N6945018R0505RFP.pdf
PDF 502 KB Posted
- Solicitation number
- N6945018R0505
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6945018R0505_0006.pdf | ||
| _amend_0005_attachments.zip | ZIP file | |
| _18R0505-0005.pdf | ||
| N6945018R0505_0004.pdf | ||
| N6945018R0505_0003.pdf | ||
| PPI_Log_20180621.pdf | ||
| N6945018R0505_0002.pdf | ||
| AMAG_FORM_NAS_JAX.xls | XLS spreadsheet | |
| site_visit_log.pdf | ||
| Subcontracting_Plan.docx | DOCX document | |
| SF30_0001_20180615.pdf | ||
| SUBCONTRACTING_PLAN.pdf | ||
| PPI_Log_20180611.pdf | ||
| AMAG_FORM.pdf | ||
| _PPI_Log_form.xlsx | XLSX spreadsheet | |
| _Proposal_Forms.doc | DOC document | |
| _NAS_Kingsville_base_Acss_Frm.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N69450-18-R-0505 PROJECT 1446320 - AIRFIELD RUNWAY REPAIRS AT NAVAL AIR STATION (NAS) KINGSVILLE, TX.
This acquisition w ill be solicited on an unrestricted basis w ith full and open competition.
This solicitation w ill result in a Firm Fixed Price Design-Bid-Build Construction contract.
This project magnitude is between $25,000,000 TO $40,000,000
NAICS Code: 237310 – Highway, Street and Bridge Construction
All correspondence regarding this solicitation shall be direct via email to LaCorsha Noel at Lacorsha.Noel@navy.mil AND Barbara Czinder at Barbara.Czinder@navy.mil.
NOTE: SPECIFICATION WILL BE POSTED ON WWW.NECO.NAVY.MIL
“OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE IF FUNDS ARE NOT AVAILABLE. NO AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION. OFFERORS WILL NOT BE REIMBURSED FOR ANY EFFORT OR PROPOSAL COSTS RESULTING FROM
THIS SOLICITATION.”
LACORSHA NOEL 904-542-6809
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
30-May-2018
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________650 calendar days after receiving award, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________4 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________03 Jul 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFAC SOUTHEAST
GULFCST
BLDG 903, PO BOX 30
NAS JACKSONVILLE
JACKSONVILLE FL 32212-0030
N69450
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
03:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
N6945018R0505 58
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N6945018R0505
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Each
BASE BID
FFP
Runway Lighting Repairs located at NAS Kingsville, Texas FOB: Destination
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
Section 00100 - Bidding Schedule/Instructions to Bidders
INFORMATION TO OFFERORS
Additional Information for Offerors
1. Contractor’s performance will be evaluated using the respective contractor performance evaluation report entry system located on the website http://www.cpars.gov/. Prior to commencement of work the contractor is required to provide the government with the name, phone number and e-mail address of the “Contractor’s Representative” that will be responsible for receipt and review of draft performance evaluations prepared by the government in the appropriate system. It is the contractor’s responsibility to keep this contact information current. NFAS 42.1503-100
Information to Offerors:
This procurement is solicited on an unrestricted basis with full and open competition. This acquisition will result in a FIRM-FIXED PRICE (FFP) Design-Bid-Build construction contract for Airfield Lighting Repairs, NAS Kingsville, TX.
Project magnitude:
Between: $25,000,000 and $40,000,000
1. Questions/Inquiries Inquiries regarding the Request for Proposal (RFP) shall be submitted electronically using the Pre-Proposal Information (PPI) Request provided as an attachment. The Point of Contact (POC) for questions/inquiries is as follows:
Questions/Inquiries Primary POC: Secondary POC:
LaCorsha Noel Barbara Czinder Phone: (904) 542-6809 Phone: (904) 542-6834 Email: Lacorsha.Noel@navy.mil Email: Barbara.czinder@navy.mil
FAX: (904) 542-6349
The Government does not intend to respond to inquiries submitted less than 10 days before the proposal receipt date.
2. Proposal Delivery Information:
Proposal Acceptance Period: 90 days from receipt of offers.
Proposal Due Date/Time: 03 July 2018; 3:00 PM (Eastern Time)
Proposal Delivery Information:
(i) Hand Delivery:
Offerors submitting their proposal by hand shall submit the proposal to the following address located at the corner of Yorktown and Langley (the main entrance faces the parking lot):
Naval Facilities Engineering Command Southeast Gulf Coast ACQ Attention: LaCorsha Noel BLDG 903 Yorktown Jacksonville, FL 32212
Proposal(s) package must be clearly marked on the outside with the solicitation number, Government POC name and “Do Not Open In Mail Room”.
Offerors must submit the Attached AMAG form (NAS Jacksonville base access form) for hand delivery. This form must be submitted at least 2 business days in advance of the proposal receipt date. Submit your form to Lacorsha.Noel@navy.mil and barbara.czinder@navy.mil.
On the day of proposal delivery you must bring the following with you to the NAS Jacksonville Base Security Office in order to obtain a temporary base pass:
Copy of the AMAG form that was previously submitted 2 business days in advance.
You will be required to have 2 forms of photo ID's on the day you are to pick-up your temporary base pass.
If the occupants in the vehicle do not have the proper documents when filling out the picking up their temporary Base Access Pass, base security will not be able to issue them a pass.
You must allow your firm’s delivery person self sufficient time at the base security office for the processing of the application. Please expect delays for standing in line.
The Base Security Office opens at 7 a.m. and promptly closes at 3 p.m. You MUST go inside the Base Secure Office to obtain your temporary pass.
Note: On the day of proposal delivery the vehicle driver must have a valid driver’s license, current vehicle registration and/or rental car contract, current proof of insurance. The level of security at the Naval Air Station Jacksonville may change at any time. As the level of security heightens, the amount of time required to gain access to the Naval Air Station also increases.
(ii) Courier Delivery:
Offerors submitting their proposal via courier delivery shall submit their proposal to the following address located at the corner of Yorktown and Langley (the main entrance faces the parking lot):
Gulf Coast ACQ Attention: LaCorsha Noel BLDG 903 Yorktown
Government POC name and “Do Not Open In Mail Room”
(iii) U.S. Mail
Gulf Coast ACQ Attention: LaCorsha Noel P.O. Box 30
Government POC name and “Do Not Open In Mail Room”.
LATE SUBMITTALS WILL NOT BE CONSIDERED.
3. Pre-Proposal Conference See FAR clause 52.236-27 Alt I.
4. Reserved N/A
5. Subcontracting Information
SMALL BUSINESS SUBCONTRACTING PLAN
(Reference FAR 52.219-9 Alt II and DFARS 252.219-7003)
NAVFAC's command-wide small business subcontracting targets are shown below. These may be higher or lower than percentages that would represent realistic, challenging small business subcontracting goals for this acquisition. Offerors representing as other than small businesses shall establish small business subcontracting plan goals that are consistent with their small business participation and commitment strategies submitted for evaluation under the small business utilization source selection factor in this solicitation and shall document in their subcontracting plans the basis for all proposed goals. Plans shall be submitted with initial offers.
Small businesses identified by name in offerors’ proposals/participation and commitment strategies and considered in the evaluation shall be listed in small business subcontracting plans submitted pursuant to FAR 52.219-9 in order to facilitate compliance with 252.219-7003(e).
6. System for Award Management (SAM)
The System for Award Management (SAM) is a Federal Government owned and operated free web site that consolidates the capabilities in Central Contractor Registry (CCR),/Federal Registration(FedReg), Online Representations and Certifications Application (ORCA), and Excluded Parties List System (EPLS).
Contractors must be registered in SAM prior to award of a Department of Defense (DoD) contract. For more information and to complete the electronic representations and certifications, see the SAM website at https://www.sam.gov. A contract cannot be awarded to a contractor that is not registered in SAM. Remember to review the NAICS codes listed in your SAM record and make sure that you have listed the NAICS code for this procurement:
NAICS 237310 – Highway, Street, and Bridge Construction
7. Federal Contractor Program In accordance with Federal Acquisition Regulation (FAR) 22.1303, any contractor or subcontractor with a contract of $150,000 or more with the Federal Government must take affirmative action to hire and promote qualified targeted veterans which includes, special disabled veterans, veterans of the Vietnam-era, recently separated veterans, and any other veterans who served on active duty during a war or in a campaign or expedition for which a campaign badge has been authorized. Companies MUST file an annual VETS-4212 report, which shows the number of targeted veterans in their work force by job category, hiring location, and number of new hires, including targeted veterans hired during the reporting period and the maximum number and minimum number of employees of such contractor during the period covered by the report. Instructions, information and follow-up assistance is provided at VETS- 4212 Internet site athttps://www.dol.gov/vets/vets4212.htm or employers may contact the VETS- 4212 Processing Center at (866) 237-0275 or e-mail at VETS4212-customersupport@dol.gov..
8. Women Owned Small Business Program Repository
In accordance with the Small Business Administration’s (SBA) WOSB Federal Contract program regulations, EDWOSBs are required to upload and categorize all required documents in the SBA’s General Login System (GLS) at https://eweb.sba.gov/gls.
9. Incurred Expenses The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.
10. No Alternate or Multiple Proposals Neither multiple proposals, nor proposal variations or options, nor alternate or alternative proposals will be considered in the evaluation.
11. Intent to Incorporate Contractor’s Non-Cost/Price (Technical) Proposal
(a) All or part of the successful offeror's Non-cost/price (technical) proposal may be incorporated in any contract resulting from this solicitation. The successful offeror's technical proposal may be incorporated by reference. Nothing contained in the successful offeror's technical proposal shall constitute a waiver to any other requirement of the contract. In the event of any conflict between the successful offeror's technical proposal and any other requirement of the contract, the conflict shall be resolved in accordance with the Order of Precedence clause.
(b) The successful offeror will provide an updated technical proposal which reflects the results/responses to all exchanges and/or Evaluation Notices (ENs) issued during the negotiation process for incorporation in the contract. If, after contract award, it is discovered that changes made during negotiations were not incorporated in the SOW and/or technical proposal, such changes to the Contractor's documents shall be considered administrative in nature and shall be made by unilateral modification to the contract, at no change in contract cost or price or other terms and conditions.
12. Navy Electronic Commerce On-line (NECO) NECO website: HTTPS://www.neco.gov. Amendments will be posted directly to NECO. The posting of amendments generates an automated message to the contractor’s point of contact listed in NECO, alerting them to the posting. The drawings and specifications are available on NECO under the Additional Documents section of this RFP. Additionally, other postings will be made to NECO, such as the pre-proposal inquires (PPI) log, revised drawings, etc., under the Additional Documents section of the RFP. Postings to the Additional Documents section of NECO DOES NOT generate an automated email to contractors. It is the Contractors responsibility to check NECO for any amendments and Additional Documents section for updates to the RFP.
13. List of Attachments and Exhibits to the RFP:
The documents below can be located on for this solicitation on NECO, under: “Documents:
Click here for Additional Documents.”
14. Use of Non-Federal Personnel in Evaluations Not Applicable
BASIS OF AWARD AND EVALUATION
BASIS OF AWARD AND EVALUATION FACTORS
1. The solicitation requires the evaluation of price and the following non-price factors
Factor 1 – Corporate Experience Factor 2 – Safety Factor 3 – Past Performance Factor 4 – Small Business Utilization
The distinction between corporate experience and past performance is corporate experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
2. Basis of Evaluation and Submittal Requirements for Each Factor.
(a) Price:
(1) Solicitation Submittal Requirements:
Provide one (1) original, one (1) copy, and one (1) electronic copy (CD) of the solicitation submittal requirements for pricing identified below.
i. Cover letter with the following information:
Authorized negotiator’s (POC) name POC telephone number POC email address CAGE code DUNS number TIN (taxpayer ID number)
ii. SF1442 (Solicitation, Offer, and Award) with blocks 14 through 20c completed
iii. The Offeror shall submit their prices using Section 00010 CLIN Pricing
iv. Bid Bond (see clause 5252.228-9302 Bid Guarantee in RFP for Bid Bond amount) in the amount of 20% of total project bid price or $3M, whichever amount is less
v. Proof of the Offeror’s filled out Representations and Certifications and Active and Inactive Exclusions from the System for Award Management (SAM)
vi. Copy of annual Vet’s 4212 Report or confirmation notification email from VETS 4212 (demonstrating proof of registration)
vii. Sub-contracting Plan Attachment C (large businesses only)
NAVFAC Southeast sub-contracting goals are as follows:
Small Business – 49% HUBZone –9% Small Disadvantaged Business – 31% Women-Owned Small Business – 12% Service-Disabled Veteran Owned Small Business – 8.5%
(2) Basis of Evaluation:
The Government will evaluate price based on the total price. Total price consists of the basic requirements and any option items (see Section B of the solicitation). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(i) Comparison of proposed prices received in response to the RFP.
(ii) Comparison of proposed prices with the IGE.
(iii) Comparison of proposed prices with available historical information.
(iv) Comparison of market survey results.
(b) Non-cost/price Factors:
Provide one (1) original, four (4) copies and one (1) electronic copy (CD) of the solicitation submittal requirements for non-cost/price factors identified below.
Factor 1, Corporate Experience:
(i) Solicitation Submittal Requirements:
The Offeror shall submit the following information:
Submit a minimum of two (2) and a maximum of five (5) construction projects that the offeror completed as the prime contractor, that demonstrate your experience in performing projects that are similar size, scope and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as construction of a Design-Build or Design-Bid-Build project to include repair, expansion, or construction experience of airfield lighting including runway lighting; airfield signage; airfield electrical distribution and vault. The airfield lighting/electrical scope must have an approximate construction value of $1.5 Million and greater. At least one project must demonstrate a multi-phase project on an active runway.
Projects submitted for the Offeror shall be completed within the past five (7) years of the date of issuance of this RFP. Projects with an interim rating that are 80% complete may be considered.
Lighting/electrical projects on highway, road, and parking area paving projects will not be considered as relevant.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.
The attached Construction Experience Project Data Sheet (Attachment D) is MANDATORY and
SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded;
however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods).
If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity or the Joint Venture partners. Offerors are still limited to a total of five (5) projects combined.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract in order for the past performance information of the affiliate/subsidiary/parent/LLC/LTD member companies to be considered. The proposal shall state specific commitments of technical resources (e.g. personnel, equipment) that the affiliate/subsidiary/parent/LLC/LTD member companies commit to the performance of this contract. In particular, the proposal will clearly state the specific commitments of resources of the affiliate/subsidiary/parent/LLC/LTD member that will be located at the worksites and company offices in the city/area of the project. The proposal shall also describe specific roles of the affiliate/subsidiary/ parent/LLC/LTD member companies in terms of the work it will either selfperform or manage on behalf of the Offeror in performance of the contract. Any projects submitted in excess of the five (5) will not be considered.
The Offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The Offer must provide a letter of commitment and an explanation of the meaningful involvement that the subcontractor will have in performance of this contract.
(ii) Basis of Evaluation:
The requirement for acceptability will be based upon the projects submitted by the Offeror in its proposal, the Offeror must have at least two projects that list/meet experience with airfield lighting repair and construction projects. Road, street and highway paving and parking lots will not be considered as relative projects.
Factor 2, Safety:
The Offeror shall submit a narrative that fully describes the safety management system that they will use to oversee the safety compliance and performance of self-performed and sub-contractor performed work and the Offeror’s method for qualifying, evaluating, selecting all tiers of subcontractors. EMR, DART and TRC Rates shall not be submitted for subcontractors. The Offeror shall submit the following information (Attachment E Safety Data Sheet & Narrative [Mandatory]). The Offeror shall submit the following information:
(1) Experience Modification Rate (EMR):
Include three previous complete calendar years’ worth of data. This rate compares company’s annual losses in insurance claims against its policy premiums. The offeror may submit an insurance company-provided equivalent rate if no EMR exists. If the offeror has no EMR or premium, for any year, affirmatively state so and explain why. Any extenuating circumstances that affect the EMR and negative trends should be addressed as part of the factor submission. EMR rates above 1.0, in any of the previous three years, will be considered UNACCEPTABLE, unless an adequate explanation is provided to address the extenuating circumstances that affected the rate.
(2) OSHA Total Recordable Case (TRC) Rate:
For the three previous complete calendar years, submit your OSHA Total Recordable Case (TRC) Rate, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If you cannot submit an OSHA TRC Rate, affirmatively state so, and explain why. Any extenuating circumstances that affected the OSHA TRC Rate data should be addressed as part of this element.
OSHA TRC rates above 4.0, in any of the previous three years, will be considered UNACCEPTABLE,unless an adequate explanation is provided to address the extenuating circumstances that affected the rate.
(3) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate:
For the three previous complete calendar years, submit your OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If you cannot submit an OSHA DART Rate, affirmatively state so, and explain why.
Any extenuating circumstances that affected the OSHA DART Rate data should be addressed as part of this element. OSHA DART rates above 3.0, in any of the previous five years,will be considered UNACCEPTABLE, unless an adequate explanation is provided to address the extenuating circumstances that affected the rate
(4) Technical Approach for Safety:
Describe the plan that the Offeror will implement to qualify, evaluate, select and oversee its potential subcontractors. The Safety narrative shall be limited to one page. Offerors must submit both: (1) a plan to include the safety performance of subcontractors in the selection process for all levels of subcontractors and (2) a plan to monitor the safety of those subcontractors during contract performance, highlighting what specific management practices will be in place for providing deliberate safety program management and mishap prevention support to those subcontractors whose EMR is greater than 1.0, whose TRC is greater than 4.5 and/or whose DART rate is greater than 3.0. Offerors who fail to submit either of these will be rated UNACCEPTABLE.
Note: The narrative shall be limited to two pages. For a partnership or joint venture, the submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. Safety narratives for joint ventures may be up to four pages in length.
(5) Basis of Evaluation:
The Government is seeking to determine whether the Offeror has an acceptable safety record. The Government will evaluate the Offeror’s overall safety record as evidenced by the EMR, TRC and DART rates, if the Offeror’s plan includes safety in the evaluation and selection of subcontractors, and if the narrative includes a plan to monitor the safety performance of subcontractors during performance. The evaluation will collectively consider the following:
- Experience Modification Rate (EMR)
- OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) and Total Recordable Case (TRC) Rates
- Offeror Technical Approach to Safety
- Other sources of information available to the Government
(1) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate:
The Government will evaluate the OSHA TRC Rate to determine if the Offeror’s OSHA TRC rate is above
4.0 and extenuating circumstances that impact the rates. OSHA TRC rates above 4.0, in any of the previous three years, will be considered UNACCEPTABLE, unless an adequate explanation is provided to address the extenuating circumstances that affected the rate.
(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate:
The Government will evaluate the OSHA DART Rate to determine if the Offeror’s OSHA DART rate is above 3.0 and extenuating circumstances that impact the rates. OSHA DART rates above 3.0, in any of the previous three years, will be considered UNACCEPTABLE, unless an adequate explanation is provided to address the extenuating circumstances that affected the rate.
(2)Technical Approach to Safety:
The Government will evaluate the narrative to determine if subcontractor safety performance will be considered in the qualification, evaluation, selection, of all levels of subcontractors on the upcoming project, and both the plan to monitor the safety of those subcontractors during contract performance, highlighting what specific management practices will be in place for providing deliberate safety program management and mishap prevention support to those sub-contractors whose EMR is greater than 1.0, whose TRC is greater than 4.5 and whose DART rate is greater than 3.0. Offerors who fail to address either of these items (i.e. whether the safety performance of subcontractors will be evaluated in the selection process for all levels of subcontractors and whether the safety of those subcontractors will be monitored during contract performance) will be rated UNACCEPTABLE.
(4) Other Sources of Information Available to the Government: Other sources for safety may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS) in Enterprise Safety Applications Management System (ESAMS), Contractor Performance Assessment Reporting System (CPARS) and other related databases.
Offeror’s Experience Modification Rates (EMR) will be evaluated against the following Navy standards:
Risk High Risk Greater than 1.0 to 1.1 Extremely High Risk Greater than 1.1
Offeror’s DART and TRC rates will be evaluated against the following Navy standards:
Risk DART Rate High Risk From 3.0 to 4.0 Extremely High Risk Greater than 4.0
Risk TRC Rate High Risk From 4.5 to 5.99 Extremely High Risk Greater Than 6.0
Factor 3, Past Performance:
If a completed Construction Contractor Appraisal Support System (CCASS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1. If there is not a completed CCASS evaluation then submit Past Performance Questionnaires (Attachment F) for each project included in Factor 1. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal.
Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs.
However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, LaCorsha Noel at LaCorsha.Noel@navy.mil, 904-542-6809 and Barbara Czinder at Barbara.Czinder@navy.mil, 904-542-6834.
Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Experience. Offerors may also address any adverse past performance issues. Explanations shall not exceed two (2) double-sided pages (or four (4) singlesided pages) in total.
The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor. In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the PastPerformance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
Performance award or additional information submitted will not be considered.
This evaluation focuses on how well the Offeror performed on the relevant projects submitted under Factor 1 – Experience and past performance on other projects currently documented in known sources.
Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown.
The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination.
In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the Offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”
Factor 4, Small Business Utilization
Factor 4 consists of 4A, Achievements, and 4B, Small Business Participation and Commitment.
The evaluation of 4A and 4B are of equal importance to the determination of Factor Rating.
4.A – ACHIEVEMENTS
All offerors shall provide a narrative (limited to two pages) to describe their achievements in supporting the Government’s policy to provide maximum practicable opportunities for small business (SB), veteran-owned small business (VOSB), service-disabled veteran-owned small business (SDVOSB), historically underutilized business zone (HUBZone) small business, small disadvantaged business (SDB), and women-owned small business (WOSB) concerns to participate as subcontractors consistent with efficient contract performance. In support of narrative submissions:
a. All offerors shall submit small business subcontracting information associated with each project cited under the Corporate Experience Factor in the format provided in Attachment G, Small Business Subcontracting Record.
b. Offerors representing as other than small businesses shall also provide copies of the most current individual subcontracting reports (ISRs) associated with each project cited under the Corporate Experience Factor if a small business subcontracting plan was required by the contract. If such projects were completed under specific task orders, provide ISRs for the overall contract. For cited projects with state and local government agencies, provide similar subcontracting performance reports if required by the contracts.When not specifically addressed in the ISR or similar report, offerors shall provide explanations for all instances of failures to meet dollar or percentage goals in individual subcontracting plans.
Notes:
The Government reserves the right to consider achievements information on other recent, relevant projects from all available sources.
Offerors utilizing achievements information of team members or key subcontractors shall clearly demonstrate how these companies will have meaningful involvement in the management of the subcontracting program for this acquisition. If not, such achievement information will not beconsidered under this factor. If the offeror is a new joint venture, partnership or other entity consisting of more than one company, provide achievements information for each individual business entity(ies) that will be responsible for managing the subcontracting program and clearly describe those responsibilities.
Failure to provide ISRs or any other requested information must be fully explained and may negatively impact your evaluation.
Offerors will be evaluated on the extent to which their proposals and other performance information available to the Government demonstrate a history of successfully supporting Government policies concerning utilization of small business concerns as subcontractors including, when applicable, achievements against established small business subcontracting plan goals. Offerors will also be evaluated on the levels of small business participation proposed and the degree of commitment to use named sources. The anticipated benefits of proposed initiatives and tools to enhance small business participation and capabilities will be considered. The Government will assess proposal realism and the likelihood of success in achieving the small business objectives of this acquisition.
4.B – SMALL BUSINESS PARTICIPATION AND COMMITMENT
All offerors shall submit a small business participation and commitment strategy including all data elements shown in Attachment H, Small Business Participation and Commitment Strategy.
a. Identify in terms of dollar value and percentage of the total acquisition the extent of work the offeror will self-perform as the prime contractor. If submitting an offer as a joint venture, identify the percentage of work each member will be responsible for and indicate the size status of each member (e.g. small business, woman-owned small business, other than small business).
b. Include supplemental narratives (limited to five pages) to address other elements of the offeror’s strategy such as binding agreements covering post award roles for execution of the contract and specific initiatives and tools that will be employed under the contract to enhance small businesses opportunities to both participate in this acquisition and build capabilities to support future NAVFAC acquisitions.
c. The anticipated prime and first tier overall small business participation rate for this acquisition (i.e. work to be performed by small businesses as the prime and/or subcontractors) is 20% of the contract value. Offerors are encouraged to exceed this percentage and seek meaningful levels of participation in each of the small business socioeconomic programs listed in Attachment H consistent with efficient contract performance. Offerors shall explain in their participation and commitment strategies how proposed participation rates were established. The small business participation and commitment strategy must be in agreement with any required small business subcontracting plan and will be made a part of the contract upon award.
Material discrepancies between the small business participation and commitment strategy and small business subcontracting plan (if required) may negatively impact your evaluation under this factor.
Offerors will be evaluated on the extent to which their proposals and other performance information available to the Government demonstrate a history of successfully supporting Government policies concerning utilization of small business concerns as subcontractors including, when applicable, achievements against established small business subcontracting plan goals. Offerors will also be evaluated on the levels of small business participation proposed and the degree of commitment to use named sources. The anticipated benefits of proposed initiatives and tools to enhance small business participation and capabilities will be considered. The Government will assess proposal realism and the likelihood of success in achieving the small business objectives of this acquisition.
Forms to be used for offeror submission of Small Business Utilization Factor information are:
Attachment G – Small Business Subcontracting Record Attachment H – Small Business Participation and Commitment Strategy
CLAUSES INCORPORATED BY REFERENCE
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-6 Unique Entity Identifier OCT 2016 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.209-7002 Disclosure Of Ownership Or Control By A Foreign
Government
JUN 2010
252.236-7008 Contract Prices-Bidding Schedules DEC 1991
CLAUSES INCORPORATED BY FULL TEXT
52.204-3 TAXPAYER IDENTIFICATION (OCT 1998)
(a) Definitions.
Common parent, as used in this provision, means that corporate entity that owns or controls an affiliated group of corporations that files its Federal income tax returns on a consolidated basis, and of which the offeror is a member.
Taxpayer Identification Number (TIN), as used in this provision, means the number required by the Internal Revenue Service (IRS) to be used by the offeror in reporting income tax and other returns. The TIN may be either a Social Security Number or an Employer Identification Number.
(b) All offerors must submit the information required in paragraphs (d) through (f) of this provision to comply with debt collection requirements of 31 U.S.C. 7701(c) and 3325(d), reporting requirements of 26 U.S.C. 6041, 6041A, and 6050M, and implementing regulations issued by the IRS. If the resulting contract is subject to the payment reporting requirements described in Federal Acquisition Regulation (FAR) 4.904, the failure or refusal by the offeror to furnish the information may result in a 31 percent reduction of payments otherwise due under the contract.
(c) The TIN may be used by the Government to collect and report on any delinquent amounts arising out of the offeror's relationship with the Government (31 U.S.C. 7701(c)(3)). If the resulting contract is subject to the payment reporting requirements described in FAR 4.904, the TIN provided hereunder may be matched with IRS records to verify the accuracy of the offeror's TIN.
(d) Taxpayer Identification Number (TIN).
___ TIN:.--------------------------------------------------------
___ TIN has been applied for.
___ TIN is not required because:
___ Offeror is a nonresident alien, foreign corporation, or foreign partnership that does not have income effectively connected with the conduct of a trade or business in the United States and does not have an office or place of business or a fiscal paying agent in the United States;
___ Offeror is an agency or instrumentality of a foreign government;
___ Offeror is an agency or instrumentality of the Federal Government.
(e) Type of organization.
___ Sole proprietorship;
___ Partnership;
___ Corporate entity (not tax-exempt);
___ Corporate entity (tax-exempt);
___ Government entity (Federal, State, or local);
___ Foreign government;
___ International organization per 26 CFR 1.6049-4;
___ Other--------------------------------------------------------
(f) Common parent.
___ Offeror is not owned or controlled by a common parent as defined in paragraph (a) of this provision.
___ Name and TIN of common parent:
Name-------------------------------------------------------------------
TIN--------------------------------------------------------------------
(End of provision)
52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2016)
(a) Definitions. As used in this provision--
Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
Registered in the System for Award Management (SAM) database means that--
(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into the SAM database;
(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in the SAM database;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record ``Active''.
Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b)(1) By submission of an offer, the Offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in the SAM database.
(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:
(1) Company legal business name.
(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(3) Company physical street address, city, state, and Zip Code.
(4) Company mailing address, city, state and Zip Code (if separate from physical).
(5) Company telephone number.
(6) Date the company was started.
(7) Number of employees at your location.
(8) Chief executive officer/key manager.
(9) Line of business (industry).
(10) Company headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) Offerors may obtain information on registration at https://www.acquisition.gov.
(End of clause)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a FIRM FIXED PRICE contract resulting from this solicitation.
52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS
CONCERNS (OCT 2014)
(a) Definitions. See 13 CFR 125.6(e) for definitions of terms used in paragraph (d).
(b) Evaluation preference. (1) Offers will be evaluated by adding a factor of 10 percent to the price of all offers, except--
(i) Offers from HUBZone small business concerns that have not waived the evaluation preference; and
(ii) Otherwise successful offers from small business concerns.
(2) The factor of 10 percent shall be applied on a line item basis or to any group of items on which award may be made. Other evaluation factors described in the solicitation shall be applied before application of the factor.
(3) When the two highest rated offerors are a HUBZone small business concern and a large business, and the evaluated offer of the HUBZone small business concern is equal to the evaluated offer of the large business after considering the price evaluation preference, award will be made to the HUBZone small business concern.
(c) Waiver of evaluation preference. A HUBZone small business concern may elect to waive the evaluation preference, in which case the factor will be added to its offer for evaluation purposes. The agreements in paragraphs
(d) and (e) of this clause do not apply if the offeror has waived the evaluation preference.
___ Offeror elects to waive the evaluation preference.
(d) Agreement. A HUBZone small business concern agrees that in the performance of the contract, in the case of a contract for
(1) Services (except construction), at least 50 percent of the cost of personnel for contract performance will be spent for employees of the concern or employees of other HUBZone small business concerns;
(2) Supplies (other than procurement from a nonmanufacturer of such supplies), at least 50 percent of the cost of manufacturing, excluding the cost of materials, will be performed by the concern or other HUBZone small business concerns;
(3) General construction. (i) At least 15 percent of the cost of contract performance to be incurred for personnel will be spent on the prime contractor's employees;
(ii) At least 50 percent of the cost of the contract performance to be incurred for personnel will be spent on the prime contractor's employees or on a combination of the prime contractor's employees and employees of HUBZone small business concern subcontractors;
(iii) No more than 50 percent of the cost of contract performance to be incurred for personnel will be subcontracted to concerns that are not HUBZone small business concerns; or
(4) Construction by special trade contractors. (i) At least 25 percent of the cost of contract performance to be incurred for personnel will be…