NACRC_System_Metrics_template_2015_11_10.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- N68335-16-RFI-0084
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NACRC_RFI_2016_1_13_1.docx | DOCX document | |
| NACRC_RFI_Clarifications_2016_1_13.docx | DOCX document | |
| NACRC_System_Metrics_template_2016_1_5.xlsx | XLSX spreadsheet | |
| NACRC_TMSA_Template_2015_11_30.docx | DOCX document | |
| NACRC_RFI_2015_12_1.docx | DOCX document | |
| NCRC_MIL-STD-881C-based_Electronic_Systems_WBS_Template_2015_10_1.docx | DOCX document | |
| NACRC_RFI_NDA_2015_11_24.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
System Metrics System Metrics
| Instructions: | |
| (1) Please fill in as many blanks as possible. Blank responses will not be penalized but will limit ability to evaluate criteria. | |
| (2) Save this file as "Companyname_Metrics.xls". If multiple responses are provided, please indicate with a number following the company name. | |
| (3) Keep data inputs to one column | |
| Image of System | |
| Company Name | |
| System Designation | |
| System Performance | |
| 1.0 | Arrestment Runout Tracking - Max approach angle relative to centerline for landing on centerline (Angle) |
| Arrestment Runout Tracking - Max approach angle relative to centerline for landing 10 ft. off centerline (Angle) | |
| Arrestment Runout Tracking - Max approach angle relative to centerline for landing 20 ft. off centerline (Angle) | |
| Energy Absorption Lower Limit (ft-lbs) | |
| Energy Absorption Upper Limit (ft-lbs) | |
| Peak-to-Mean Ratio for landing weight <= 25K lbs. |
(Real Number) Peak-to-Mean Ratio for landing weight > 25K lbs.
(Real Number)
| Imparted Loads - hook load (lbs.) for F/A-18 C/D | |
| Imparted Loads - g load (g) for F/A - 18 C/D | |
| Imparted Loads - hook load (lbs.) for F/A-18 E/F | |
| Imparted Loads - g load (g) for F/A - 18 E/F | |
| Imparted Loads - hook load (lbs.) for EA-18G | |
| Imparted Loads - g load (g) for EA-18G | |
| Imparted Loads - hook load (lbs.) for F-35C | |
| Imparted Loads - g load (g) for F-35C | |
| Imparted Loads - hook load (lbs.) for E-2C | |
| Imparted Loads - g load (g) for E-2C | |
| Imparted Loads - hook load (lbs.) for E-2D | |
| Imparted Loads - g load (g) for E-2D | |
| Imparted Loads - hook load (lbs.) for T-45C | |
| Imparted Loads - g load (g) for T-45C | |
| Imparted Loads - hook load (lbs.) for C-2A | |
| Imparted Loads - g load (g) for C-2A | |
| Arrestment-To-Battery Cycle Time (seconds) | |
| Sustained Recovery Rate (Number of recoveries over 30 day period/12 hour per day ops) | |
| Surge Recovery Rate (Number of recoveries over 4 days with 24 hour per day ops) | |
| Surge Recovery Rate (Number of recoveries over 6 days with 24 hour per day ops) | |
| Peak Recovery Rate (Number of recoveries over 21 min period) | |
| Time to Convert From Barricade to Pendant (min) | |
| Time to Convert to Barricade from Pendant (min) | |
| System Weight (long tons) | |
| Area required assuming max avail 8 foot height (sq. ft.) | |
| System Reliability Availability & Maintainability | |
| 2.0 | Mean Cycles Between Operational Mission Failures (MCBOMF) (Integer) |
| Shipset Availability (Ao) (Percentage) | |
| Mean Time to Repair (Hours) | |
| Mean Cycles between Corrective Maintenance Actions (Integer) | |
| Max Time to Repair (Hours) | |
| Critical System Reliability (Recrsys) (Percentage) | |
| Cable Tension | |
| 3.0 | Maximum Cable Tension (Kips) |
| Current Status |
(Paper/Immature Prototype/Mature Prototype/Demonstrator/POR) Please provide supporting rationale in Volume I - Technical Description Document.
DO NOT REFORMAT DO NOT REFORMAT
DO NOT REFORMAT DO NOT REFORMAT
File details come from the government source that posted it. Updated .