PPI_Log_20180611.pdf

PDF 134 KB Posted

Attached to
Kingsville Airfield Runway Repair, NAS Kingsville, TX
Solicitation number
N6945018R0505
Issued by

About this file

PPI_Log_20180611.pdf

View the file

Other files

File Type Posted
N6945018R0505_0006.pdf PDF
_amend_0005_attachments.zip ZIP file
_18R0505-0005.pdf PDF
N6945018R0505_0004.pdf PDF
N6945018R0505_0003.pdf PDF
PPI_Log_20180621.pdf PDF
N6945018R0505_0002.pdf PDF
AMAG_FORM_NAS_JAX.xls XLS spreadsheet
site_visit_log.pdf PDF
Subcontracting_Plan.docx DOCX document
SF30_0001_20180615.pdf PDF
SUBCONTRACTING_PLAN.pdf PDF
AMAG_FORM.pdf PDF
_PPI_Log_form.xlsx XLSX spreadsheet
_Proposal_Forms.doc DOC document
_NAS_Kingsville_base_Acss_Frm.pdf PDF
N6945018R0505RFP.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N69450-18-R-0505 Pre Proposal Inquiry (PPI) LOG

The PPI log is for informational purposes only. It does not amend the RFP. If a revision to the RFP is required, a formal amendment will be issued.

PPI #

RFP Section Paragraph Number Page Number Drawing Number Question Government Response ACQ Amend

Factor 1, Corporate

Experience 10 of 58 N/A

We request that the relevant project definition be modified to allow a 10 year lookback for relevant projects and that the RFP be modified to only require one (1) of the submitted relevant projects to be performed as a prime contractor. Those changes can be accomplished as follows: On page 10 of 58 in the RFP, under Factor 1, Corporate Experience, (i) Solicitation Submittal Requirements, we request that you change the first sentence to read, “Submit a minimum of two (2) and a maximum of five (5) construction projects that the offeror completed that demonstrate your experience in preforming projects that are similar size, scope and complexity to the RFP.” Change the last sentence of this same paragraph to read, “At least one project must demonstrate a multi-phase project on an active runway and at least one project must demonstrate experience as a prime contractor.” Change the next sentence to read, “Projects submitted for the Offeror shall be completed within the past ten (10) years of the date of issuance of this RFP.”

Requirement remains unchanged 0001

File details come from the government source that posted it.