Solicitation_14-R-0114.pdf

PDF 691 KB Posted

Attached to
BQM-74E Aft Section Repairs
Solicitation number
N6893614R0114
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
14-R-0114_Amd_0004_RFP.pdf PDF
14-R-0114_Amd_0003_RFP.pdf PDF
Solicitation_Amendment.pdf PDF
14-R-0114-0001.pdf PDF
Proposal_Price_Worksheet.xls XLS spreadsheet
Proposal_Adequacy_Checklist.rtf RTF text file
NAVAIR_01-1A-1 _Ch.3.pdf PDF
QASP.doc DOC document
CPARS_Questionnaire.doc DOC document
Past_Performance_Questionnaire.doc DOC document
CDRLS.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 10:00 AM local time 28 Jul 2014

X

A X B X C X D

EX

X

G F 43 - 46

47 - 52 X H 53 - 56 jennifer.barneby@navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 56

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N68936 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

See Section L-1 conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

JENNIFER J. BARNEBY (805) 989-7355

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 3 4 - 5

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

6 - 9 10 - 11

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

13 - 16 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 17 - 20 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 21 - 25 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

26 - 41

PART II - CONTRACT CLAUSES

CDR NAWCWD CODE 254300E

ATTN: J. BARNEBY

(805) 989-7355

575 "I" AVE SUITE 1, BLDG 65

POINT MUGU CA 93042

(805) 989-7355

(805) 989-1613FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

1XXXXXXXX

5. DATE ISSUED

27 Jun 2014

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N68936-14-R-0114

Section A - Solicitation/Contract Form

INSTRUCTIONS TO OFFERORS

Obtaining Drawings and Specifications:

Offerors interested in submitting proposals for this solicitation shall contact Jennifer Barneby, Contract Specialist in writing at jennifer.barneby@navy.mil and adrienne.hickle@navy.mil, to request Attachments 1 and 2.

Submission of Questions Questions regarding this solicitation shall be submitted to Jennifer Barneby, Contract Specialist, jennifer.barneby@navy.mil no later than ten (10) days after posting of this solicitation.

Proposal Submission Proposals for this Request for Proposal (RFP) shall be submitted concurrently to the following individuals:

Jennifer Barneby Susan McKenzie Contract Specialist Contract Specialist jennifer.barneby@navy.mil susan.mckenzie@navy.mil

CLAUSES INCORPORATED BY FULL TEXT

FOR YOUR INFORMATION:

The following addresses and points of contact are provided:

Name: Jennifer Barneby Phone: (805) 989-7355

DSN: 351-7355

FAX: (805) 989-1613

Email address: jennifer.barneby@navy.mil

U.S Postal Service Mailing Address:

COMMANDER

CODE 230000E (J. BARNEBY - 805-989-7355)

NAVAIRWARCENWPNDIV

575 "I" AVE SUITE 1, BLDG 65

POINT MUGU, CA 93042-5049

Direct Delivery Address (UPS, FedEx, etc):

COMMANDER

CODE 230000E (J. BARNEBY)

NAVAIRWARCENWPNDIV

BLDG 65, RM 1-MAILROOM

POINT MUGU, CA 93042-5049

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 1 Each BQM-74E Aft Section Repair -1st Unit

FFP

Contractor shall provide repairs services to one BQM-74E aerial target in accordance with the Performance Work Statement, see Section C.

FOB: Destination

PURCHASE REQUEST NUMBER: 1XXXXXXXX

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0002 36 Each BQM-74E Aft Section Repair

FFP

Contractor shall provide repairs services to BQM-74E aerial targets in accordance with the Performance Work Statement, see Section C. Work on units under this CLIN shall not commence until the repair under CLIN 0001 is complete and accepted by the Government.

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES AMOUNT

0003 Contract Data Requirements List

NSP

Contract Data Requirements List (CDRL) in accordance with DD Form 1423, see Exhibit A.

Section C - Descriptions and Specifications

PREAMBLE

CLIN 0001: The contractor shall provide repair services to one BQM-74E Aft Section in accordance with the Performance Work Statement, see Section C.

CLIN 0002: The contractor shall provide repair services to BQM-74E Aft Sections in accordance with the Performance Work Statement, see Section C. Work for CLIN 0002 shall not commence until services under CLIN 0001 are complete and accepted by the Government.

CLIN 0003: The contractor shall provide data in accordance with the Contract Data Requirements Lists (CDRLS) DD Form 1423, see Exhibit A.

REQUIRED ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING

APPLICATION (ECMRA) INFORMATION

The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the BQM-73E Aft Section Repairs via a secure data collection site.

Contracted services, excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:

(1) W, Lease/Rental of Equipment;

(2) X, Lease/Rental of Facilities;

(3) Y, Construction of Structures and Facilities;

(4) S, Utilities ONLY;

(5) V, Freight and Shipping ONLY.

The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.

PERFORMANCE WORK STATEMENT

BQM-34/74 Integrated Product Team (IPT)

BQM-74E Aft Section Repair Services 24 June2014

1.0 BACKGROUND AND SCOPE

1.1 Background

The Naval Air Warfare Center (NAWCWD) BQM-34/BQM-74 IPT has a requirement to repair BQM-74E Aft Sections. The BQM-74E Aerial Target is a recoverable, remote controlled, subsonic aerial target, capable of speeds up to Mach 0.86 and altitudes from 7.0 to 40,000 feet. The BQM-74E is currently operated by the following Navy operating facilities: Point Mugu, CA; Damneck, VA; White Beach, Okinawa; and Pacific Missile Range Facility, Kauai, Hawaii.

1.2 Scope.

The contract is for repair services for multiple BQM-74E Target Aft Sections currently in the US Navy inventory.

These repairs are summarized below:

Complete disassembly of the Aft Section individual components when required for repair Make repairs to the various Aft Section components Reassembly of Aft Section components Ensure Aft Section proper alignment using the GFE alignment fixture Repaint the Aft Section with approved BQM-74E paint or equivalent Re-label the Aft Section with approved markings

Repairs under this contract will correct damage incurred during operational recoveries. The scope of the contract will be limited to the BQM-74E Aft Section repair.

Individual task orders will have specific scope statements for that order depending on the nature of the repairs required under that order.

2.0 APPLICABLE DOCUMENTS

2.1 The following applicable documents can be found at the website address provided or as an attachment to this SOW:

2.1.1 Drawings.

Drawings for the BQM-74E Aft Section to be provided by the Government. See Attachment 1 for complete drawing list.

2.1.2 Specifications.

DOCUMENT # TITLE DATE REQUIRED/GUIDANCE AVAILABILITY

12-32-00, Class B Aft Section

Specification 15 October 2000 Required Attachment 2

2.1.3 Manuals

DOCUMENT # TITLE DATE REQUIRED/GUIDANCE AVAILABILITY

NAVAIR 01-1A-1,

Ch. 3

General Manual for Structural Repair

15 September

Required Attachment 3

3.0 REQUIREMENTS

3.1 First Repair Unit (CLIN 0001)

3.1.1 The contractor shall perform repair services on one BQM-74E Aft Section, as specified in an individual order, for testing by the Government. The first repair unit shall meet the performance requirements of the Applicable Documents listed in Section 2.0. A Certificate of Conformity (C of C) shall be provided by the contractor for the first repair unit. The contractor will perform an Oil Tank leak test on the first repair unit prior to C of C final sign off. (CDRLS A001 and A002)

3.1.2 The Government will perform inspection of the first repaired BQM-74E Aft Section. Inspection of the first repair unit will include verification of conformance with the Government alignment fixture by the Government.

3.2 Repairs (CLIN 0002)

3.2.1 The contractor shall furnish all parts, components, materials, documentation and necessary services for the repair of BQM-74E Aft Sections, as specified in individual orders. Repair services shall return non-operational equipment to its original performance specification.

3.2.2 The Government will ship damaged BQM-74E Aft Sections in need of repair to the contractor.

3.2.3 The contractor will ensure that all applicable documents listed in Section 2.0 are followed where parts need to be reformed or hardware needs to be acquired (rivets, screws, etc.)

3.2.4 The contractor will supply a C of C for every completed Aft Section repair. The contractor will perform an Oil Tank leak test on each Aft Section prior to C of C final sign off. (CDRLS A001 and A002)

3.2.4.1 The Government will review every CDRL and inspect each delivered BQM-74E Aft Section in accordance with the drawings and workmanship.

3.2.5 The contractor shall report monthly on the following items: repair status of units, scheduling, issues, status of billings and funds received against the contract including both progress and final acceptance payments. (CDRL A003)

3.2.6 Repaired Aft Sections shall be returned to the Government with shipping costs as Freight on Board (F.O.B.)

Destination. The contractor shall meet all packaging and marking requirements included within the contract Section F.

4.0 QUALITY ASSURANCE

4.1 The contractor shall establish and manage a quality control plan to ensure all work meets the requirements of AS9100, ISO 9001, or an equivalent quality system model with prior Government approval. The quality control plan shall address material and parts selection, process control, workmanship, inspection and configuration management. (CDRL A004)

The Government reserves the right to inspect at the source those supplies or services not manufactured or performed within the contractor's facility. The purpose of this inspection is to assist the Government Representative at the contractor's facility to determine the conformance of supplies or services with contract requirements. Government inspection at a subcontractor’s facility shall not constitute acceptance; nor shall it in any way replace contractor inspection or otherwise relieve the contractor of responsibility to furnish an acceptable end item. When inspection at subcontractors' plants is performed by the Government, such inspection shall not be used by the contractor as evidence of effective inspection.

4.2 A Quality Assurance Surveillance Plan (QASP) will be used by the Government to evaluate contractor performance on a periodic basis. An informational copy of the QASP is provided as Attachment 5.

5.0 PLACE OF PERFORMANCE

5.1 The place of performance is the contractor’s facility.

6.0 DATA DELIVERABLES (CLIN 0003)

6.1 The contractor shall deliver the following documents in accordance with the attached DD Form 1423, Contract Data Requirements List (CDRL):

CDRL TITLE

A001 Technical Report-Study/Services: Certificate of Conformance A002 Test/Inspection Report: Oil Tank Leak Test A003 Contractor’s Progress, Status and Management Report A004 Quality Program Plan: Quality Control Plan

Section D - Packaging and Marking

CLINs 0001 & 0002: BQM-74E Aft Sections returned to the Government after completion of repair services shall be packaged and marked in accordance with Clause 5252.247-9509.

CLIN 0003: Packaging and marking of data shall be in accordance with Contract Data Requirements List (CDRL) DD Form 1423, see Exhibit A, and Clause 5252.247-9507.

CLAUSES INCORPORATED BY REFERENCE

252.246-7000 Material Inspection And Receiving Report MAR 2008

5252.246-9517 CONSTRUCTIVE ACCEPTANCE PERIOD (NAVAIR) (MAR 1999)

For the purpose of FAR Clause 52.232-25, “Prompt Payment”, paragraph (a)(5)(i), Government acceptance shall be deemed to have occurred constructively on the 30TH day after the contractor delivered the supplies or performed the services.

5252.247-9507 PACKAGING AND MARKING OF REPORTS (NAVAIR) (OCT 2005)

(a) All unclassified data shall be prepared for shipment in accordance with best commercial practice. Classified reports, data and documentation, if any, shall be prepared for shipment in accordance with the National Industry Security Program Operating Manual, DoD 5220.22-M.

(b) The contractor shall prominently display on the cover of each report the following information:

(1) Name and business address of contractor.

(2) Contract Number/Delivery/Task order number.

(3) Contract/Delivery/Task order dollar amount.

(4) Whether the contract was competitively or non-competitively awarded.

(5) Name of sponsoring individual.

(6) Name and address of requiring activity.

5252.247-9508 PROHIBITED PACKING MATERIALS (NAVAIR) (JUN 1998)

The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hydroscopic or non-neutral material) is prohibited. In addition, loose fill polystyrene is prohibited for shipboard use.

5252.247-9509 PRESERVATION, PACKAGING, PACKING AND MARKING (NAVAIR)(JUL 1998)

(a) Preservation, packaging and packing shall conform to prevailing industry standards for the type of commodity purchased under this contract.

(b) All packages will be clearly marked with applicable contract number/delivery order number, and will contain appropriate packing slip. All deliveries will be marked for and/or consigned as follows:

*TO BE DETERMINED AT TASK ORDER LEVEL.

(c) In the event of any discrepancy in material shipped (overage, technical rejection, damage), the contractor shall, immediately upon request of the Contracting Officer, furnish disposition instructions. Normally, such disposition instruction shall be a properly completed Commercial Bill of Lading, which includes, but is not limited to, the mode of shipment, routing, special handling, and so forth.

(d) If the contractor is required to install equipment upon delivery, then the contractor shall inform the Government of the date of shipment from the contractor’s facilities and the anticipated date of arrival at the site.

This report shall be made no later than the actual date that the shipment is made from the contractor’s facilities. The report may be made by facsimile or e-mail, to the point of contact listed in Section G. All transportation, rigging, drayage, packing, unpacking, and handling necessary to accomplish the installation shall be the responsibility of the contractor.

Section E - Inspection and Acceptance

CLINs 0001 & 0002: Initial inspection of BQM-74E Aft Sections repaired under this contract shall be made by the contractor at the contractor’s facility. Final inspection and acceptance shall be made by the Government and shall be evidenced by Government execution of a Material Inspection and Receiving Report, DD Form 250, submitted through the Wide Area Workflow System (WAWF).

CLIN 0003: Destination inspection and acceptance of the data called for hereunder shall be in accordance with Contract Data Requirements List (CDRL) DD Form 1423, see Exhibit A.

52.246-4 Inspection Of Services--Fixed Price AUG 1996 52.246-15 Certificate of Conformance APR 1984

5252.246-9512 INSPECTION AND ACCEPTANCE (NAVAIR) (OCT 2005)

(a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by Code 663200E.

(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements.

5252.246-9514 INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION

(NAVAIR) (FEB 1995)

Inspection and acceptance of technical data and information will be performed by the Procuring Contracting Officer (PCO) or his duly authorized representative. Inspection of technical data and information will be performed by ensuring successful completion of the requirements set forth in the DD Form 1423, Contract Data Requirements List (CDRL) and incorporation/resolution of Government review comments on the data items. Acceptance will be evidenced by execution of an unconditional DD Form 250, Material Inspection and Receiving Report, as appropriate..

Section F - Deliveries or Performance

CLINs 0001 & 0002: Repair services will be ordered by individual Task Order within the ordering period specified within.

CLIN 0003: Data shall be delivered in accordance with Contract Data Requirements List (CDRL) DD Form 1423, see Exhibit A.

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 POP 12-AUG-2014 TO

11-AUG-2019

N/A N/A

0002 POP 12-AUG-2014 TO

11-AUG-2019

0003 POP 12-AUG-2014 TO

11-AUG-2019

52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984

52.211-8 TIME OF DELIVERY (JUN 1997)

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

WITHIN DAYS AFTER

ITEM NO. QUANTITY DATE OF CONTRACT

0001 1 each 45 days after issuance of task order

0002 as specified by task order The contractor shall deliver one unit every 30 days from issuance of the task order

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE

WITHIN DAYS AFTER

ITEM NO. QUANTITY DATE OF CONTRACT

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor’s date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or

(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically.

(The term “working day” excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

52.247-34 F.O.B. DESTINATION (NOV 1991)

(a) The term "f.o.b. destination," as used in this clause, means-

(1) Free of expense to the Government, on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located;

and

(2) Supplies shall be delivered to the destination consignee's wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or "constructive placement" as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including "piggyback") is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for "heavy or bulky freight." When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarded for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery, when required, if transfer to truck is required to complete delivery to consignee.

(b) The Contractor shall- (1)(i) Pack and mark the shipment to comply with contract specifications; or

(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;

(2) Prepare and distribute commercial bills of lading;

(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;

(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;

(5) Furnish a delivery schedule and designate the mode of delivering carrier; and

(6) Pay and bear all charges to the specified point of delivery.

5252.216-9506 MINIMUM AND MAXIMUM QUANTITIES (NAVAIR) (MAR 1999)

As referred to in paragraph (b) of FAR 52.216-22 " Indefinite Quantity" of this contract, the contract minimum quantity is one (1) repair; the maximum quantity is 37 repairs.

5252.245-9508 GOVERNMENT PROPERTY TO BE SERVICED (NAVAIR) (JUL 1998)

(a) Government property or equipment furnished for repair or other service shall be delivered at Government expense F.O.B. at or near contractor’s plant, [To Be Determined at Award]. The contractor shall acknowledge receipt of the Government property or equipment.

(b) The contractor shall complete servicing of Government property or equipment within [To Be Determined at Award] after receipt of the Government property or equipment, or after receipt of an authorization to proceed if one is required by the contract.

(c) Upon completion of servicing of Government property or equipment, the property will be returned to the Government, shipped at contractor expense, etc.

5252.247-9505 TECHNICAL DATA AND INFORMATION (NAVAIR) (FEB 1995)

Technical Data and Information shall be delivered in accordance with the requirements of the Contract Data Requirements List, DD Form 1423, Exhibit A, attached hereto, and the following:

(a) The contractor shall concurrently deliver technical data and information per DD Form 1423, Blocks 12 and 13 (date of first/subsequent submission) to all activities listed in Block 14 of the DD Form 1423 (distribution and addresses) for each item. Complete addresses for the abbreviations in Block 14 are shown in paragraph (g) below.

Additionally, the technical data shall be delivered to the following cognizant codes, who are listed in Block 6 of the DD Form 1423.

(1) PCO, Code 254300E

(2) ACO, Code TBD at time of award

(b) Partial delivery of data is not acceptable unless specifically authorized on the DD Form 1423, or unless approved in writing by the PCO.

(c) The Government review period provided on the DD Form 1423 for each item commences upon receipt of all required data by the technical activity designated in Block 6.

(d) A copy of all other correspondence addressed to the Contracting Officer relating to data item requirements (i.e., status of delivery) shall also be provided to the codes reflected above and the technical activity responsible for the data item per Block 6, if not one of the activities listed above.

(e) The PCO reserves the right to issue unilateral modifications to change the destination codes and addresses for all technical data and information at no additional cost to the Government.

(f) Unless otherwise specified in writing, rejected data items shall be resubmitted within thirty (30) days after receipt of notice of rejection.

(g) DD Form 1423, Block 14 Mailing Addresses:

Code 254300E: TBD Code 663200E: TBD

Section G - Contract Administration Data

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. as used in this clause-- "Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

______To Be Determined at Contract Award__________________________________________ (Contracting Officer: Insert applicable document type(s). Note: If a "Combo" document type is identified but not supportable by the Contractor's business systems, an "Invoice" (stand-alone) and "Receiving Report" (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

______To Be Determined at Contract Award__________________________________________ (Contracting Officer: Insert inspection and acceptance locations or "Not applicable.")

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC: To Be Determined at Contract Award Issue By DoDAAC: To Be Determined at Contract Award Admin DoDAAC: To Be Determined at Contract Award Inspect By DoDAAC: To Be Determined at Contract Award Ship To Code: To Be Determined at Contract Award Ship From Code: To Be Determined at Contract Award Mark For Code: To Be Determined at Contract Award Service Approver (DoDAAC): To Be Determined at Contract Award Service Acceptor (DoDAAC): To Be Determined at Contract Award Accept at Other DoDAAC: To Be Determined at Contract Award

LPO DoDAAC: To Be Determined at Contract Award DCAA Auditor DoDAAC: To Be Determined at Contract Award Other DoDAAC(s): To Be Determined at Contract Award (*Contracting Officer: Insert applicable DoDAAC information or "See schedule" if multiple ship to/acceptance locations apply, or "Not applicable.")

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send Additional Email Notifications" field of WAWF once a document is submitted in the system.

(Contracting Officer: Insert applicable email addresses or "Not applicable.")

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact. For Navy WAWF questions call DFAS Customer Care 1- 800-756-4571 option 6

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

5252.201-9501 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE (COR)(NAVAIR)

(SEP 2012)

(a) The Contracting Officer has designated [TBD at Contract Award] as the authorized Contracting Officer’s Representative (COR) to perform the following functions, duties, and/or responsibilities:.[TBD at Contract Award]

(b) The effective period of the COR designation is the period of performance of the contract.

5252.201-9502 CONTRACTOR’S AUTHORIZED CONTRACT COORDINATOR AND TECHNICAL

LIAISON (NAVAIR)(OCT 2005)

(a) The contractor shall state below the name and telephone numbers of the contractor’s employees responsible for coordination of contract functions/liaison with the Contracting Officer and/or Contract administrator, and providing technical assistance as required regarding product specifications, functionality, etc.

CONTRACT COORDINATOR:

NAME: _______________________________________

PHONE (BUS): ___________________________________

PHONE (AFTER HOURS): _________________________

ALTERNATE:

NAME: _______________________________________

PHONE (BUS): ___________________________________

PHONE (AFTER HOURS): _________________________

(b) The contractor shall notify the Contracting Officer and/or Contract Administrator in advance, in writing, of any changes in the above listed personnel.

5252.232-9511 NOTICE OF REQUIREMENTS FOR PROMPT PAYMENT (NAVAIR) (MAR 2006)

The Government anticipates that this contract will be distributed to Defense Finance and Accounting Service (DFAS) by the DOD Electronic Document Access (EDA) system. DFAS is responsible for payment of contractor invoices.

(a) In accordance with FAR Clause 52.232-33 "Payment By Electronic Funds Transfer--Central Contractor Registration", the contractor is responsible for providing updated information to the Central Contractor Register (CCR) database. Additionally, the contractor is responsible for maintaining its active status in the CCR database.

(b) If the DUNS, CAGE code, TIN or address set forth in the contract do not match the information in the CCR, then DFAS will return invoices without payment. Therefore, it is imperative that the contractor ensure the DUNS, CAGE code, TIN and contractor address on the contract are accurate and in compliance with the CCR database.

Additionally, any changes/updates made to the CCR database should be communicated to the Contracting Officer for the purpose of modifying the contract to reflect the new data.

5252.232-9528 REIMBURSEMENT OF COSTS ASSOCIATED WITH OPNAV SERVICES

(NAVAIR)(JUN 2012)

This procurement does not contain the requirement to support the Office of the Chief of Naval Operations (OPNAV). No such requirement is included in the Statement of Work nor shall be contained in any flow down requirements to subcontractors. Since OPNAV service support is not a requirement of the statement of work, the Contracting Officer's Representative (COR) is prohibited from endorsing any such costs/charges. The Government will not pay for such costs as they are outside the scope of this contract.

5252.242-9511 CONTRACT ADMINISTRATION DATA (NAVAIR)(SEP 2012)

(a) Contract Administration Office.

(1) Contract administration functions (see FAR 42.302(a) and DFARS 242.302(a)) are assigned to: See the ADMINISTERED BY Block on the face page of the contract, modification, or order.

(b) Special Instructions (see FAR 42.202(b) and (c)):

(1) The following contract administration functions are retained (see FAR 42.302(a) and DFARS 242.302(a)):

Functions Retained Retained for Performance By:

FAR 42.302(a)(27) PCO FAR 42.302(a)(38-40) PCO

(2) The following additional contract administration functions are assigned (see FAR 42.302(b)):

Additional Functions Retained for Performance By:

FAR 42.302(b)(1-3) PCO FAR 42.302(b)(5-11) PCO

(c) Inquiries regarding payment should be referred to: MyInvoice at https://myinvoice.csd.disa.mil//index.html.

5252.242-9513 FUNDING TO BE PROVIDED ON TASK ORDERS (NAVAIR) (OCT 2005)

All funding for this contract will be provided on the individual task orders. Task order 0001 issued concurrent to award of this contract meets the Government’s minimum requirement.

Section H - Special Contract Requirements

5252.210-9501 AVAILABILITY OF UNIQUE DATA ITEM DESCRIPTIONS (UDIDs) AND DATA ITEM

DESCRIPTIONS (DIDs) (NAVAIR) (AUG 2013) Access Procedures for Acquisition Management System and Data Requirements Control List (AMSDL), DoD 5010.12-L, and DIDs listed therein. The AMSDL and all DIDs and UDIDs listed therein are available online via the Acquisition Streamlining and Standardization Information System located at https://assist.dla.mil/online/start/. To access these documents, select the Quick Search link on the site home page.

5252.211-9502 GOVERNMENT INSTALLATION WORK SCHEDULE (NAVAIR)(OCT 2005) - ALT I

(OCT 2005)

(a) The Holidays applicable to this contract are: New Year’s Day, Martin Luther King’s Birthday, President’s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, and Christmas Day.

(b) In the event that the contractor is prevented from performance as the result of an Executive Order or an administrative leave determination that applies to the using activity, such time may be charged to the contract as a direct cost provided such charges are consistent with the contractor’s accounting practices. In the event that any of the above holidays occur on a Saturday or Sunday, or Compressed Work Schedule Alternate Friday, then such holiday shall be observed as they are by the assigned Government employees at the using activity.

(c) The Naval Air Warfare Center Weapons Division works a compressed work schedule. Therefore alternate Fridays are not a part of the normal workweek for work performed on-site at a Naval Air Warfare Center Weapons Division site. The majority of the Government offices are closed on alternate Fridays.

(d) No deviation in the normal workweek will be permitted without express advance approval by the designated Contracting Officer with coordination of the using departments.

5252.211- 9510 CONTRACTOR EMPLOYEES (NAVAIR)(MAY 2011)

(a) In all situations where contractor personnel status is not obvious, all contractor personnel are required to identify themselves to avoid creating an impression to the public, agency officials, or Congress that such contractor personnel are Government officials. This can occur during meeting attendance, through written (letter or email) correspondence or verbal discussions (in person or telephonic), when making presentations, or in other situations where their contractor status is not obvious to third parties. This list is not exhaustive. Therefore, the contractor employee(s) shall:

(1) Not by word or deed give the impression or appearance of being a Government employee;

(2) Wear appropriate badges visible above the waist that identify them as contractor employees when in Government spaces, at a Government-sponsored event, or an event outside normal work spaces in support of the contract/order;

(3) Clearly identify themselves as contractor employees in telephone conversations and in all formal and informal written and electronic correspondence. Identification shall include the name of the company for whom they work;

(4) Identify themselves by name, their company name, if they are a subcontractor the name of the prime contractor their company is supporting, as well as the Government office they are supporting when participating in meetings, conferences, and other interactions in which all parties are not in daily contact with the individual contractor employee; and

(5) Be able to provide, when asked, the full number of the contract/order under which they are performing, and the name of the Contracting Officer’s Representative.

(b) If wearing a badge is a risk to safety and/or security, then an alternative means of identification maybe utilized if endorsed by the Contracting Officer’s Representative and approved by the Contracting Officer.

(c) The Contracting Officer will make final determination of compliance with regulations with regard to proper identification of contractor employees.

5252.216-9512 PAPERLESS CONTRACTING (NAVAIR) (JUN 2009)

(a) Orders and requests for proposals are hereby authorized to be issued by facsimile or by electronic commerce (including e-mail and paperless methods of delivery). Nothing in this contract should be read to prohibit these types of orders. In the event of a conflict with any other provision of this contract, this clause shall govern.

(b) To the extent the terms “ written” , “ mailed” , or “ physically delivered” appear in other provisions of this contract, these terms are hereby defined to explicitly include electronic commerce, email, or paperless delivery methods.

5252.216-9534 TASK ORDER PROCEDURES (NAVAIR) (OCT 2005)

(a) The following activity (ies) or individual(s) is/are designated as Ordering Officer(s):

Code 254300E.

The above activity (ies) or individual(s) is/are responsible for issuing and administering any orders placed hereunder. Ordering Officers may negotiate revisions/modifications to orders, but only within the scope of this contract. Ordering Officers have no authority to modify any provision of this basic contract. Any deviation from the terms of the basic contract must be submitted to the Procuring Contracting Officer (PCO) for contractual action.

Ordering Officers may enter into mutual no cost cancellations of orders under this contract and may reduce the scope of orders/tasks, but a Termination for Convenience or Termination for Default may only be issued by the

PCO.

(b) Task orders. All orders issued hereunder are subject to the terms and conditions of this contract. The contract shall control in the event of conflict with any order. When mailed, an order shall be “issued” for purposes of this contract at the time the Government deposits the order in the mail, or, if transmitted by other means, when physically delivered to the contractor.

(c) A task order shall be issued for each order. In addition to any other data that may be called for in the contract, the following information shall be specified in each order, as applicable:

(1) Date of order.

(2) Contract and task order number.

(3) Applicable contract line item number (CLIN).

(4) Description of the task to be performed.

(5) Description of the end item or service.

(6) DD Form 254 (Contract Security Classification).

(7) DD Form 1423 (Contract Data Requirements List).

(8) Exact place of performance.

(9) The inspecting and accepting codes.

(10) Estimated cost and fee and level of effort by labor category (and billing rate if known).

(11) List of Government furnished property and the estimated value of the property.

(12) Invoice and payment provisions to the extent not covered by the contract.

(13) Accounting and appropriation data.

(14) Period of performance.

(15) Organizational Conflict of Interest provisions.

(16) Type of order (e.g., completion, term, FFP)

(d) Negotiated Agreement. For task orders with an estimated value of greater than $100,000.00, the information contained in each task order with respect to labor categories, man-hours and delivery date shall be the result of a negotiated agreement reached by the parties in advance of issuance of the order.

(1) The Ordering Officer shall furnish the contractor with a written preliminary task order and request for proposal. The request shall include:

(i) a description of the specified work required,

(ii) the desired delivery schedule,

(iii) the place and manner of inspection and acceptance, and

(2) The contractor shall, within the time specified by the preliminary task order, provide the Ordering Officer with a proposal to perform, which shall include:

(i) the required number of labor hours by labor classification and scheduled billing rates, for each end product or task,

(ii) overtime hours by labor category,

(iii) proposed completion or delivery dates,

(iv) other direct costs (i.e., direct material, travel subsistence, and similar costs)

(v) dollar amount and type of any proposed subcontracts, and

(vi) total estimated cost/price.

The cost factors utilized in determining the estimated cost/price under any order shall be the rates applicable at time the order is issued.

(3) Upon receipt of the proposal, the Ordering Officer shall review the estimates therein to ensure acceptability to the Government, enter into such discussions with the contractor as may be necessary to correct and revise any discrepancies in the proposal, and effect whatever internal review procedures are required. Should the Ordering Officer and contractor be unable to reach agreement as to the terms of the order prior to its issuance, the conflict shall be referred to the Contracting Officer.

(4) For task orders under the dollar amount indicated in paragraph (d), the procedures for reaching agreement are as follows:

(i) The Ordering Officer shall issue a fully funded, unilaterally executed task order representing a firm order for the total requirement.

(ii) In the event the contractor cannot perform in accordance with the terms and conditions and within the estimated cost of the task order, he shall:

(A) notify the Ordering Officer immediately,

(B) submit a proposal for the work requested in the task order,

(C) not commence performance until such time that differences between the task order and the contractor’s proposal are resolved and a modification, if necessary, is issued.

(e) Total Estimated Dollar Amount. The total estimated dollar amount of each order constitutes a ceiling price for that order. The requirements for notification set forth in Federal Acquisition Regulation paragraphs (b) and (c) of FAR Clause 52.232-20, Limitation of Cost are applicable to individual task orders. The ceiling amount for each order may not be exceeded unless authorized by a modification to the order. All revisions providing additional funds to a task order will include fee in the same manner as established in the basic task order.

(f) Oral Orders. Oral orders may be placed hereunder only in emergency circumstances. Information described above shall be furnished to the contractor at the time of placing an oral order and shall be confirmed by issuance of a written task order within 30 working days of the oral order.

(g) Modifications. Modifications to orders shall be issued using a Standard Form 30 and shall include the information set forth in paragraph (c) above, as applicable. Orders may be modified orally by the Ordering Officer in emergency circumstances. (Oral modifications shall be confirmed by issuance of a written modification on Standard Form 30 within 30 working days from the time of the oral communication amending the order.)

5252.216-9540 ISSUANCE OF ORDERS USING STREAMLINED PROCEDURES (NAVAIR) (NOV 2003)

(a) Unless the procedures in paragraphs (b) and (c) are utilized orders will be issued under this contract using the following streamlined procedures:

(1) For each proposed order, the contracting officer will provide the contractor with a statement of work (SOW) and an independent Government cost estimate (IGCE).

(2) Within three (3) working days of receipt of the SOW and IGCE, the contractor will respond with a confirmation letter agreeing to perform the SOW within the IGCE. If the requirement remains valid and the contracting officer determines the IGCE to represent a fair and reasonable price, a fully negotiated, priced order will be issued to the contractor.

(3) If the contractor does not agree with the SOW and/or IGCE, a proposal will be submitted to the contracting officer within five (5) working days of receipt of the SOW and IGCE, addressing only the specific areas of differences. Once the differences are resolved between the contracting officer and the contractor, and the contracting officer determines that the price is fair and reasonable, a fully negotiated, priced order will be issued to the contractor.

(b) There may be occasions when the Government determines, in circumstances of emergency or exigency, that the need for specific supplies or services is unusually urgent. On such occasions, the Ordering Officer may issue an order based solely on the Government estimate, requiring the contractor to provide the supplies or services specified without having an opportunity to review the Government estimate before the order is issued. This type of order shall be a unilaterally unpriced order.

(1) The unilaterally unpriced order shall specify the estimated cost and fee and the desired delivery schedule for the work being ordered. The Government’s desired delivery shall apply unless the Ordering Officer receives written notification from the Contractor within fifteen (15) days after receipt of the order that the proposed delivery schedule is not acceptable. Such notification shall propose an alternative delivery schedule. The Contractor shall either provide written acceptance of the order or submit its cost proposal within thirty (30) days after receipt of the order.

(2) The Government has no obligation to pay for the supplies or services ordered until the actual price and delivery schedule have been negotiated. In no event shall the costs incurred exceed the estimated cost of the order.

(3) The contractor shall include in its proposal a statement of costs incurred and an estimate of costs expected to complete the work. Data supporting the accuracy and reliability of the cost estimate should also be included. After submission of the contractor’s cost proposal and supporting data, the contractor and the Ordering Officer shall negotiate a bilateral modification to the original order finalizing the price and delivery schedule.

(4) Should the Ordering Officer and the contractor be unable to reach an agreement as to the terms of the order, the conflict shall be referred to the Contracting Officer who shall issue such direction as is required by the circumstances. If a bilateral agreement is not negotiated within sixty (60) days after submission of the contractor’s cost proposal, the Contracting Officer will issue a modification to the unilaterally unpriced order that establishes the Government’s total estimated cost for the order. This price will remain in effect unless the contractor requests to negotiate the price by submission of a proposal.

(5) Failure to arrive at an agreement shall be considered a dispute in accordance with the clause entitled “Disputes”.

(c) For orders under $100,000, the procedures for reaching agreement are as follows:

(1) The Ordering Officer shall issue a fully funded, unilaterally executed order representing a firm order for the total requirement.

(2) In the event the contractor cannot perform in accordance with the terms and conditions and within the estimated cost of the order, the contractor shall:

(i) notify the Ordering Officer with in three working days

(ii) submit a proposal for the work requested in the order,

(iii) not commence performance until such time that the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .