14-Q-4816_Revised_SOW_Paragraph.pdf

PDF 28 KB Posted

Attached to
Install Water and Septic Tanks, McMullen Range Federal contract opportunity
Solicitation number
N69450-14-Q-4816
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This is a revised paragraph of the Statement of Work to provide clarification on the requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Install Water and Septic Tanks, McMullen Range, newest first.
File Type Posted
14-M-4816_RFI_1.pdf PDF
14Q4816_SOW.pdf PDF
14Q4816_Photos.pdf PDF
Color_Coded_Pass_Aplication _6-24-2011.pdf PDF
14Q4816_WDs.pdf PDF
14Q4816_RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The contractor shall remove the existing non-potable water tank and pump. The contractor shall provide and install a new 1,500 GL vertical capacity storage tank. The contractor shall provide and install a new Jet pump. The contractor shall place the jet pump on the concrete pad as close as possible to the wall leaving enough space to allow for servicing. The contractor shall install new PVC piping, fittings, valves, gauges, and all other equipment needed to establish a working non-potable water supply system. The contractor shall insulate the exterior pipes with exterior insulation and cover with an aluminum jacket. The contractor shall install a NEMA 3 non-fused lockable disconnect on the exterior of the BLDG 3028 in accordance to NEC. The contractor shall refer to Part 2 Photo for location of the water tank. All electrical connections shall be water tight. The contractor shall provide and install a new 750 GL reinforced concrete septic tank, including leach field. The contractor shall provide a detailed drawing of the new septic tank. The drawing will need to include 2 two-way clean outs. The contractor shall use schedule 80 PVC from BLDG 3028 to the septic tank. Flood Plain Development permit must be obtained from the McMullen County . The contractor shall refer to Part 1 and 2 of the on-site Sewage Facility Soil Evaluation report. The contractor shall refer to Part 3 Photo for the septic tank location.

File details come from the government source that posted it. Updated .