MF_Logistics_Statement_of_Work.doc

DOC document 29 KB Posted

Attached to
Mobile Facilities Federal contract opportunity
Solicitation number
N68335-18-R-0141
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

This statement of work outlines integrated logistics support requirements for the production and delivery of various mobile facilities. The Navy seeks a contractor to provide maintenance manuals, design change notices, and provisioning documentation for mobile facilities used at the intermediate maintenance level. The contractor must submit technical manual changes and notify the Navy of any configuration changes to the mobile facilities at least 30 days prior to delivery. The related federal contract opportunity is a solicitation from the Naval Air Warfare Center Aircraft Division seeking proposals for a five-year indefinite delivery/indefinite quantity contract for the production and delivery of mobile facilities in accordance with government drawings. Offerors must submit proposals by the specified date, and the contract is subject to terms for applicable provisions, clauses, and federal acquisition regulations.

Logistics SOW

View the file

Other files for this federal contract opportunity

Other files attached to Mobile Facilities, newest first.
File Type Posted
MF_SOW.doc DOC document
N68335-18-R-0141_(RFP)_Solicitation_Amendment_002.docx DOCX document
MF_CDRL_L001_RD.pdf PDF
MF_CDRL_L002_RD.pdf PDF
Questions_Solicitation_N68335-18-R-0141.docx DOCX document
N68335-18-R-0141_(RFP)_Solicitation_Amendment.pdf PDF
MF_SOW.doc DOC document
CDRLs.zip ZIP file
MF_SOW_2018_RD.doc DOC document
1339AS_Addenda_October_26_2018.pdf PDF
N68335-18-R-0141_(RFP).docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INTEGRATED LOGISTICS SUPPORT

STATEMENT OF WORK

Statement of Work (SOW) for Mobile Facilities (MF), P/N 1339AS500-1, 1339AS501-1, 1339AS700-1, 1339AS900-1, 1339AS1000-1, 1339AS1101-1

1.0 PURPOSE: This SOW establishes the Integrated Logistics Support (ILS) requirements for the MF (Various).

2.0 APPLICATION: This document applies to the MF and all supporting Logistics elements.

2.1 APPLICATION GUIDANCE: This document contains guidance regarding the acquisition phase for which development, implementation and execution of ILS program tasks are developed.

3.0 REQUIREMENTS: The requirements listed herein apply to all logistics deliverables to be provided under the contract.

3.1 ILS DELIVERABLES: The following logistics data will be provided by the contractor in response to the requirements of the Contract Data Requirements List (CDRL) Form DD 1423-1 of solicitation.

3.2 TECHNICAL MANUAL CHANGES: The contractor shall provide marked up change pages to the existing Technical Manual NAVAIR 19-25-177 as required, based upon approved Engineering Change Proposals (ECP’s), Design Control Change Notices (DCN’s), and any text changes deemed necessary to keep the manuals current.

3.3 STYLE AND FORMAT: This manual will support the equipment throughout the life of the MF. Any changes to the manual will be an update in accordance with specifications in the current version of NAVAIR 19-25-177. The Technical Manual should be written to the requirements of MIL-STD-3001-1 for style and format. An acceptable manual should contain but not be limited to the following; Front Matter, Introduction, Preparation for use and Installation Instructions, Principles of Operation, Operating Instructions, Maintenance and Servicing Instructions, Preparation for Storage (Preservation/De-Preservation) and Shipment, Parts List, and Operational Maintenance Illustrations.

3.4 DESIGN CHANGE NOTICES: Each production unit shall be identical to the First Article Test (FAT) units. The government must be notified of and approve and configuration change at least 30 days before delivery of changed units. Configuration changes are defined as additions, deletions, supersedures, or modification of the unit or any part of the unit during the performance of the contract. This document shall contain the following information: Identification of the change, reason for the change, Supplementary Provisioning Technical Documentation (SPTD) for the new parts, effects on the interim support material list (ISL) if any, effectivity and interchangeability with the earlier configuration. Approval/Disapproval will be given within 14 days after receipt of the DCN, the contractor shall process all DCN’s as required based upon approved ECP’s and other parts changed due to non availability of required part identified in drawing package 1339AS463, to document the configuration changes. All DCN’s must have accompanying SPTD to identify new parts.

3.5 MAINTENANCE PLANNING/PROVISIONING DOCUMENTATION: Maintenance Philosophy for the MF is as follows: The MF is used at the Intermediate Maintenance Level of Navy and Marine Corps activities. All repairs will be performed at Depot Level.

4.0 Logistics Point of Contact:

All Logistics-related questions should be addressed accordingly to:

Rodney Davis Code 1.3.1.8.1 Naval Air Warfare Center Aircraft Division

Lakehurst, NJ 08733-5108

Phone: 732-323-2770