EVA_MIL-STD-881C-based_Electronic_Systems_WBS_Template_2014_5_30.docx

Military Standard Rev. C, 2014 DOCX document 17 KB Posted

Attached to
a study to evaluate the performance, operational capability and costs of fielding alternative systems to meet current Navy EVA requirements as defined in the Aircraft Survivability (AS) Initial Capabilities Document (ICD)
Solicitation number
Not on record
Issued by

About this file

EVA MIL-STD Electronic Systems WBS

View the file

Other versions and copies of MIL-STD-881C

Who attaches MIL-STD-881C

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MIL-STD-881C-based Electronic Systems Work Breakdown Structure

Instructions:

(1) Please fill in the development costs and procurement costs for each WBS element. Please fill in the number of units assumed for procurement if applicable for the WBS element. If the number of units assumed for procurement is not applicable, please enter “N/A”.

(2) Save this file as "Companyname_Volume 3 Cost.docx". If multiple responses are provided, please indicate with a number following the company name.

EVA
Nonrecurring (Development)
Recurring (Procurement)
# of units assumed for procurement (if applicable)
1.0
Enhanced Visual Acuity (EVA)
1.1
EVA Prime Mission Product (PMP)
1.1.1
Helmet system
1.1.1.1
Helmet mounted Sensor(s)
1.1.1.2
Display
1.1.1.3
Optical components
1.1.1.4
Tracker
1.1.1.5
Helmet
1.1.1.6
processor
1.1.1.7
software
1.1.1.8
Other Helmet mounted WRAs as applicable
1.1.2
Aircraft systems
1.1.2.1
Software
1.1.2.2
WRAs for data processing
1.1.2.3
A/C mounted Sensor(s)
1.1.2.4
WRAs for helmet tracking
1.1.2.5
Other Weapon Replaceable Assemblies (WRA) as applicable
1.1.3
Integration, Assembly, Test and Checkout
1.2
Platform Integration, Assembly, Test & Checkout
1.3
System Engineering/Program Management
1.4
System Test & Evaluation
1.4.1
Development Test & Evaluation
1.4.2
Operational Test & Evaluation
1.4.3
Mock-ups / System Integration Labs (SILs)
1.4.4
Test & Evaluation Support
1.4.5
Test Facilities
1.5
Training
1.6
Data
1.7
Peculiar Support Equipment
1.8
Common Support Equipment
1.9
Operational/Site Activation
1.10
Industrial Facilities
1.11
Initial Spares and Repair Parts

File details come from the government source that posted it. Updated .