RFP N68335-25-R-0269 Amd 0001 (0411 H53K T408 CMM-TBD).pdf

PDF 371 KB Posted

Attached to
Coordinate Measuring Machines for Depot Level Maintenance on T408 Engine
Solicitation number
N68335-25-R-0269
Issued by

About this file

This is Amendment 0001 to RFP N68335-25-R-0269 issued by the Naval Air Warfare Center Aircraft Division (NAWCAD) in Lakehurst, NJ, effective February 4, 2025. The amendment updates the RFP by removing an inadvertent draft watermark and provides answers to seven contractor questions regarding the procurement of two Moving Bridge Coordinate Measuring Machines (CMMs) for T408 jet engine component measurements.

Key clarifications include: the government will provide GE contact information after award for obtaining part drawings; cybersecurity requirements specify Windows "Operator" common accounts and individual CMM software passwords; acceptance testing will compare dimensional reports between new and existing CMMs; the contractor must develop T406 Rotor and Stator programs; data output requires both standard PC-DMIS reports and direct integration with existing surface/blade tip grinders; and site visits will not be permitted but photographs of the installation space will be provided in a future amendment. The solicitation closing date remains unchanged. The CMMs will be installed at Fleet Readiness Center East (FRCE) in a cleared shop location that will be their final position.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Summary of Changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Feb-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6833525R0269

X 9B. DATED (SEE ITEM 11)

21-Jan-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Feb-2025

CODE

NAVAL AIR WARFARE CENTER AD (LKE)

CODE 2.5.2.3.2 B120-2, HWY 547

LAKEHURST NJ 08733-5082

N68335 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6833525R0269

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

The purpose of this amendment is to answer the following question and to update the attached RFP N68335-25-R- 0269 (the original version inadvertently had the draft watermark on it). The solicitation closing date remains unchanged at this time.

1. Question: SOW 3.8.2 tells us that the contractor shall make arrangements with GE to procure the part drawings and models but doesn’t indicate a contact to get these.

Answer: We can add language that the government will provide contact information after contract award?

2. Question: SOW 3.5.3.3 – Can you expand on what level of cybersecurity system is needed. Is specific user vs administrator login credentials sufficient to cover this requirement?

Answer: Windows “Operator” common account for use by every individual assigned to use the CMM. Individual password accounts required for the CMM software.

3. Question: SOW 4.6.3.1 –What constitutes Pass or Failed testing? Are we comparing results to another machines reports? Please expand on what the Government is looking for here?

Answer: FRCE has a Precision Measurement Center (PMC) in another building. The dimensional report from the new CMM will be compared to the dimensional report from an existing CMM that the Government owns.

4. Question: SOW 3.18.11 – Is the install location in the exact place the new installs are going? What equipment will the contractor need to remove?

Answer: There is a location in the shop where the new CMM’s will be placed during installation. It will be their final location. The area will be cleared by FRCE before installation is started. There should be no obstructions and plenty of room if the CMM’s are sized to fit within the provided allowable footprint.

5. Question: SOW 4.6.3.1 – Is the contractor going to supply programs for the T406 Rotor and Stator or is the Government responsible for programs?

Answer: FRCE does not have a program for these parts. FRCE expects the contractor to develop the programs. If these programs are to be supplied by the Government then the Government can’t adhere to them being part of the acceptance tests.

6. Question: Does the data output need to be in a particular format or are standard PC-DMIS reports sufficient?

Answer: In addition to standard reports, FRCE requires the data to be sent directly to existing surface and blade tip grinders. The existing CMM had that capability at some point in the past. The company that manufactures the grinders can help the CMM supplier with this integration since it is a requirement of both the new CMM’s and new grinders the Government is purchasing.

7. Question: Is it possible to come on-site to see the install location for rigging purposes?

N6833525R0269

Answer: Due to the competitive nature of this requirement, site visit will not be permitted. The Government will provide photographs of the installation space which, along with the facility drawings already provided as a part of the solicitation documents, should be sufficient for an offeror to propose to the rigging specifications. The photographs will be provided at a later date; a subsequent amendment is forthcoming with further details of how to request the photographs.

All other information remains unchanged.

(End of Summary of Changes)