14-M-4816_RFI_1.pdf
PDF 15 KB Posted
- Attached to
- Install Water and Septic Tanks, McMullen Range Federal contract opportunity
- Solicitation number
- N69450-14-Q-4816
About this file
RFI 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 14-Q-4816_Revised_SOW_Paragraph.pdf | ||
| 14Q4816_SOW.pdf | ||
| 14Q4816_Photos.pdf | ||
| 14Q4816_RFQ.pdf | ||
| Color_Coded_Pass_Aplication _6-24-2011.pdf | ||
| 14Q4816_WDs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NUMBER:
14-Q-4816
REQUEST FOR INFORMATION RFI NUMBER:
CONTRACT TITLE:
Install Water and Septic Tanks, Freer, TX
PRIME CONTRACTOR:
SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
Fill lines
DRAWING(S):
DETAIL(S):
SPECIFICATION:
CPM ACTIVITY NUMBER:
COST EFFECT: INCREASE: DECREASE: NONE:
INFORMATION REQUESTED & RECOMMENDED SOLUTION:
Does septic tank require any fill lines to lay?
Date Response Required By: Date: 12/12 Signature:
From:
To: Field Office Code
RECOMMENDATION:
Date: Signature:
From: Field Office To: Prime Contractor
REPLY:
Per paragraph 4 of SOW, The contractor shall use schedule 80 PVC from BLDG 3028 to the septic tank. To clarify, all new piping shall be installed.
Date: 12/12 Signature: LT Overson
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a changed condition, written notice to the Contracting Officer is required within 20 calendar days.
DISTRIBUTION: Original to File via REICC PL/DM ET A/E PC # via AROICC/CONTRACT OFFICER
File details come from the government source that posted it. Updated .