N68335-18-R-0141_(RFP)_Solicitation_Amendment_002.docx

DOCX document 108 KB Posted

Attached to
Mobile Facilities Federal contract opportunity
Solicitation number
N68335-18-R-0141
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

This document is a solicitation for a five-year indefinite delivery/indefinite quantity contract to manufacture and deliver Mobile Facilities in accordance with technical drawings. The Naval Air Warfare Center Aircraft Division intends to award a fixed-price IDIQ contract for production and delivery of up to 560 Mobile Facilities over five years. The initial requirement is for first article testing of six different Mobile Facility types. Offerors are to submit proposals by January 28, 2019 for consideration in accordance with the best value determination outlined in the source selection plan. Pricing must be provided for evaluation using the most likely ordered quantities specified for each contract line item over the five potential ordering years. Proposals must address technical approach, past performance, and price factors as delineated in the instructions.

Solicitation Amendment 002

View the file

Other files for this federal contract opportunity

Other files attached to Mobile Facilities, newest first.
File Type Posted
MF_SOW.doc DOC document
MF_CDRL_L002_RD.pdf PDF
MF_CDRL_L001_RD.pdf PDF
Questions_Solicitation_N68335-18-R-0141.docx DOCX document
N68335-18-R-0141_(RFP)_Solicitation_Amendment.pdf PDF
MF_Logistics_Statement_of_Work.doc DOC document
MF_SOW.doc DOC document
CDRLs.zip ZIP file
MF_SOW_2018_RD.doc DOC document
1339AS_Addenda_October_26_2018.pdf PDF
N68335-18-R-0141_(RFP).docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6833518R0141

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 15-Jan-2019 03:00 PM to 28-Jan-2019 03:30 PM.

The following have been modified:

SECTION A NARRATIVE

Procurement Office Point of Contact (POC) Kalil O’Neal Phone: 732-323-7491 Email: kalil.oneal@navy.mil

Technical Points of Contact Rodney Davis Phone: 732-323-2770 Email: rodney.davis@navy.mil

· Export Control Requirement has been removed from this procurement.

1) This will be a Fixed-Price Indefinite Delivery/ Indefinite Quantity (IDIQ) Contract for the procurement of six (6) First Article Test (FAT) Mobile Facility (MF) units, technical data items, and up to 554 MF Production units in accordance with Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)" dated January 2018; Attachment 2: "Drawing Package 1339AS463 (as identified in the CLINs)"; Attachment 3: “1339AS Addenda,” and Exhibit A "DD Form 1423, Contract Data Requirements List".

2) A Single-Award contract is intended to be issued for this requirement.

3) The guaranteed minimum for this contract is six (6) total FAT MF units (CLINs 0001-0006). However, if First Article Testing is waived in accordance with FAR 52.209-3(h), “First Article Approval- Contractor Testing”, then the guaranteed minimum for this contract is one (1) MF Production Unit, configuration to be determined. The guaranteed minimum will be met upon D.O. 0001 upon award of the basic contract.

4) The maximum quantity that may be ordered under this contract is six (6) FAT MF units and up to 560 MF Production units.

5) Delivery Orders may be placed as follows:

Year 1: CLINs 0001-0006: Delivery Order 0001 will be placed upon award of the basic contract.

Year 1: CLINs 0007-0012 and 0037-0046: May be ordered from the date of contract award through 365 days after Government Release for Production.

Year 2: CLINs 0013-0018 and 0037-0046: May be ordered from the date of contract award through 730 days after Government Release for Production.

Year 3: CLINs 0019-0024 and 0037-0046: May be ordered from the date of contract award through 1,095 days after Government Release for Production.

Year 4: CLINs 0025-0030 and 0037-0046: May be ordered from the date of contract award through 1,460 days after Government Release for Production.

Year 5: CLINs 0031-0036 and 0037-0046: May be ordered from the date of contract award through 1,825 days after Government Release for Production.

6) THE ISSUANCE OF PRODUCTION DELIVERY ORDERS AND RELEASE FOR

PRODUCTION ARE SEPARATE EVENTS. BOTH MUST HAVE OCCURRED BEFORE

PRODUCTION MAY COMMENCE. IN NO CASE WILL RELEASE FOR PRODUCTION

BE GRANTED PRIOR TO SUCCESSFUL COMPLETION OF FIRST ARTICLE TEST (FAT)

UNIT TESTING AND ACCEPTANCE OF THE FAT REPORT (CDRL A003A).

7) UPON APPROVAL, FAT UNITS WILL BE COUNTED AS PRODUCTION UNITS.

8) Proposal validity shall be for 180 days or longer as annotated by the offeror in Block 12 of the cover page of the SF33.

Interested Firms shall submit a written request for a copy of the Specification through Mr. Kalil O’Neal at: kalil.oneal@navy.mil and cc, Mrs. Laurie Jiavaras at: laurie.jiavaras@navy.mil . The written request must include the name of your company, mailing address, phone number, email address, and current CAGE number.

Questions Solicitation N68335-18-R-0141 (Round Two)

1339AS Drawings May 25 2018.PDF is a consolidated listing of the 1339AS drawings and contain drawings for other Mobile Facility types not required for this procurement. See CLINs for the applicable Data Lists for each Mobile Facility type.

1. 5SE00363.pdf-Drawing Title: MODIFICATION PLATE, Rev H. This is missing from the drawing list. The electronic file is provided. Please explain the Government's intent for releasing it with this package.

5SE00363.pdf is not a 1339AS drawing and was not included on 1339AS Drawings May 25 2018.PDF but is included on the applicable Data Lists. Please note that revision H of this drawing was provide and is the revision to be used for this procurement.

2. Inconsistences with REV level between drawing list and actual REV level on drawing

Drawing
Revision Identified on 1339AS Drawings May 25 2018.PDF
Revision Provided
Revision to be used
1339AS1043
B
A
A - AS PROVIDED WITH RFP DRAWING PACKAGE
1339AS1100
A
-
NOT REQUIRED FOR THIS PROCUREMENT
1339AS1137
A
B
B - AS PROVIDED WITH RFP DRAWING PACKAGE
1339AS1326
None
No Revisions
AS PROVIDED WITH RFP DRAWING PACKAGE
1339AS318
E
C
C - AS PROVIDED WITH RFP DRAWING PACKAGE
1339AS390
B
C
NOT REQUIRED FOR THIS PROCUREMENT
1339AS391
B
C
NOT REQUIRED FOR THIS PROCUREMENT
1339AS392
-
A
NOT REQUIRED FOR THIS PROCUREMENT
1339AS947
F
G
G - AS PROVIDED WITH RFP DRAWING PACKAGE

5SE00363.pdf

H
H - AS PROVIDED WITH RFP DRAWING PACKAGE
1339AS926
Sent Via Email
PLEASE SEE PDF OF 1339AS926 REV C

3. The CLINs have been amended to include the Data List, which incorporates the drawing required for each Mobile Facility type. The drawings below are for other Mobile Facility types not required for this procurement.

Drawing
Drawing
Drawing
Drawing
1339AS114
1339AS747
1339AS1262rBs2.xlsx
1339AS746
1339AS449
1339AS748
1339AS715ras1.pdf.PDF
1339AS747
1339AS450
1339AS749
1339AS449
1339AS748
1339AS461
1339AS750
1339AS450
1339AS749
1339AS508
1339AS751
1339AS461
1339AS750
1339AS539
1339AS764
1339AS508
1339AS751
1339AS540
1339AS767
1339AS539
1339AS764
1339AS541
1339AS771
1339AS540
1339AS767
1339AS552
1339AS772
1339AS541
1339AS771
1339AS553
1339AS773
1339AS552
1339AS772
1339AS554
1339AS788
1339AS553
1339AS773
1339AS555
1339AS789
1339AS554
1339AS788
1339AS596
1339AS822
1339AS555
1339AS789
1339AS627
1339AS833
1339AS596
1339AS822
1339AS641
1339AS839
1339AS627
1339AS833
1339AS642
1339AS841
1339AS641
1339AS839
1339AS643
1339AS894
1339AS642
1339AS841
1339AS742
1339AS897
1339AS643
1339AS894
1339AS743
1339AS898
1339AS742
1339AS897
1339AS744
1339AS926
1339AS743
1339AS898
1339AS745
1339AS984
1339AS744
1339AS984
1339AS746
1339AS1240R-S1-Layout1
1339AS745

4. NOTE 4 on 1339AS1108 Rev. C (End Frame Assembly) allows Phosphoric Acid Etch as an option to commercial Blasting. However, NOTE 1 on drawing 1339AS1290 Rev - (Coatings, Application) requires Blasting in accordance with SSPC-SP 6/NACE NO. 3 for End Frames, and does not allow Phosphoric Acid Etching. The two drawings appear to conflict with each other. Please provide clarification on the preparation of End Frames for finishing.

Clarification: Note 1339AS1108 revision C as supplied with the RFP bid package of 1339AS drawing is incorrect. Note 4 on 1339AS1108 for this RFP / procurement shall be changed to read as follows:

“4. AFTER CLEANING RECONDITION AND PRIME PER 1339AS1290 NOTE 1.”

5. We notice many of the changes since the 2012 TDP include modification of the Distribution Statement. Please explain the apparent contradiction between the limits of Distribution imposed on the TDP by the DD2345 requirement; versus what is actually on the drawings, and Technical manual. It appears there is a conscious effort by the Government to broaden versus restrict distribution of these drawings; yet the TDP distribution remains limited by the DD2345 per this Solicitation, thereby limiting competition.

From:

"Notice: this document or knowledge of its possession will not be released to another nation without specific authority of the department of the Navy of the United States; that it will not be used for other than military purposes; that individual or corporate rights originating in the information, whether patented or not, will be respected. That the information will be provided the same degree of security afforded it by the Department of Defense of the United States."

To:

"Public Release."

Clarification: See Updated Solicitation Amendment - The NAVY has determined that Export Control requirements are not applicable for this procurement. However, each drawing contains the appropriate Distribution Statement.

6. Regarding the Technical Manual requirements, the government states “contractors format” in CDRL L002, but states in the Integrated Logistics SOW that “The Technical Manual should be written to the requirements of MIL-STD-3001-1”. Please state which is correct.

Clarification: The Logistics Requirements has been removed from this procurement. CDRL L001 and L002 are not applicable.

7. Please consider posting an extension that reflects the time needed for your team to provide the additional critical information; plus allows time for us to review and incorporate it into our offer.

See Updated Solicitation Amendment - The NAVY has determined that the timeline for receipt of proposals on January 28, 2019 at 3:30pm EST is adequate.

8. Please provide clarification of Government intent. How can FA Testing start 90 days after award, when design changes will not have been reviewed by the USG to implement in the FA Shelters? Reference SOW 3.8 and CDRL L001: It appears the contractor is required to complete drawing updates to the TDP, and the preliminary changes will not be reviewed by the USG until approximately 135 days after award. This would imply the Government expects contractors to build to the TDP, identify changes as we go, then update the TDP after First Article, but before production. However, per SOW 3.7 Prior to {release for production} all purchase of materials and manufacturing shall be at the contractor’s expense and risk; which is unfair when the Government has not yet finalized design changes.

Clarification: The Logistics Requirements has been removed from this procurement. CDRL L001 and L002 are not applicable.

9. Reference CDRLs L001/L002: Final DCN is due 240 days ARO, Final TM Changes are due 180 days ARO – each have a 45 day USG review period after submittal. Both Preliminary and Final TM changes are due before the Design Change Notices are reviewed by the USG. How can TM changes be implemented prior to approval of design changes?

Clarification: The Logistics Requirements has been removed from this procurement. CDRL L001 and L002 are not applicable.

10. Regarding the Technical Data Package, please provide the Bill of Materials in an editable electronic file complete with drawing numbers, part numbers and source controlled/approved vendors for all purchased parts as listed on the drawings. (Example: Please ensure that sources for corner blocks listed on drawing 1339AS150 Rev B & 1339AS149 Rev B are updated, as they are no longer in business, and someone must have been providing these during the past 10+ years.)

Clarification: The drawings outlined in each CLIN identifies the materials for each MF type. Refer to sk1339as149-150.pdf for additional information on corner fittings.

11. Please provide an editable electronic file summarizing of all Notices of Revision (NORs) associated with the changes made between 2012 and 2018.

Clarification: NORs have not been generated for revisions of 1339AS series drawing.

The naming convention for the PDF files of the 1339AS drawing package includes the revision level of the drawing.

For example, for the 2012 version of the 1339AS drawing package included which is revision L of drawing 1339AS100. The 2018 version of the 1339AS drawing package includes 1339AS100rMs6.pdf which is revision M of drawing 1339AS100.

It can be determined which drawings have been revised between the 2012 and 2018 versions of the 1339AS drawing package by comparing the file names between the files provided and taking note of the letter after the letter “r” in the file name (which indicates the revision level of the drawing). If the letters are different the drawing has been revised.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

Mobile Facility, Type A P/N 1339AS700-1, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List"

To:

Mobile Facility, Type A P/N 1339AS700-1, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS700 rev L (DL1339AS700rLs8) and DL1339AS100 rev R (DL1339AS100rRs15).

CLIN 0002

Mobile Facility, Side Opening Type A P/N 1339AS500-1, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List"

Mobile Facility, Side Opening Type A P/N 1339AS500-1, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS500 rev P (DL1339AS500rPs19).

CLIN 0003

Mobile Facility, Side Opening Type B P/N 1339AS501-1, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List"

Mobile Facility, Side Opening Type B P/N 1339AS501-1, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS501 rev P (DL1339AS501rPs18).

CLIN 0004

Mobile Facility, Integration unit P/N 1339AS900-2, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List"

Mobile Facility, Integration unit P/N 1339AS900-2, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS900-2 rev J (DL1339AS900-2rJs6) and DL1339AS101 rev R (DL1339AS101rRs15).

CLIN 0005

Mobile Facility, Side Opening w/ Double Doors P/N 1339AS1000-1, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List"

Mobile Facility, Side Opening w/ Double Doors P/N 1339AS1000-1, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS1000 rev D (DL1339AS1000rDs19).

CLIN 0006

Mobile Facility, Side Opening Type C P/N 1339AS1101-1, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List"

Mobile Facility, Side Opening Type C P/N 1339AS1101-1, for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List" Drawings IAW Data List (DL) DL1339AS1101 rev D (DL1339AS1101rDs17).

CLIN 0007

Production Year One (1) for Mobile Facility Type A P/N 1339AS700-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”, Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year One (1) for Mobile Facility Type A P/N 1339AS700-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS700 rev L (DL1339AS700rLs8) and DL1339AS100 rev R (DL1339AS100rRs15).

CLIN 0008

Production Year One (1) for Mobile Facility Type A P/N 1339AS500-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year One (1) for Mobile Facility Type A P/N 1339AS500-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS500 rev P (DL1339AS500rPs19).

CLIN 0009

Production Year One (1) for Mobile Facility Side Opening Type B P/N 1339AS501-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year One (1) for Mobile Facility Side Opening Type B P/N 1339AS501-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS501 rev P (DL1339AS501rPs18).

CLIN 0010

Production Year One (1) for Mobile Facility Integration unit P/N 1339AS900-2 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year One (1) for Mobile Facility Integration unit P/N 1339AS900-2 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS900-2 rev J (DL1339AS900-2rJs6) and DL1339AS101 rev R (DL1339AS101rRs15).

CLIN 0011

Production Year One (1) for Mobile Facility Side Opening with Double Doors P/N 1339AS1000-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year One (1) for Mobile Facility Side Opening with Double Doors P/N 1339AS1000-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS1000 rev D (DL1339AS1000rDs19).

CLIN 0012

Production Year One (1) for Mobile Facility Side Opening Type C P/N 1339AS1101-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year One (1) for Mobile Facility Side Opening Type C P/N 1339AS1101-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List" Drawings IAW Data List (DL) DL1339AS1101 rev D (DL1339AS1101rDs17).

CLIN 0013

Production Year Two (2) for Mobile Facility Type A P/N 1339AS700-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Two (2) for Mobile Facility Type A P/N 1339AS700-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS700 rev L (DL1339AS700rLs8) and DL1339AS100 rev R (DL1339AS100rRs15).

CLIN 0014

Production Year Two (2) for Mobile Facility Type A P/N 1339AS500-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Two (2) for Mobile Facility Type A P/N 1339AS500-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS500 rev P (DL1339AS500rPs19).

CLIN 0015

Production Year Two (2) for Mobile Facility Side Opening Type B P/N 1339AS501-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Two (2) for Mobile Facility Side Opening Type B P/N 1339AS501-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)";Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS501 rev P (DL1339AS501rPs18).

CLIN 0016

Production Year Two (2) for Mobile Facility Integration unit P/N 1339AS900-2 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Two (2) for Mobile Facility Integration unit P/N 1339AS900-2 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS900-2 rev J (DL1339AS900-2rJs6) and DL1339AS101 rev R (DL1339AS101rRs15).

CLIN 0017

Production Year Two (2) for Mobile Facility Side Opening with Double Doors P/N 1339AS1000-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Two (2) for Mobile Facility Side Opening with Double Doors P/N 1339AS1000-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS1000 rev D (DL1339AS1000rDs19).

CLIN 0018

Production Year Two (2) for Mobile Facility Side Opening Type C P/N 1339AS1101-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Two (2) for Mobile Facility Side Opening Type C P/N 1339AS1101-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List" Drawings IAW Data List (DL) DL1339AS1101 rev D (DL1339AS1101rDs17).

CLIN 0019

Production Year Three (3) for Mobile Facility Type A P/N 1339AS700-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Three (3) for Mobile Facility Type A P/N 1339AS700-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS700 rev L (DL1339AS700rLs8) and DL1339AS100 rev R (DL1339AS100rRs15).

CLIN 0020

Production Year Three (3) for Mobile Facility Type A P/N 1339AS500-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Three (3) for Mobile Facility Type A P/N 1339AS500-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS500 rev P (DL1339AS500rPs19).

CLIN 0021

Production Year Three (3) for Mobile Facility Side Opening Type B P/N 1339AS501-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Three (3) for Mobile Facility Side Opening Type B P/N 1339AS501-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)";Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS501 rev P (DL1339AS501rPs18).

CLIN 0022

Production Year Three (3) for Mobile Facility Integration unit P/N 1339AS900-2 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Three (3) for Mobile Facility Integration unit P/N 1339AS900-2 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS900-2 rev J (DL1339AS900-2rJs6) and DL1339AS101 rev R (DL1339AS101rRs15).

CLIN 0023

Production Year Three (3) for Mobile Facility Side Opening with Double Doors P/N 1339AS1000-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Three (3) for Mobile Facility Side Opening with Double Doors P/N 1339AS1000-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS1000 rev D (DL1339AS1000rDs19).

CLIN 0024

Production Year Three (3) for Mobile Facility Side Opening Type C P/N 1339AS1101-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Three (3) for Mobile Facility Side Opening Type C P/N 1339AS1101-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List" Drawings IAW Data List (DL) DL1339AS1101 rev D (DL1339AS1101rDs17).

CLIN 0025

Production Year Four (4) for Mobile Facility Type A P/N 1339AS700-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Four (4) for Mobile Facility Type A P/N 1339AS700-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS700 rev L (DL1339AS700rLs8) and DL1339AS100 rev R (DL1339AS100rRs15).

CLIN 0026

Production Year Four (4) for Mobile Facility Type A P/N 1339AS500-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Four (4) for Mobile Facility Type A P/N 1339AS500-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS500 rev P (DL1339AS500rPs19).

CLIN 0027

Production Year Four (4) for Mobile Facility Side Opening Type B P/N 1339AS501-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Four (4) for Mobile Facility Side Opening Type B P/N 1339AS501-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS501 rev P (DL1339AS501rPs18).

CLIN 0028

Production Year Four (4) for Mobile Facility Integration unit P/N 1339AS900-2 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Four (4) for Mobile Facility Integration unit P/N 1339AS900-2 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS900-2 rev J (DL1339AS900-2rJs6) and DL1339AS101 rev R (DL1339AS101rRs15).

CLIN 0029

Production Year Four (4) for Mobile Facility Side Opening with Double Doors P/N 1339AS1000-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Four (4) for Mobile Facility Side Opening with Double Doors P/N 1339AS1000-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS1000 rev D (DL1339AS1000rDs19).

CLIN 0030

Production Year Four (4) for Mobile Facility Side Opening Type C P/N 1339AS1101-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Four (4) for Mobile Facility Side Opening Type C P/N 1339AS1101-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List" Drawings IAW Data List (DL) DL1339AS1101 rev D (DL1339AS1101rDs17).

CLIN 0031

Production Year Five (5) for Mobile Facility Type A P/N 1339AS700-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Five (5) for Mobile Facility Type A P/N 1339AS700-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS700 rev L (DL1339AS700rLs8) and DL1339AS100 rev R (DL1339AS100rRs15).

CLIN 0032

Production Year Five (5) for Mobile Facility Type A P/N 1339AS500-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Five (5) for Mobile Facility Type A P/N 1339AS500-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS500 rev P (DL1339AS500rPs19).

CLIN 0033

Production Year Five (5) for Mobile Facility Side Opening Type B P/N 1339AS501-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Five (5) for Mobile Facility Side Opening Type B P/N 1339AS501-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS501 rev P (DL1339AS501rPs18).

CLIN 0034

Production Year Five (5) for Mobile Facility Integration unit P/N 1339AS900-2 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Five (5) for Mobile Facility Integration unit P/N 1339AS900-2 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS900-2 rev J (DL1339AS900-2rJs6) and DL1339AS101 rev R (DL1339AS101rRs15).

CLIN 0035

Production Year Five (5) for Mobile Facility Side Opening with Double Doors P/N 1339AS1000-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Five (5) for Mobile Facility Side Opening with Double Doors P/N 1339AS1000-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List". Drawings IAW Data List (DL) DL1339AS1000 rev D (DL1339AS1000rDs19).

CLIN 0036

Production Year Five (5) for Mobile Facility Side Opening Type C P/N 1339AS1101-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "NAVAIR 1339AS Series Drawings"; Attachment 3: “1339AS Addenda”; Attachment 4: "Integrated Logistics Support SOW"; and Exhibit A "DD Form 1423, Contract Data Requirements List".

Production Year Five (5) for Mobile Facility Side Opening Type C P/N 1339AS1101-1 in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2, "Drawing Package 1339AS463"; Attachment 3: “1339AS Addenda”, and Exhibit A "DD Form 1423, Contract Data Requirements List" Drawings IAW Data List (DL) DL1339AS1101 rev D (DL1339AS1101rDs17).

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

DESCRIPTIONS AND SPECIFICATION

CLINs 0001- 0006: The contractor shall manufacture, test and deliver the First Article Test (FAT) Mobile Facility (MF) units in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "Drawing Package 1339AS463 (as identified in the CLINs)"; Attachment 3: “1339AS Addenda”; and Exhibit A "DD Form 1423, Contract Data Requirements List".

CLINs 0007-0036: The contractor shall manufacture and deliver the Mobile Facility (MF) units in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "Drawing Package 1339AS463 (as identified in the CLINs)"; Attachment 3: “1339AS Addenda”; and Exhibit A "DD Form 1423, Contract Data Requirements List".

CLINs 0037-0038: The contractor shall manufacture and deliver the Mobile Facility (MF) units in accordance with Section J, Attachment 3: “1339AS Addenda”.

CLINs 0039-0046: The technical data to be furnished hereunder shall be in accordance with Exhibit A, Contract Data Requirements List, DD Form 1423.

The Contractor shall provide the supplies and/or services in accordance with Section J, Attachment 1: "Statement of Work (SOW) Mobile Facilities (MF)"; Attachment 2: "Drawing Package 1339AS463 (as identified in the CLINs)"; Attachment 3: “1339AS Addenda”; and Exhibit A "DD Form 1423, Contract Data Requirements List".

SECTION F - DELIVERIES OR PERFORMANCE

The following have been added by full text:

NOTES

**** REMOVED LOGISTICS CLIN 0047 AND CLIN 0048 ****

52.211-8TIME OF DELIVERY (JUN 1997)
(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

ITEM NUMBER
MAX QTY
WITHIN DATE AFTER

DELIVERY ORDER

DELIVERY ADDRESS

1 Each

Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.

The draft First Article Acceptance Test Plan (CLIN 0042) shall be submitted within 60 days ADC IAW CDRL A003.

The First Article Test Report (CLIN 0043) shall be submitted within 300 days ADC IAW CDRL A003A.

MF Type A P/N 1339AS700-1 Completion of the First Article Test unit is required within 270 Days After Contract (DAC).

Delivery is FOB Destination

0002
1 Each

Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.

The draft First Article Acceptance Test Plan (CLIN 0042) shall be submitted within 60 days ADC IAW CDRL A003.

The First Article Test Report (CLIN 0043) shall be submitted within 300 days ADC IAW CDRL A003A.

MF Side Opening Type A P/N 1339AS500-1

Delivery is FOB Destination

0003
1 Each

Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.

The draft First Article Acceptance Test Plan (CLIN 0042) shall be submitted within 60 days ADC IAW CDRL A003.

The First Article Test Report (CLIN 0043) shall be submitted within 300 days ADC IAW CDRL A003A.

MF Side Opening Type B P/N 1339AS501-1

Delivery is FOB Destination

0004
1 Each

Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.

The draft First Article Acceptance Test Plan (CLIN 0042) shall be submitted within 60 days ADC IAW CDRL A003.

The First Article Test Report (CLIN 0043) shall be submitted within 300 days ADC IAW CDRL A003A.

MF Integration Unit P/N 1339AS900-2

Delivery is FOB Destination

0005
1 Each

Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.

The draft First Article Acceptance Test Plan (CLIN 0042) shall be submitted within 60 days ADC IAW CDRL A003.

The First Article Test Report (CLIN 0043) shall be submitted within 300 days ADC IAW CDRL A003A.

MF Side Opening w/ Double Doors P/N 1339AS1000-1

Delivery is FOB Destination

0006
1 Each

Contractor First Article Qualification Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3.

The draft First Article Acceptance Test Plan (CLIN 0042) shall be submitted within 60 days ADC IAW CDRL A003.

The First Article Test Report (CLIN 0043) shall be submitted within 300 days ADC IAW CDRL A003A.

MF Side Opening Type C P/N 1339AS1101-1

Delivery is FOB Destination

MF Type A P/N1339AS700-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.

Delivery is FOB Destination

MF SO Type A P/N 1339AS500-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.

Delivery is FOB Destination

MF SO Type B P/N 1339AS501-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.

Delivery is FOB Destination

MF Integration Unit P/N 1339AS900-2, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.

Delivery is FOB Destination

MF SO w/ DD P/N 1339AS1000-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.

Delivery is FOB Destination.

MF Type C P/N 1339AS1101-1, Production Year One, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.

Delivery is FOB Destination

MF Type A P/N1339AS700-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.

Delivery is FOB Destination

MF SO Type A P/N 1339AS500-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.

Delivery is FOB Destination

MF SO Type B P/N 1339AS501-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.

Delivery is FOB Destination

MF Integration Unit P/N 1339AS900-2, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.

Delivery is FOB Destination

MF SO w/ DD P/N 1339AS1000-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.

Delivery is FOB Destination

MF Type C P/N 1339AS1101-1, Production Year Two, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.

Delivery is FOB Destination

MF Type A P/N1339AS700-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year Three shall be from Government Release for Production through 1,095 days after Government Release for Production.

Delivery is FOB Destination

MF SO Type A P/N 1339AS500-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year Three shall be from Government Release for Production through 1,095 days after Government Release for Production.

Delivery is FOB Destination

MF SO Type B P/N 1339AS501-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year Three shall be from Government Release for Production through 1,095 days after Government Release for Production.

Delivery is FOB Destination

MF Integration Unit P/N 1339AS900-2, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year Three shall be from Government Release for Production through 1,095 days after Government Release for Production.

Delivery is FOB Destination

MF SO w/ DD P/N 1339AS1000-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year Three shall be from Government Release for Production through 1,095 days after Government Release for Production.

Delivery is FOB Destination

MF Type C P/N 1339AS1101-1, Production Year Three, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year Three shall be from Government Release for Production through 1,095 days after Government Release for Production.

Delivery is FOB Destination

MF Type A P/N1339AS700-1, Production Year Four, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year Four shall be from Government Release for Production through 1,460 days after Government Release for Production.

Delivery is FOB Destination

MF SO Type A P/N 1339AS500-1, Production Year Four, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year Four shall be from Government Release for Production through 1,460 days after Government Release for Production.

Delivery is FOB Destination

MF SO Type B P/N 1339AS501-1, Production Year Four, if ordered, delivery shall be made within 180 DAYS ARO, provided that release for production has been authorized.

Production Year Four shall be from Government Release for Production through 1,460 days after Government Release for Production.

Delivery is…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .