21R0041 Amendment 2.docx
DOCX document 29 KB Posted
- Attached to
- MAC PCB Follow On Federal contract opportunity
- Solicitation number
- N6893621R0041
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 21R0041 Amendment 3.docx | DOCX document | |
| 21R0041 Amendment 1.docx | DOCX document | |
| Attachment_2_-_Past_Performance_Matrix.docx | DOCX document | |
| New Mac PCB.docx | DOCX document | |
| Attachment_1_-_Minimum_Requirements_Matrix.docx | DOCX document | |
| MAC PCB CDRL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6893621R0041
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RESPONSE TO INDUSTRY QUESTIONS
MAC PCB Follow-on: Request for Information (RFI) Responses
Q: ESSM Low Voltage - The Gerbers include a file labeled “BAD-ESSMLowVoltage.zip” which are an old rev that should not be included.
A: Please disregard the “BAD-ESSMLowVoltage.zip” file. This is an old revision.
Q: ESSM Low Voltage - The BOM has 2 lists: one for High Voltage and one for Low Voltage.
A: Please refer only to the Low Voltage section of the BOM.
Q: Fiber Mezzanine - No BOM included for the parts that go on the board.
A: The BOM is missing from files. Please see attached file labeled “FIBER_MEZZANINE1.bom”
Q: Hud Handle - It says the files should be Rev F, but the file in the Gerbers shows Rev E.
A: The files and gerbers should both be Rev F, not Rev E. Please refer to the attached gerber data “HUDHANDLE_REV_F_FAB.zip”, which is the latest version of this board.
Q: Hud Handle - GDO file, GPF file and .dsn file are unsupported file types.
A.These files require specific software to open, and all contractors should be able to read this file. If you right click the files and open with Notepad, you can see the contents of the files, but in order to see the graphics you have to open it with a gerber or CAM software such as GC-Prevue.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 25-Oct-2021 03:00 PM to 10-Nov-2021 03:00 PM.
(End of Summary of Changes) image1.wmf
File details come from the government source that posted it. Updated .