Attachment_2_-_Past_Performance_Matrix.docx
DOCX document 13 KB Posted
- Attached to
- MAC PCB Follow On Federal contract opportunity
- Solicitation number
- N6893621R0041
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 21R0041 Amendment 3.docx | DOCX document | |
| 21R0041 Amendment 1.docx | DOCX document | |
| 21R0041 Amendment 2.docx | DOCX document | |
| MAC PCB CDRL.pdf | ||
| Attachment_1_-_Minimum_Requirements_Matrix.docx | DOCX document | |
| New Mac PCB.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
PAST PERFORMANCE MATRIX
INSTRUCTIONS FOR COMPLETION
(1) Under the heading of “References,” list for each reference the Government Activity/Company Name, Address, CAGE Code, Point of Contact with Telephone number and Contract number.
(2) Under the heading of “$ Value,” provide the value of the contract.. For example: If the contract was for $7,500,000, list the value as 7.5M. If the contract was for $350,000, list the value as 350K.
(3) Under the heading of “Work Description,” provide a brief description of the work and types of printed circuit boards manufactured.
(4) Under the heading of “CCT” which is the abbreviation for Contract Completed on Time, insert “Y” for “Yes” if the contract was completed on time. Insert “N” for “No” if the contract was not completed on time. If inserted an “N” then provide a brief explanation under heading of “Explanation for N Answers.”
(5) Under the heading of “CCC” which is the abbreviation for Contract Completed at cost, insert “Y” for “Yes” if the contract was completed at cost. Insert “N” for “No” if the contract was not completed at cost. If inserted an “N” that provide a brief explanation under heading of “Explanation for N Answers.”
(6) Under the heading of “Explanation for N Answers” provide explanation of any “N’s” under CCT or CCC. If there were no “N’s”, then leave this column blank.
(7) The instructions page may be removed from the Attachment when being completed.
PAST PERFORMANCE MATRIX
| References |
| $ Value |
| Work Description |
| CCT |
| CCC |
| Explanation for N Answers |
File details come from the government source that posted it. Updated .