IQA Test Stand_DRAFT CDRLs.pdf
PDF 606 KB Posted
- Attached to
- V-22 PropRotor Gearbox (PRGB) Input Quill Assemblies (IQA) Federal contract opportunity
- Solicitation number
- N6852024R0041
About this file
This document is a Contract Data Requirements List (CDRL) related to a federal contract opportunity for a V-22 Prop Rotor Input Quill Assembly Test Stand. The CDRL details the required deliverables, including a Test Equipment Plan of Action and Milestones, Site Preparation Requirements and Installation Plan, Test Equipment System Drawings, Maintenance Manual, Operator's Manual, Software Administrator Manual, Lockout/Tagout Procedures, Calibration and Measurements Requirements Summary, Calibration Procedures, Acceptance Test Plan, Training Materials, and Hardware/Software Miscellaneous items. The CDRL specifies the frequency, due dates, and distribution requirements for each deliverable. The related federal contract opportunity is for a test stand capable of testing both left-hand and right-hand V-22 PropRotor Gearbox Input Quill Assemblies, to be located at Fleet Readiness Center East in Cherry Point, North Carolina. The contract opportunity includes a site visit on August 13, 2024 and requires interested businesses to submit capability statements by August 13, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Solicitation Conference_20240813.pptx | PPTX presentation | |
| QA_IQA Test Stand Pre Solicitation Conference_Site Visit.docx | DOCX document | |
| DRAFT N6852024R0041.pdf | ||
| Required Information on Company Letter Head 03272024.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
0000 A TDP TM OTHER R&D
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
V-22 Prop Rotor Input Quill Assembly Test Stand
N68520-24-R-0041 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
3. SUBTITLES
A001
TEST EQUIPMENT PLAN OF ACTION AND
MILESTONES (POA&M)
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
OT-24-20054 STATEMENT OF WORK/ PARAGRAPH
3.22.1.
FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
7. DD 250
REQ 9. DIST
STATEMENT
REQUIRED
10.
FREQUENCY
12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX SEE BLK
MTHLY SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C (SEE BLK 16)
11. AS OF
DATE
13. DATE OF SUBSEQUENT
SUBMISSION Dr aft
Final
? SEE BLK 16 SEE BLK 16 Reg Repr o
16. REMARKS FRCE ACQ 1
BLOCK 7 – Project Lead email via FRCE Acq, if changes occur. If changes impact delivery date, PCO negotiated modification required.
BLOCK 9 – DISTRIBUTION C. DISTRIBUTION AUTHORIZED TO U.S.
GOVERNMENT AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR
THIS DOCUMENT SHALL BE REFERRED TO COMMANDING OFFICER, FLEET
READINESS CENTER EAST, CHERRY POINT, NC 28533
BLOCK 10 - In addition, Contractor to update and resubmit POA&M whenever unforeseen events or significant changes occur that would impact schedule.
BLOCK 11 –Due during the first full business week of each month.
BLOCK 12 – Proposed POAM attached at contract award.
BLOCK 13 – Monthly or whenever unforeseen events or significant changes occur that would impact schedule.
FRCE ACQ : edwin.t.ghee.civ@us.navy.mil frce_acq_team.fct@navy.mil
0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Edwin Ghee Procurement Analyst Fleet Readiness Center East
Form Approved OMB No. 0704-0188
The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
0000 A TDP TM OTHER R&D
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
V-22 Prop Rotor Input Quill Assembly Test Stand
N68520-24-R-0041 TBD
A002
Site Preparation Requirements and Installation Plan
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80033A
STATEMENT OF WORK/ PARAGRAPH
3.22.2.
FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
7. DD 250
REQ 9. DIST
STATEMENT
REQUIRED
10.
FREQUENCY
12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX SEE BLK
R/ASR SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C (SEE BLK 16)
11. AS OF
DATE
13. DATE OF SUBSEQUENT
SUBMISSION Dr aft
Final
? SEE BLK 16 SEE BLK 16 Reg Repr o
16. REMARKS FRCE ACQ 1 3
BLOCK 7 – Project Lead email via FRCE Acq, if changes occur. If changes impact delivery date, PCO negotiated modification required.
BLOCK 8 –Government has 10 days after each official Review to provide comment. Official Reviews: Post Award Review (PAR), Preliminary Design Review (PDR), Critical Design Review (CDR). Submit revisions within 10 days of receipt of Government comments.
BLOCK 9 – DISTRIBUTION C. DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT
AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT
SHALL BE REFERRED TO COMMANDING OFFICER, FLEET READINESS CENTER
EAST, CHERRY POINT, NC 28533
BLOCK 10 – 20% complete preliminary submittal due 5 days prior to Post Award Review (PAR).
80% complete submittal due 10 days prior to Preliminary Design Review (PDR). Final submittal (100% Complete) due at Critical Design Review (CDR).
BLOCK 11 – Contractor shall provide 10 days prior to each official Review.
BLOCK 12 –20% complete preliminary submittal due 5 days prior to Post Award Review (PAR).
BLOCK 13 - 10 days prior to each remaining Review. 80% complete submittal due 10 days prior to Preliminary Design Review (PDR). Final Submittal (100% Complete) due at Critical Design Review (CDR).
BLOCK 14 - Three (each), hard bound (hardcover) copies and three compact discs (CD/DVD)
1 3 0
Edwin Ghee
CONTRACT DATA REQUIREMENTS LIST Form Approved
(1 Data Item) OMB No. 0704-0188 The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
0000 A TDP TM OTHER R&D
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
V-22 Prop Rotor Input Quill Assembly Test Stand
N68520-24-R-0041 TBD
A003
Test Equipment System Drawings N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
OT-24-20064 STATEMENT OF WORK/ PARAGRAPH
3.22.3.
FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
7. DD 250
REQ 9. DIST
STATEMENT
REQUIRED
10.
FREQUENCY
12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX SEE BLK
R/ASR SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C (SEE BLK 16)
11. AS OF
DATE
13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
SEE BLK 16 SEE BLK 16 Reg Repr o
16. REMARKS FRCE ACQ 1 3
BLOCK 7 – Project Lead email via FRCE Acq, if changes occur. If changes impact delivery date, PCO negotiated modification required.
BLOCK 8 –Government has 10 days after each official Review to provide comment. Official Reviews: Preliminary Design Review (PDR), Critical Design Review (CDR), Test Readiness Review (TRR), Post Acceptance Review (PAR). Submit revisions within 10 days of receipt of Government comments.
BLOCK 9 – DISTRIBUTION C. DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT
AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT
SHALL BE REFERRED TO COMMANDING OFFICER, FLEET READINESS CENTER
EAST, CHERRY POINT, NC 28533
BLOCK 10 – 20% complete preliminary submittal due 10 days prior to Preliminary Design Review (PDR). 80% complete submittal due 10 days prior to Critical Design Review (CDR).
99% complete submittal due 10 days prior to Test Readiness Review (TRR). Final 100% submittal due 10 days prior to Post Acceptance Review (PAR).
BLOCK 11 – Contractor shall provide 10 days prior to each official Review.
BLOCK 12 –20% complete preliminary submittal due 10 days prior to Preliminary Design Review (PDR).
BLOCK 13 - 10 days prior to each remaining Review. 80% complete submittal due 10 days prior to Critical Design Review (CDR). 99% complete submittal due 10 days prior to Test Readiness Review (TRR). Final 100% submittal due 10 days prior to Post Acceptance Review (PAR).
BLOCK 14 - Three (each), hard bound (hardcover) copies and three compact discs (CD/DVD)
Edwin Ghee
CONTRACT DATA REQUIREMENTS LIST Form Approved
(1 Data Item) OMB No. 0704-0188 The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
0000 A TDP TM OTHER R&D
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
V-22 Prop Rotor Input Quill Assembly Test Stand
N68520-24-R-0041 TBD
3. SUBTITLE
A004
Test Equipment Maintenance Manual N/A
No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
OT-24-20065
STATEMENT OF WORK/ PARAGRAPH
3.22.4.
FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
7. DD 250 REQ 9. DIST
STATEMENT
REQUIRED
10.
FREQUENCY
12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX SEE BLK
R/ASR SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C (SEE BLK 16)
11. AS OF
DATE
13. DATE OF SUBSEQUENT
SUBMISSION Dr aft
Final
SEE BLK 16 SEE BLK 16 Reg Repr o
16. REMARKS FRCE ACQ 1 3
BLOCK 7 – Project Lead email via FRCE Acq, if changes occur. If changes impact delivery date, PCO negotiated modification required.
BLOCK 8 –Government has 10 days after each official Review to provide comment. Official Reviews: Preliminary Design Review (PDR), Critical Design Review (CDR), Final Acceptance Testing (FAT), Post Acceptance Review (PAR). Submit revisions within 10 days of receipt of Government comments.
BLOCK 9 – DISTRIBUTION C. DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT
AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT
SHALL BE REFERRED TO COMMANDING OFFICER, FLEET READINESS CENTER
EAST, CHERRY POINT, NC 28533
BLOCK 10 – 20% complete preliminary submittal due 10 days prior to Preliminary Design Review (PDR). 80% complete submittal due 10 days prior to Critical Design Review (CDR).
99% complete submittal due 10 days prior to Final Acceptance Testing (FAT). Final 100% submittal due 10 days prior to Post Acceptance Review (PAR).
BLOCK 11 – Contractor shall provide 10 days prior to each official Review.
BLOCK 12 –20% complete preliminary submittal due 10 days prior to Preliminary Design Review (PDR).
BLOCK 13 - 10 days prior to each remaining Review. 80% complete submittal due 10 days prior to Critical Design Review (CDR). 99% complete submittal due 10 days prior to Final Acceptance Testing (FAT). Final 100% submittal due 10 days prior to Post Acceptance Review (PAR).
Edwin Ghee
Form Approved OMB No. 0704-0188
The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
0000 A TDP TM OTHER R&D
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
V-22 Prop Rotor Input Quill Assembly Test Stand
N68520-24-R-0041 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A005
TEST EQUIPMENT OPERATOR USER’S MANUAL
N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
OT-24-20062
STATEMENT OF WORK/ PARAGRAPH
3.22.5.
FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
7. DD 250 REQ 9. DIST
STATEMENT
REQUIRED
10.
FREQUENCY
12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX SEE BLK
R/ASR SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF
DATE
13. DATE OF SUBSEQUENT
SUBMISSION Dr aft
Final
SEE BLK 16 SEE BLK 16 Reg Repr o
16. REMARKS FRCE ACQ 1 3
BLOCK 7 – Project Lead email via FRCE Acq, if changes occur. If changes impact delivery date, PCO negotiated modification required.
BLOCK 8 –Government has 10 days after each official Review to provide comment. Official Reviews: Preliminary Design Review (PDR), Critical Design Review (CDR), Test Readiness Review (TRR), Post Acceptance Review (PAR). Submit revisions within 10 days of receipt of Government comments.
BLOCK 9 – DISTRIBUTION C. DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT
AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT
SHALL BE REFERRED TO COMMANDING OFFICER, FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
BLOCK 10 – 20% complete preliminary submittal due 10 days prior to Preliminary Design Review (PDR). Incremental submittal due 10 days prior to Critical Design Review (CDR). 80% complete submittal due 10 days prior to Test Readiness Review (TRR). Final 100% submittal due 10 days prior to Post Acceptance Review (PAR).
BLOCK 11 – Contractor shall provide 10 days prior to each official Review.
BLOCK 12 –20% complete preliminary submittal due 10 days prior to Preliminary Design Review
(PDR).
BLOCK 13 - 10 days prior to each remaining Review. Incremental submittal due 10 days prior to Critical Design Review (CDR). 80% complete submittal due 10 days prior to Test Readiness Review (TRR). Final 100% submittal due 10 days prior to Post Acceptance Review (PAR).
BLOCK 14 - Three (each), hard bound (hardcover) copies and three compact discs (CD/DVD)
Edwin Ghee
Form Approved OMB No. 0704-0188
The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
0000 A TDP TM OTHER R&D
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
V-22 Prop Rotor Input Quill Assembly Test Stand
N68520-24-R-0041 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A006
TEST EQUIPMENT SOFTWARE ADMINISTRATOR
MANUAL
OT-24-20063
STATEMENT OF WORK/ PARAGRAPH
3.22.6.
FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
7. DD 250 REQ 9. DIST
STATEMENT
REQUIRED
10.
FREQUENCY
12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX SEE BLK
R/ASR SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C (SEE BLK 16)
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION Dra ft
Final
SEE BLK 16 SEE BLK 16 Reg Repr
16. REMARKS
FRCE ACQ 1 3
BLOCK 7 – Project Lead email via FRCE Acq, if changes occur. If changes impact delivery date, PCO negotiated modification required.
BLOCK 8 –Government has 10 days after each official Review to provide comment. Official Reviews: Preliminary Design Review (PDR), Critical Design Review (CDR), Test Readiness Review (TRR), Post Acceptance Review (PAR). Submit revisions within 10 days of receipt of Government comments.
BLOCK 9 – DISTRIBUTION C. DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT
AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT
SHALL BE REFERRED TO COMMANDING OFFICER, FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
BLOCK 10 – 20% complete preliminary submittal due 10 days prior to Preliminary Design Review (PDR). Incremental submittal due 10 days prior to Critical Design Review (CDR). 80% complete submittal due 10 days prior to Test Readiness Review (TRR). Final 100% submittal due 10 days prior to Post Acceptance Review (PAR).
BLOCK 11 – Contractor shall provide 10 days prior to each official Review.
BLOCK 12 –20% complete preliminary submittal due 10 days prior to Preliminary Design Review
(PDR).
BLOCK 13 - 10 days prior to each remaining Review. Incremental submittal due 10 days prior to Critical Design Review (CDR). 80% complete submittal due 10 days prior to Test Readiness Review (TRR). Final 100% submittal due 10 days prior to Post Acceptance Review (PAR).
BLOCK 14 - Three (each), hard bound (hardcover) copies and three compact discs (CD/DVD)
PREPARED BY H. DATE I. APPROVED BY J. DATE
Edwin Ghee
Form Approved OMB No. 0704-0188
The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
0000 A TDP TM OTHER R&D
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
V-22 Prop Rotor Input Quill Assembly Test Stand
N68520-24-R-0041 TBD
A007
TEST EQUIPMENT LOCKOUT/TAGOUT
PROCEDURES
OT-24-20061
STATEMENT OF WORK/ PARAGRAPH
3.22.7.
FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
7. DD 250 REQ 9. DIST
STATEMENT
REQUIRED
10.
FREQUENCY
12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX SEE BLK
R/ASR SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C (SEE BLK 16)
11. AS OF
DATE
13. DATE OF SUBSEQUENT
SUBMISSION Dr aft
Final
SEE BLK 16 SEE BLK 16 Reg Repr
FRCE ACQ 1 3
PCO negotiated modification required.
BLOCK 8 –Government has 10 days after each official Review to provide comment. Official Reviews: Preliminary Design Review (PDR), Critical Design Review (CDR), Test Readiness Review (TRR), Post Acceptance Review (PAR). Submit revisions within 10 days of receipt of Government comments.
BLOCK 9 – DISTRIBUTION C. DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT
AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT
SHALL BE REFERRED TO COMMANDING OFFICER, FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
BLOCK 10 – 20% complete preliminary submittal due 10 days prior to Preliminary Design Review (PDR). Incremental submittal due 10 days prior to Critical Design Review (CDR). 80% complete submittal due 10 days prior to Test Readiness Review (TRR). Final 100% submittal due 10 days prior to Post Acceptance Review (PAR).
BLOCK 11 – Contractor shall provide 10 days prior to each official Review.
BLOCK 12 –20% complete preliminary submittal due 10 days prior to Preliminary Design Review
(PDR).
BLOCK 13 - 10 days prior to each remaining Review. Incremental submittal due 10 days prior to Critical Design Review (CDR). 80% complete submittal due 10 days prior to Test Readiness Review (TRR). Final 100% submittal due 10 days prior to Post Acceptance Review (PAR).
BLOCK 14 - Three (each), hard bound (hardcover) copies and three compact discs (CD/DVD)
Edwin Ghee
Form Approved OMB No. 0704-0188
The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
0000 A TDP TM OTHER R&D
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
V-22 Prop Rotor Input Quill Assembly Test Stand
A008
CALIBRATION AND MEASUREMENTS
REQUIREMENTS SUMMARY (CMRS)
No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-80278C
STATEMENT OF WORK/ PARAGRAPH
3.22.8.
FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
7. DD 250 REQ 9. DIST
STATEMENT
REQUIRED
10.
FREQUENCY
12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX SEE BLK
R/ASR SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C (SEE BLK 16)
11. AS OF
DATE
13. DATE OF SUBSEQUENT
SUBMISSION Dr aft
Final
SEE BLK 16 N/A Reg Repr o
16. REMARKS FRCE ACQ 3
BLOCK 7 – Project Lead email via FRCE Acq, if changes occur. If changes impact delivery date, PCO negotiated modification required.
BLOCK 8 –Government has 10 days after official Review to provide comment. Official Review:
Preliminary Design Review (PDR). Submit revisions within 10 days of receipt of Government comments.
BLOCK 9 – DISTRIBUTION C. DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT
AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT
SHALL BE REFERRED TO COMMANDING OFFICER, FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
BLOCK 10 –100% complete submittal due 10 days prior to Preliminary Design Review (PDR).
BLOCK 11 – Contractor shall provide 10 days prior to official Review.
BLOCK 12 – Due 10 days prior to Preliminary Design Review (PDR).
BLOCK 14 - Three (each), hard bound (hardcover) copies and three compact discs (CD/DVD)
3 0
Form Approved OMB No. 0704-0188
The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
0000 A TDP TM OTHER R&D
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
V-22 Prop Rotor Input Quill Assembly Test Stand
A009
TEST EQUIPMENT CALIBRATION PROCEDURES
OT-24-20060
STATEMENT OF WORK/ PARAGRAPH
3.22.9.
FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
7. DD 250 REQ 9. DIST
STATEMENT
REQUIRED
10.
FREQUENCY
12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX SEE BLK
R/ASR SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C (SEE BLK 16)
11. AS OF
DATE
13. DATE OF SUBSEQUENT
SUBMISSION Dr aft
Final
SEE BLK 16 SEE BLK 16 Reg Repr o
16. REMARKS FRCE ACQ 1 3
BLOCK 7 – Project Lead email via FRCE Acq, if changes occur. If changes impact delivery date, PCO negotiated modification required.
BLOCK 8 –Government has 10 days after each official Review to provide comment. Official Reviews: Preliminary Design Review (PDR), Critical Design Review (CDR), Test Readiness Review (TRR). Submit revisions within 10 days of receipt of Government comments.
BLOCK 9 – DISTRIBUTION C. DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT
AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT
SHALL BE REFERRED TO COMMANDING OFFICER, FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
BLOCK 10 – 20% complete preliminary submittal due 10 days prior to Preliminary Design Review (PDR). 80% complete submittal due 10 days prior to Critical Design Review (CDR). Final submittal (100% Complete) due at Test Readiness Review (TRR).
BLOCK 11 – Contractor shall provide 10 days prior to each official Review.
BLOCK 12 –20% complete preliminary submittal due 10 days prior to Preliminary Design Review
(PDR).
BLOCK 13 - 10 days prior to each remaining Review. 80% complete submittal due 10 days prior to Critical Design Review (CDR). Final submittal (100% Complete) due at Test Readiness Review
(TRR).
BLOCK 14 - Three (each), hard bound (hardcover) copies and three compact discs (CD/DVD)
Form Approved OMB No. 0704-0188
The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
0000 A TDP TM OTHER R&D
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
V-22 Prop Rotor Input Quill Assembly Test Stand
N68520-24-R-0041 TBD
A010
TEST EQUIPMENT ACCEPTANCE TEST PLAN
OT-24-20059
STATEMENT OF WORK/ PARAGRAPH
3.22.10.
FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
7. DD 250 REQ 9. DIST
STATEMENT
REQUIRED
10.
FREQUENCY
12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX SEE BLK
R/ASR SEE BLK 16
a.
ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION Dr aft
Final
SEE BLK 16 SEE BLK 16 Reg Repr o
16. REMARKS FRCE ACQ 1 3
BLOCK 7 – Project Lead email via FRCE Acq, if changes occur. If changes impact delivery date, PCO negotiated modification required.
BLOCK 8 –Government has 10 days after each official Review to provide comment. Official Reviews:
Preliminary Design Review (PDR), Critical Design Review (CDR), Test Readiness Review (TRR). The reviewed and agreed upon document to be signed by the contractor and Government during Final Acceptance Testing (FAT).
BLOCK 9 – DISTRIBUTION C. DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT
AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT SHALL
BE REFERRED TO COMMANDING OFFICER, FLEET READINESS CENTER EAST, CHERRY
POINT, NC 28533
BLOCK 10 – 20% complete preliminary submittal due 10 days prior to Preliminary Design Review (PDR). 80% complete submittal due 10 days prior to Critical Design Review (CDR). Final submittal (100% Complete) due at Test Readiness Review (TRR).
BLOCK 11 – Contractor shall provide 10 days prior to each official Review.
BLOCK 12 –20% complete preliminary submittal due 10 days prior to Preliminary Design Review
(PDR).
BLOCK 13 - 10 days prior to each remaining Review. 80% complete submittal due 10 days prior to Critical Design Review (CDR). Final submittal (100% Complete) due at Test Readiness Review (TRR).
BLOCK 14 - Three (each), hard bound (hardcover) copies and three compact discs (CD/DVD)
Edwin Ghee
Form Approved OMB No. 0704-0188
The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
0000 A TDP TM OTHER R&D
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
V-22 Prop Rotor Input Quill Assembly Test Stand
N68520-24-R-0041 TBD
A011
TEST EQUIPMENT TRAINING MATERIALS
OT-24-20067
STATEMENT OF WORK/ PARAGRAPH
3.22.11.
FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
7. DD 250 REQ 9. DIST
STATEMENT
REQUIRED
10.
FREQUENCY
12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX SEE BLK
R/ASR SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C (SEE BLK 16)
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION Dra ft
Final
SEE BLK 16 SEE BLK 16 Reg Repr o
16. REMARKS FRCE ACQ 1 3
BLOCK 7 – Project Lead email via FRCE Acq, if changes occur. If changes impact delivery date, PCO negotiated modification required.
BLOCK 8 –Government has 10 days after each official Review to provide comment. Official Reviews: Critical Design Review (CDR), Test Readiness Review (TRR), Post Acceptance Review (PAR). Submit revisions within 10 days of receipt of Government comments.
BLOCK 9 – DISTRIBUTION C. DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT
AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT
SHALL BE REFERRED TO COMMANDING OFFICER, FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
BLOCK 10 – 20% complete preliminary submittal due 10 days prior to Critical Design Review (CDR). 80% complete submittal due 10 days prior to Test Readiness Review (TRR). Final 100% submittal due 10 days prior to Post Acceptance Review (PAR).
BLOCK 11 – Contractor shall provide 10 days prior to each official Review.
BLOCK 12 –20% complete preliminary submittal due 10 days prior to Critical Design Review
(CDR).
BLOCK 13 - 10 days prior to each remaining Review. 80% complete submittal due 10 days prior to Test Readiness Review (TRR). Final 100% submittal due 10 days prior to Post Acceptance Review
(PAR).
BLOCK 14 - Three (each), hard bound (hardcover) copies and three compact discs (CD/DVD)
Edwin Ghee
Form Approved OMB No. 0704-0188
The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
0000 A TDP TM OTHER R&D
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
V-22 Prop Rotor Input Quill Assembly Test Stand
N68520-24-R-0041 TBD
A012
TEST EQUIPMENT HARDWARE & SOFTWARE
MISCELLANEOUS
OT-24-20066
STATEMENT OF WORK/ PARAGRAPH
3.23.
FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
7. DD 250 REQ 9. DIST
STATEMENT
REQUIRED
10.
FREQUENCY
12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX SEE BLK
ONCE SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION Dra ft
Final
A SEE BLK 16 N/A Reg Repr
FRCE ACQ 3
PCO negotiated modification required.
BLOCK 8 –Government has 10 days after official Review to provide comment. Official Review: Post Acceptance Review (PAR). Submit revisions within 10 days of receipt of Government comments.
BLOCK 9 – DISTRIBUTION C. DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT
AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT
SHALL BE REFERRED TO COMMANDING OFFICER, FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
BLOCK 10 –100% complete submittal due at to Post Acceptance Review (PAR).
BLOCK 11 – Contractor shall provide 10 days prior to official Review.
BLOCK 12 – Due 10 days prior to Post Acceptance Review (PAR).
0 3 0
Edwin Ghee
Form Approved OMB No. 0704-0188
The public reporting burden for this for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
0000 A TDP TM OTHER R&D
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
V-22 Prop Rotor Input Quill Assembly Test Stand
N68520-24-R-0041 TBD
A013
TEST EQUIPMENT INSPECTION & REPAIR REPORT
OT-24-20068 STATEMENT OF WORK/ PARAGRAPH 6.2.4
FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
7. DD 250 REQ 9. DIST
STATEMENT
REQUIRED
10.
FREQUENCY
12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX SEE BLK
1TIME SEE BLK 16
a.
ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION Dr aft
Final
N/A N/A N/A Reg Repr
16. REMARKS FRCE ACQ 1
BLOCK 9 – DISTRIBUTION C. DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT
AGENCIES AND THEIR CONTRACTORs. OTHER REQUESTS FOR THIS DOCUMENT
SHALL BE REFERRED TO COMMANDING OFFICER, FLEET READINESS CENTER EAST,
CHERRY POINT, NC 28533
BLOCK12 - Report due 30 days after completion of work. Unscheduled Maintenance/Corrective Quote due within 5 days of completion of work.
0 1 0
Edwin Ghee
File details come from the government source that posted it. Updated .