14-R-0114-0001.pdf
PDF 94 KB Posted
- Attached to
- BQM-74E Aft Section Repairs
- Solicitation number
- N6893614R0114
About this file
RFP/RFQ Amendment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 14-R-0114_Amd_0004_RFP.pdf | ||
| 14-R-0114_Amd_0003_RFP.pdf | ||
| Solicitation_Amendment.pdf | ||
| Proposal_Price_Worksheet.xls | XLS spreadsheet | |
| Proposal_Adequacy_Checklist.rtf | RTF text file | |
| NAVAIR_01-1A-1 _Ch.3.pdf | ||
| QASP.doc | DOC document | |
| Solicitation_14-R-0114.pdf | ||
| CPARS_Questionnaire.doc | DOC document | |
| Past_Performance_Questionnaire.doc | DOC document | |
| CDRLS.doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1XXXXXXXXX
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this ammendment is to correct the date on Document Number 12-32-00, Class B found in section 2.1.2 of the PWS from 15 October 2000 to 13 December 1989.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Jul-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N68936-14-R-0114
X 9B. DATED (SEE ITEM 11)
27-Jun-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Jul-2014
CODE
CDR NAWCWD CODE 254300D
ATTN: D. DOUD
(805) 989-8054
575 "I" AVE SUITE 1, BLDG 65
POINT MUGU CA 93042-5049
N68936 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N68936-14-R-0114
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
PERFORMANCE WORK STATEMENT
BQM-34/74 Integrated Product Team (IPT) BQM-74E Aft Section Repair Services
24 June2014
1.0 BACKGROUND AND SCOPE
1.1 Background
The Naval Air Warfare Center (NAWCWD) BQM-34/BQM-74 IPT has a requirement to repair BQM-74E Aft Sections. The BQM-74E Aerial Target is a recoverable, remote controlled, subsonic aerial target, capable of speeds up to Mach 0.86 and altitudes from 7.0 to 40,000 feet. The BQM-74E is currently operated by the following Navy operating facilities: Point Mugu, CA; Damneck, VA; White Beach, Okinawa; and Pacific Missile Range Facility, Kauai, Hawaii.
1.2 Scope.
The contract is for repair services for multiple BQM-74E Target Aft Sections currently in the US Navy inventory.
These repairs are summarized below:
Complete disassembly of the Aft Section individual components when required for repair Make repairs to the various Aft Section components Reassembly of Aft Section components Ensure Aft Section proper alignment using the GFE alignment fixture Repaint the Aft Section with approved BQM-74E paint or equivalent Re-label the Aft Section with approved markings
Repairs under this contract will correct damage incurred during operational recoveries. The scope of the contract will be limited to the BQM-74E Aft Section repair.
Individual task orders will have specific scope statements for that order depending on the nature of the repairs required under that order.
2.0 APPLICABLE DOCUMENTS
2.1 The following applicable documents can be found at the website address provided or as an attachment to this SOW:
2.1.1 Drawings.
Drawings for the BQM-74E Aft Section to be provided by the Government. See Attachment 1 for complete drawing list.
2.1.2 Specifications.
DOCUMENT # TITLE DATE REQUIRED/GUIDANCE AVAILABILITY
12-32-00, Class B Aft Section
Specification 13 December
Required Attachment 2
2.1.3 Manuals
DOCUMENT # TITLE DATE REQUIRED/GUIDANCE AVAILABILITY
NAVAIR 01-1A-1,
Ch. 3
General Manual for Structural Repair
15 September
Required Attachment 3
3.0 REQUIREMENTS
3.1 First Repair Unit (CLIN 0001)
3.1.1 The contractor shall perform repair services on one BQM-74E Aft Section, as specified in an individual order, for testing by the Government. The first repair unit shall meet the performance requirements of the Applicable Documents listed in Section 2.0. A Certificate of Conformity (C of C) shall be provided by the contractor for the first repair unit. The contractor will perform an Oil Tank leak test on the first repair unit prior to C of C final sign off. (CDRLS A001 and A002)
3.1.2 The Government will perform inspection of the first repaired BQM-74E Aft Section. Inspection of the first repair unit will include verification of conformance with the Government alignment fixture by the Government.
3.2 Repairs (CLIN 0002)
3.2.1 The contractor shall furnish all parts, components, materials, documentation and necessary services for the repair of BQM-74E Aft Sections, as specified in individual orders. Repair services shall return non-operational equipment to its original performance specification.
3.2.2 The Government will ship damaged BQM-74E Aft Sections in need of repair to the contractor.
3.2.3 The contractor will ensure that all applicable documents listed in Section 2.0 are followed where parts need to be reformed or hardware needs to be acquired (rivets, screws, etc.)
3.2.4 The contractor will supply a C of C for every completed Aft Section repair. The contractor will perform an Oil Tank leak test on each Aft Section prior to C of C final sign off. (CDRLS A001 and A002)
3.2.4.1 The Government will review every CDRL and inspect each delivered BQM-74E Aft Section in accordance with the drawings and workmanship.
3.2.5 The contractor shall report monthly on the following items: repair status of units, scheduling, issues, status of billings and funds received against the contract including both progress and final acceptance payments. (CDRL A003)
3.2.6 Repaired Aft Sections shall be returned to the Government with shipping costs as Freight on Board (F.O.B.)
Destination. The contractor shall meet all packaging and marking requirements included within the contract Section F.
4.0 QUALITY ASSURANCE
4.1 The contractor shall establish and manage a quality control plan to ensure all work meets the requirements of AS9100, ISO 9001, or an equivalent quality system model with prior Government approval. The quality control plan shall address material and parts selection, process control, workmanship, inspection and configuration management. (CDRL A004)
The Government reserves the right to inspect at the source those supplies or services not manufactured or performed within the contractor's facility. The purpose of this inspection is to assist the Government Representative at the contractor's facility to determine the conformance of supplies or services with contract requirements. Government inspection at a subcontractor’s facility shall not constitute acceptance; nor shall it in any way replace contractor inspection or otherwise relieve the contractor of responsibility to furnish an acceptable end item. When inspection at subcontractors' plants is performed by the Government, such inspection shall not be used by the contractor as evidence of effective inspection.
4.2 A Quality Assurance Surveillance Plan (QASP) will be used by the Government to evaluate contractor performance on a periodic basis. An informational copy of the QASP is provided as Attachment 5.
5.0 PLACE OF PERFORMANCE
5.1 The place of performance is the contractor’s facility.
6.0 DATA DELIVERABLES (CLIN 0003)
6.1 The contractor shall deliver the following documents in accordance with the attached DD Form 1423, Contract Data Requirements List (CDRL):
CDRL TITLE
A001 Technical Report-Study/Services: Certificate of Conformance A002 Test/Inspection Report: Oil Tank Leak Test A003 Contractor’s Progress, Status and Management Report A004 Quality Program Plan: Quality Control Plan
(End of Summary of Changes)