NACRC_System_Metrics_template_2015_11_10.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
NIMITZ-class Aircraft Carrier Recovery Capability
Solicitation number
N68335-16-RFI-0084
Issued by

View the file

Other files

File Type Posted
NACRC_RFI_2016_1_13_1.docx DOCX document
NACRC_RFI_Clarifications_2016_1_13.docx DOCX document
NACRC_System_Metrics_template_2016_1_5.xlsx XLSX spreadsheet
NACRC_TMSA_Template_2015_11_30.docx DOCX document
NACRC_RFI_2015_12_1.docx DOCX document
NCRC_MIL-STD-881C-based_Electronic_Systems_WBS_Template_2015_10_1.docx DOCX document
NACRC_RFI_NDA_2015_11_24.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

System Metrics System Metrics

Instructions:
(1) Please fill in as many blanks as possible. Blank responses will not be penalized but will limit ability to evaluate criteria.
(2) Save this file as "Companyname_Metrics.xls". If multiple responses are provided, please indicate with a number following the company name.
(3) Keep data inputs to one column
Image of System
Company Name
System Designation
System Performance
1.0Arrestment Runout Tracking - Max approach angle relative to centerline for landing on centerline (Angle)
Arrestment Runout Tracking - Max approach angle relative to centerline for landing 10 ft. off centerline (Angle)
Arrestment Runout Tracking - Max approach angle relative to centerline for landing 20 ft. off centerline (Angle)
Energy Absorption Lower Limit (ft-lbs)
Energy Absorption Upper Limit (ft-lbs)
Peak-to-Mean Ratio for landing weight <= 25K lbs.

(Real Number) Peak-to-Mean Ratio for landing weight > 25K lbs.

(Real Number)

Imparted Loads - hook load (lbs.) for F/A-18 C/D
Imparted Loads - g load (g) for F/A - 18 C/D
Imparted Loads - hook load (lbs.) for F/A-18 E/F
Imparted Loads - g load (g) for F/A - 18 E/F
Imparted Loads - hook load (lbs.) for EA-18G
Imparted Loads - g load (g) for EA-18G
Imparted Loads - hook load (lbs.) for F-35C
Imparted Loads - g load (g) for F-35C
Imparted Loads - hook load (lbs.) for E-2C
Imparted Loads - g load (g) for E-2C
Imparted Loads - hook load (lbs.) for E-2D
Imparted Loads - g load (g) for E-2D
Imparted Loads - hook load (lbs.) for T-45C
Imparted Loads - g load (g) for T-45C
Imparted Loads - hook load (lbs.) for C-2A
Imparted Loads - g load (g) for C-2A
Arrestment-To-Battery Cycle Time (seconds)
Sustained Recovery Rate (Number of recoveries over 30 day period/12 hour per day ops)
Surge Recovery Rate (Number of recoveries over 4 days with 24 hour per day ops)
Surge Recovery Rate (Number of recoveries over 6 days with 24 hour per day ops)
Peak Recovery Rate (Number of recoveries over 21 min period)
Time to Convert From Barricade to Pendant (min)
Time to Convert to Barricade from Pendant (min)
System Weight (long tons)
Area required assuming max avail 8 foot height (sq. ft.)
System Reliability Availability & Maintainability
2.0Mean Cycles Between Operational Mission Failures (MCBOMF) (Integer)
Shipset Availability (Ao) (Percentage)
Mean Time to Repair (Hours)
Mean Cycles between Corrective Maintenance Actions (Integer)
Max Time to Repair (Hours)
Critical System Reliability (Recrsys) (Percentage)
Cable Tension
3.0Maximum Cable Tension (Kips)
Current Status

(Paper/Immature Prototype/Mature Prototype/Demonstrator/POR) Please provide supporting rationale in Volume I - Technical Description Document.

DO NOT REFORMAT DO NOT REFORMAT

DO NOT REFORMAT DO NOT REFORMAT

File details come from the government source that posted it. Updated .