MIL-STD-881C-based Electronic Systems Work Breakdown Structure
Instructions:
(1) Please fill in the development costs and procurement costs for each WBS element. Please fill in the number of units assumed for procurement if applicable for the WBS element. If the number of units assumed for procurement is not applicable, please enter “N/A”.
(2) Save this file as "Companyname_Volume 3 Cost.docx". If multiple responses are provided, please indicate with a number following the company name.
| EVA |
| Nonrecurring (Development) |
| Recurring (Procurement) |
| # of units assumed for procurement (if applicable) |
| 1.0 |
| Enhanced Visual Acuity (EVA) |
| 1.1 |
| EVA Prime Mission Product (PMP) |
| 1.1.1.1 |
| Helmet mounted Sensor(s) |
| 1.1.1.3 |
| Optical components |
| 1.1.1.8 |
| Other Helmet mounted WRAs as applicable |
| 1.1.2.2 |
| WRAs for data processing |
| 1.1.2.3 |
| A/C mounted Sensor(s) |
| 1.1.2.4 |
| WRAs for helmet tracking |
| 1.1.2.5 |
| Other Weapon Replaceable Assemblies (WRA) as applicable |
| 1.1.3 |
| Integration, Assembly, Test and Checkout |
| 1.2 |
| Platform Integration, Assembly, Test & Checkout |
| 1.3 |
| System Engineering/Program Management |
| 1.4 |
| System Test & Evaluation |
| 1.4.1 |
| Development Test & Evaluation |
| 1.4.2 |
| Operational Test & Evaluation |
| 1.4.3 |
| Mock-ups / System Integration Labs (SILs) |
| 1.4.4 |
| Test & Evaluation Support |
| 1.7 |
| Peculiar Support Equipment |
| 1.8 |
| Common Support Equipment |
| 1.9 |
| Operational/Site Activation |
| 1.10 |
| Industrial Facilities |
| 1.11 |
| Initial Spares and Repair Parts |