NCRC_MIL-STD-881C-based_Electronic_Systems_WBS_Template_2015_10_1.docx

Military Standard Rev. C, 2015 DOCX document 19 KB Posted

Attached to
NIMITZ-class Aircraft Carrier Recovery Capability
Solicitation number
N68335-16-RFI-0084
Issued by

About this file

MIL-STD-881C-based Electronic Systems Work Breakdown Structure

View the file

Other versions and copies of MIL-STD-881C

Who attaches MIL-STD-881C

Other files

File Type Posted
NACRC_RFI_2016_1_13_1.docx DOCX document
NACRC_RFI_Clarifications_2016_1_13.docx DOCX document
NACRC_System_Metrics_template_2016_1_5.xlsx XLSX spreadsheet
NACRC_TMSA_Template_2015_11_30.docx DOCX document
NACRC_RFI_2015_12_1.docx DOCX document
NACRC_System_Metrics_template_2015_11_10.xlsx XLSX spreadsheet
NACRC_RFI_NDA_2015_11_24.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MIL-STD-881C-based Electronic Systems Work Breakdown Structure

Instructions:

(1) Please fill in the development costs and procurement costs for each WBS element. Please fill in the number of units assumed for procurement if applicable for the WBS element. If the number of units assumed for procurement is not applicable, please enter “N/A”.

(2) Save this file as "Companyname_Volume 3 Cost.docx". If multiple responses are provided, please indicate with a number following the company name.

Nonrecurring (Development)
Recurring (Procurement)
# of units assumed for procurement (if applicable)
1.0
NIMITZ-Class Arresting Gear
1.1
NIMITZ-Class Arresting Gear Prime Mission Product (PMP)
1.1.1
PMP Subsystem Arresting Engine
1.1.1.1
PMP Subsystem Hardware
1.1.1.2
PMP Subsystem Software Release
1.1.1.3
Subsystem Integration, Assembly, Test and Checkout
1.1.2
PMP Subsystem Arresting Control System
1.1.2.1
Hardware Product Engineering
1.1.2.2
PMP Subsystem Software Release
1.1.2.3
Subsystem Integration, Assembly, Test and Checkout
1.1.3
PMP Drive Fairlead System
1.1.3.1
PMP Subsystem Hardware
1.1.3.2
Computer Software Release
1.1.3.3
Subsystem Integration, Assembly, Test and Checkout
1.1.4
Ancillary Support Subsystems 1...n
1.1.4.1
Hardware
1.1.4.2
Software
1.1.4.3
Integration, Assembly, Test and Checkout
1.1.5
Software
1.1.5.1
Software Product Engineering
1.1.5.2
Computer Software Configuration Items (CSCI) 1...n
1.1.5.3
Software Integration, Assembly, Test and Checkout
1.1.6
PMP Integration, Assembly, Test and Checkout
1.2
Platform Integration
1.2.1
Shipboard
1.2.2
Land Based
1.3
System Engineering
1.4
Program Management
1.5
System Test and Evaluation
1.5.1
Development Test and Evaluation
1.5.2
Operational Test and Evaluation
1.5.3
Mock-ups / System Integration Labs (SILs)
1.5.4
Test and Evaluation Support
1.5.5
Test Facilities
1.6
Training
1.7
Data
1.8
Peculiar Support Equipment
1.9
Common Support Equipment
1.10
Operational/Ship Activation
1.10.1
System Assembly, Installation & Checkout on Ship
1.10.2
Contractor Technical Support
1.10.3
Ship Conversion
1.10.4
Sustainment/Interim Contractor Support
1.11
Industrial Facilities
1.12
Initial Spares and Repair Parts