for all years being priced or the out years the CBA shows and not escalate beyond that?

Paragraph (a) of FAR clause 52.222-43, Fair Labor Standards and Service Contract Labor Standards - Price Adjustment, states "This clause applies to both contracts subject to area prevailing wage determinations and contracts subject to collective bargaining agreements".

In accordance with this clause and as stated in paragraph L.10 Unit Price Adjustments of the RFP, offerors shall not include escalation of wage and fringe benefit rates for covered employees.

51 59 L 4

Proposal Requirements: All binder covers and spine inserts will contain the solicitation number and title, the offeror's name, and individual point of contact, including phone number and email address. Does the spine need to have POC information--name, phone number and email address?

Yes. As stated in the RFP, "All binder covers and spine inserts will contain the solicitation number and title, the offeror's name, and individual point of contact, including phone number AND email address."

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

52 Attachment JB2 The Government did not include a column for direct subcontractor costs.

In which column should offerors include these subcontractor costs (including their overhead, G&A and profit)?

Offerors are responsible for allocating proposed pricing to the JB-2 Supplemental Pricing data elements in the format provided. As stated the RFP, offerors shall provide a price narrative explaining how all direct and indirect costs are allocated to the cost elements identified in the JB-2.

Pricing shall be provided for all JB-2 Supplemental Pricing data elements whether work is proposed to be performed by the offeror as the prime contractor, subcontracted, or accomplished by other means.

No, offerors shall not modify/add columns in order to align with their specific estimating practices.

Offerors shall utilize the MS EXCEL pricing attachments provided in Section J to submit the ELIN and JB-2 Supplemental Pricing data in the format provided. Formulas shall be traceable. Failure to do so may be cause to render the offer nonresponsive. Refer to:

5252.215-9300 CONTENT OF PROPOSALS (JAN 2003), (b) The offeror shall submit the following information, (2) Price Proposal Binder, e, RFP Page 58 of 72.

53 36 CBA-2005-3001 Article XVIII(A) Is the contribution rate on hours worked or total annual hours?

The CBA is an agreement between the Union and the incumbent contractor. This information is not available to the Government. Contact information for the International Union of Elevator Constructors, Local 49 can be found at http://www.iuec49.org/contact-us.php

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

54 Attachment JB2

The JB2 for this ELIN (A702) has columns for overhead, G&A and profit in gray as if offerors are to not use them. However, Section L.9 states all ELIN are to include recurring and non-recurring work shall be fully loaded with fees, O/H and G&A. Is the Government-provided material cost inclusive of an offeror's overhead, G&A, and/or profit so that an offeror is in compliance with their disclosed practices and paragraph L.9, fully loaded pricing?

All indirect cost associated with performing work, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, union agreements, crew sizes, hand tools, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, profit, and all other associated markups shall not be included in the direct material cost since the cost for these items were included in the labor hour unit price bid. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements shall not be included. Refer to: Section J, Annex 0200000 Management and Administration, Attachment J-0200000-01 Definitions and Acronyms, Direct Material Costs.

Any overhead, G&A and profit associated with ELIN X702, Material and Equipment, should be included in the unit price bid by the Contractor to perform one hour of work-in-place (i.e. ELINs X700 and X701).

55 Section M 3.b

Paragraph 3.b states "For purposes of this evaluation, Base Operations Support (BOS) services (or equivalent) projects shall encompass at least two of the following and a minimum of one other annex/sub-annex as part of the scope of work (see Factor 3 for a list of annexes/sub-annexes)" However, on page 65, Factor 1, Corporate Experience (i) says that submitted projects must encompass all four areas identified in Paragraph 3.b. Please clarify that submitted projects that show experience on two of the four areas identified in paragraph 3.b (plus one from Factor 3) qualify as similar experience.

A relevant project must encompass at least two of the requirements listed in paragraphs a.

through d. of the Relevant Project description and a minimum of one other annex/sub-annex as part of the scope of work.

There is an additional solicitation submittal requirement under Factor 1 Corporate Experience that the offeror's two (2) to five (5) relevant projects in aggregate (emphasis added) must demonstrate experience self-performing or managing all four of the requirements listed in paragraphs a. through d. of the Relevant Project description.

56 Section C 2.7.1.3 Will the SSHO designated for the contract be considered the SSHO for all sites under the contract including NS Mayport, MCSF-BI and outlying areas .

The Contractor shall provide a Safety oversight team that includes a minimum of one Competent Person at each project site to function as the Site Safety and Health Officer (SSHO). Refer to: Section C, Annex 0200000 Management and Administration, Spec item

2.7.1.3 Site Safety and Health Officer (SSHO).

57 Section C 2.7.1.6 Can the Transportation Manager and the WHE Operation and Maintenance Manager be the same person?

Yes, the Transportation Manager may be the same person as the WHE Operation and Maintenance Manager but shall have fulfilled the pre-requisite qualification and experience specified for both positions.

58 Section C 2.14.1 Please provide historical data on the amount of ROMs performed annually This is a new requirement. Historical quantity of ROMs provided annually is not available.

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

59 Section C 2.14.1 Please provide historical data on the amount of estimates are performed annually.

Historically, approximately 650 detailed scopes of work and detailed estimates have been required annually for all non-recurring work requirements. Quantity provided specifically for work exceeding the recurring work limits of liability is unknown.

Historical data associated with contracts prior to this solicitation may present data that may not be representative of requirements specified.

60 Section C 2.14.1

The Informational Note states that providing ROMS and Estimates requires a significant effort by the contractor. Please quantify "significant" in terms the number of each: ROM and Estimates. In the absence of actual numbers of each type of requirement please provide an estimated man-hour.

Without this information, bidders are at great risk of either overcharging for this requirement or failing once on site.

See Government responses to GPI No. 58 and 59.

61 70 Section C - 1502000 3.3

If IMPs are not already written and in place on the current contract, the requirement to submit IMPs within 30 days after award per Section F is not a realistic timeframe for offerors to develop site-specific IMPs. Non-incumbent offerors do not have access to site systems and equipment or maintenance records to assess their current condition and develop tailored IMPs to properly maintain systems and equipment. Non-incumbent offerors will require a significantly longer period of time to develop IMPs after the contract is awarded. Will the Government consider accepting conceptual IMPs that outline are plan to maintain systems and equipment included in the solicitation J tables within 15 days after award?

No, conceptual IMPs are not acceptable.

This is a performance based requirement. The Contractor is responsible for determining the approach/methods to meet the performance objectives and standards beginning on the first day of contract performance.

62 70 Section C - 1502000 3.3

Section 3.3 of the PWS requires the contractor to complete all repairs to IMP assets in 48 hours. Not all issues impact the functionality of an asset and the 48 hr requirement often requires the contractor to expedite materials (if not in bench stock) and use overtime. This is in direct conflict with the definition of IMP provided in Section J "IMP is a recurring state -of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components.

IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance into one optimal program." Requiring all repairs (whether they are critical or not) to be completed in 48 hours is not a best practice or optimal, nor will it result in lower costs to the government. Will the government consider removing or qualifying this requirement to include only bona-fide emergency repairs?

The requirement to respond within 30 minutes and complete the repair within 48 hours has been reviewed and will not be amended.

When a problem or a need for repair is identified during normal working hours, the Contractor shall respond within 30 minutes and complete the repair within 48 hours.

When a problem or a need for repair is identified outside normal working hours, the Contractor shall respond within two hours and complete the repair within 48 hours.

Refer to: Section C, Sub-annex 1502000 Facility Investment, Spec Item 3.3 Integrated Maintenance Program (IMP).

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

63 66 Section C - 1502000 3.2

Section C 1502000 3.2 PM Program states PM is to be performed per manufacturers and OEM. Does this mean we can’t utilize Industry Best Practices? This section also requires an annual Condition Assessment which adds time.

The performance standard requires the PM to be performed IAW the manufacturers recommended procedures and OEM standards, this appears to prevent us from utilizing industry best practices. Is this the desired outcome?

This is a performance based requirement. The Contractor is responsible for determining the approach/methods to meet the performance objectives and standards beginning on the first day of contract performance.

64 111 Section C 1502000 3.2

Auxiliary Generator Systems requires an annual load bank test of all “emergency” generators. There is no way to determine which generators are classifies as “emergency”. J1502000-15 and J1502000-05 for MCSF-BI does not identify which generators are designated as emergency. J-1502000- 02 lists several facilities as Emergency Generator but there is no corresponding generator asset in the appropriate Generator J table.

All Auxiliary Generator Systems identified in J-1502000-05 Auxiliary Generator Systems – MCSF-BI are classified as emergency generators.

In this contract, the terms "Auxiliary Generator" and "Emergency Generator" are used synonymously.

65 ELIN Schedules Items A700, A701, and A704-A714 all "MUST BE NEGOTIATED BY KO". Are contractors expected to submit a price for these items with their proposal? If so what is the basis for the price as no scope is given?

Yes, offerors shall provide a completed Section J Exhibit Line Item Number (ELIN) Pricing Attachment. Refer to: Section M - Evaluation Factors for Award, M.3 EVALUATION FACTORS, 3. Basis of Evaluation and Submittal Requirements for Each Factor. (a) Price,

(1) Solicitation Submittal Requirements, (ii), RFP Page 63 of 72.

ELINs X700 and X701 - Refer to Section J, Annex 0200000 Management and Administration, Attachment J-0200000-01 Definitions and Acronyms for a definition of Unit Priced Labor Hour Work and Section C, Annex 0200000 Management and Administration, Spec Items 2.15 through 2.15.3.

ELINs X704 through X714 - Direct Labor and Direct Material Limits of Liability for each Category Service Order provided in Section J, Annex 0200000 Management and Administration, Attachment J-0200000-13 ELINs and Section C, Annex 0200000 Management and Administration, Spec Items 2.15 through 2.15.3.

This is a performance based requirement. Offerors are responsible for pricing the contract requirements.

66 ELIN Schedules Regarding the non-recurring ELINs: What is meant by "MUST BE NEGOTIATED BY KO"? Will negotiations take place prior to issuance of the work orders?

Direct Labor Hours and Direct Material will be negotiated prior to issuance of task orders for Non-Recurring Work utilizing ELINs which state "MUST BE NEGOTIATED BY KO".

The Unit Prices proposed for these ELINs will not be re-negotiated when non-recurring work is ordered.

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

JB-2

Supplemental Pricing

The JB-2 Supplemental Pricing template does not have colums for Subcontracts or Other Direct Costs. Where should subcontract and Other Direct Costs be included? Or may the contractor add columns for these types of cost?

See Government responses to GPI No. 27 and 52.

68 58

Section C 1502000

NAVSTA

Mayport Facility

Investment

2.2.1

Spec item 2.2.1 states “All work shall be performed by personnel trained and certified by the OEM”. Discussion: Majority of Manufacturers do not offer factory training to anyone that is not a distributor of their product which in most cases is very limited in a geographical location. Also, it is industry practice to not have OEM competitive products represented by the same Fire Alarm Contractor/Distributor. Will the Government consider the possibility of relaxing this requirement due to not being an obtainable standard?

GOVERNMENT RESPONSE PENDING.

69 102 1502000 - MPBI 2.2.2

Is the contractor responsible for providing backfill hours for the "core crew requirements" when an employee goes on vacation, calls out sick, or is not present at his/her core shift?

Yes. As a minimum, the Contractor shall provide the Core Crew staffing during the times specified. Refer to: Section C, Sub-annex 1502000 Facility Investment - MCSF-BI, Spec Item 2.2.2 Core Crew Requirements.

GOVERNMENT PRE AWARD INQUIRY FORM

Page Section Para.

REFERENCE Amend

No.

GPI

No. QUESTION GOVERNMENT RESPONSE

70 ALL

Attachment J- 1502000-19 &

We understand that government wants the contractors to be responsible for the “ entire system” under either the PM and/or IMP program "The Contractor shall develop and implement an IMP for the HVAC and Refrigeration Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the HVAC and Refrigeration Systems such as: air handling units, blowers, boilers, chillers, compressors (including air compressors), condensers, controls, cooling towers, dehumidifiers, diffusers, driers, ducts, electrical disconnects, evaporators, fans, fan coil units, filters, fire dampers, fresh air dampers, That said in order to estimate material cost and develop labor hours by skill mix contractors need a complete listing of all components within a given system.