This document is a set of Questions and Answers related to a federal contract opportunity for a Hydraulic Actuator Test Stand (HATS). The key details are:

The solicitation number is N68520, and the contract is for the procurement of one HATS by providing all parts, labor, and materials as specified in the Statement of Work (SOW). The anticipated contract type is a single award contract with Firm Fixed Price CLINs for the products and supporting services, and NSP for the Technical Data CLIN. The anticipated period of performance is 12 months, with 4 option years for repairs. Proposals are due by 12PM EDT on 9 September 2024 and must be submitted via the Procurement Integrated Enterprise Environment (PIEE). The government has provided responses to industry questions related to requirements in the SOW, such as the hydraulic power unit configuration, pressure regulation capabilities, and cylinder limit indicators. Sustainment repair services are to be quoted separately on an as-needed basis.

View the file

Other files for this federal contract opportunity

Other files attached to Hydraulic Actuator Test Stand, newest first.
File Type Posted
HATS RFP Amendment 2.pdf PDF
HATS RFP Amendment 1.pdf PDF
HATS Price Matrix 22 Aug 2024.xlsx XLSX spreadsheet
HATS Questions and Answers 9 Aug.xlsx XLSX spreadsheet
Hydraulic Actuator Test Stand RFP.pdf PDF
HATS Price Matrix 7 Aug 2024.xlsx XLSX spreadsheet
Question Submittal Form.xlsx XLSX spreadsheet
CDRL - Hydraulic Actuator Test Stand (1).pdf PDF
Hydraulic Actuator Test Stand RFP.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 HATS Questions

Question NumberSectionQuestionAnswer
1Section L para 4Section L para 4 states due date is in block 9 of SF 33. SF 33, block 9 states 3 Sep. The SAM listing states proposals are due 9 Sep. Can you please confirm the due date is 9 Sep?The due date is 9 Sep 2024. An amendment to follow before the close of the solicitation.
2Secton F Delivery InformationRFP page 37 of 63 Section F, Delivery Information states 24 months. The SAM listing front page states anticipated PoP is 12 months. Can you please confirm actual delivery is 24 months?SAM.Gov has been updated to reflect the correct delivery date.
3Section L para 3Section L para 3.0 says to submit proposal via email Para 4 says submit via PIEE. Can you please clarify that email is only acceptable if PIEE is down IAW Section L para 4.2?Correct, all submissions must be done via PIEE. Section L will be updated.
1SOW para 4.9“Self-contained Hydraulic Power Unit (HPU)” – Does this mean that the HPU shall be integrated into the main test stand enclosure, or that the HPU can be located remotely from the test stand, but enclosed?HPU shall be integrated into the main test stand enclosure.
2SOW para 4.9“Both analog and digital capability to regulate pressure.” – Do “analog” and “digital” refer to instrumentation to monitor pressure, or to the devices used to regulate (adjust) pressure, or both?Both. This statement refers to the instrumentation both to monitor and to regulate pressue.
3SOW para 4.9“Limit indicator for extension of each UUT” – Can you please clarify expectations for this requirement?Each UUT has a different stroke. We are requesting a limit indicator at each cylinder's full extension to prevent overextending it. It will serve as a visual aid for operators to ensure cylinder does not extend past the visual indicator. If cylinder passes the visual indicator it could potentialy be pulled out of its casing.
4SOW para 7.2Sustainment Repairs, are these services to be provided on an as-needed basis and quoted separately as the need arises?Correct. These services will be quoted seperately and be provided on a FFP CLIN if required durring the service of the contract with PCO authorization.
5SOW 4.9 Table 1is FRCSW using their existing Test Stand to test all of the components listed in Table 1?Yes, current test stand is testing all components listed in Section 4.9, Table 1 in the SOW.