PPI_Log_20180621.pdf
PDF 138 KB Posted
- Solicitation number
- N6945018R0505
About this file
PPI_Log_20180621.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6945018R0505_0006.pdf | ||
| _amend_0005_attachments.zip | ZIP file | |
| _18R0505-0005.pdf | ||
| N6945018R0505_0004.pdf | ||
| N6945018R0505_0003.pdf | ||
| N6945018R0505_0002.pdf | ||
| AMAG_FORM_NAS_JAX.xls | XLS spreadsheet | |
| site_visit_log.pdf | ||
| Subcontracting_Plan.docx | DOCX document | |
| SF30_0001_20180615.pdf | ||
| SUBCONTRACTING_PLAN.pdf | ||
| PPI_Log_20180611.pdf | ||
| AMAG_FORM.pdf | ||
| _PPI_Log_form.xlsx | XLSX spreadsheet | |
| _Proposal_Forms.doc | DOC document | |
| _NAS_Kingsville_base_Acss_Frm.pdf | ||
| N6945018R0505RFP.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N69450-18-R-0505 Pre Proposal Inquiry (PPI) LOG
The PPI log is for informational purposes only. It does not amend the RFP. If a revision to the RFP is required, a formal amendment will be issued.
PPI #
RFP Section Paragraph Number Page Number Drawing Number Question Government Response RFP / Solicitation Attachment
Provided Yes or No
ACQ Amend
Factor 1, Corporate
Experience 10 of 58 N/A
We request that the relevant project definition be modified to allow a 10 year lookback for relevant projects and that the RFP be modified to only require one (1) of the submitted relevant projects to be performed as a prime contractor. Those changes can be accomplished as follows: On page 10 of 58 in the RFP, under Factor 1, Corporate Experience, (i) Solicitation Submittal Requirements, we request that you change the first sentence to read, “Submit a minimum of two (2) and a maximum of five (5) construction projects that the offeror completed that demonstrate your experience in preforming projects that are similar size, scope and complexity to the RFP.” Change the last sentence of this same paragraph to read, “At least one project must demonstrate a multi-phase project on an active runway and at least one project must demonstrate experience as a prime contractor.” Change the next sentence to read, “Projects submitted for the Offeror shall be completed within the past ten (10) years of the date of issuance of this RFP.”
Requirement remains unchanged no 0001
Attachment C Sub-contracting goals
XX XX In order meet sub-contracting goals with the local business exchange(VBX), who was not aware of the project, time was lost in finding sub contractors therefor we are requesting that the bid date be extended an additional 30 days.
Requirement remains unchanged no 0003
ED Plan Sheets ED-101 through ED-
187 Please provide approximate sizes for manholes(M) and handholes(H) to be removed.
Manholes and handholes vary in size and type throughout the project site and have not been itemized no 0003
ED Plan Sheets ED-101 through ED-
Is there an existing counterpoise system that runs adjacent to or on top of the existing conduit system?
Airfield circuit counterpoise may or may not be present for all existing conduit systems. Assume all existing airfield circuit conduits are provided with counterpoise system no 0003
ED Plan Sheets ED-101 through ED-
Please confirm the existing the conduit routing and approximate depth, for runway edgelight system is handhole to handhole or can to can.
Existing conduit routing and depth varies throughout the project site.
Assume depth to be 24” below finished grade for airfield lighting circuits along pavement edge no 0003
ED Plan Sheets ED-101 through ED-
Please provide information on the composition of the existing conduit system; ie PVC, GRS, "Orangeberg".
Existing conduit system varies in type and has not been itemized.
Majority of existing conduit expected to be PVC no 0003
ED Plan Sheets ED-101 through ED-
For the existing Carrier Deck kerf: Is the wire in conduit or installed directly in the kerf? Existing airfield lighting circuit installation in sawkerf varies. Majority of wiring is expected to be installed in PVC conduit that is installed in sawkerf no 0003
N69450-18-R-0505 Pre Proposal Inquiry (PPI) LOG
The PPI log is for informational purposes only. It does not amend the RFP. If a revision to the RFP is required, a formal amendment will be issued.