0141_PARCOTS_CDRLs_06Aug15.pdf
PDF 111 KB Posted
- Solicitation number
- N68335-15-R-0002
About this file
Contract Data Requirements List CDRLs A001-H003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N68335-15-R-0002-0001.docx | DOCX document | |
| PAR_RFP_VENDOR_QUESTIONS_and_RESPONSES_updated_by_EW.docx | DOCX document | |
| PAR_COTS_CDRL_C003_Revised_111215.docx | DOCX document | |
| PAR_COTS_CDRL_G001Revised_111215.docx | DOCX document | |
| N68335-15-R-0002.docx | DOCX document | |
| N68335-15-R-0002.docx | DOCX document | |
| COTS_PAR_Exhibit_A001_-_H003.pdf | ||
| PAR_SOW-Rev_20150318.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED.
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
EMCS
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Spectrum Certification Spectral Characteristics Data
3. SUBTITLE
Frequency Certification Data
4. AUTHORITY (Data Acquisition Document No.)
DI-EMCS-81827
5. CONTRACT REFERENCE
SOW, para 2.4
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16
8. APP CODE
A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
BLOCK 8: The Government will have 30 calendar days for review and comment. The Contractor shall have 15 calendar days to incorporate Government comments. Subsequent Government approval/disapproval will occur no later than 15 calendar days after incorporation of comments by the contractor.
Block 12, 13: Submission of the DD Form 1494 data shall be as soon as the equipment characteristics, nomenclature and operational environments are known, but no later than 20 calendar days before TRR.
Block 14: All data shall be delivered on CD/DVD to the below address.
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, MD 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
Janice Zilch
J. DATE
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
EMCS
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Electromagnetic Environmental Effects (E3) Verification Report (E3V3)
3. SUBTITLE
HERO/HERP/HERF Analysis Report
4. AUTHORITY (Data Acquisition Document No.)
DI-EMCS-81542B (See Block 16)
5. CONTRACT REFERENCE
SOW Para. 2.4
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16
8. APP CODE
A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Only paragraph 3.2.i of DI-EMCS-81542B applies.
BLOCK 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government approval/disapproval will occur no later than 15 calendar days after incorporation of comments by the contractor.
Block 10,12: Submission due 30 calendar days before TRR.
Block 14: All data shall be delivered on CD/DVD to the below address.
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, MD 20670
PMA213H1
AIR 2.5.2
DCMA-ACO
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
EMCS
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Electromagnetic Environmental Effects (E3) Verification Report
3. SUBTITLE
E3 Verification report
4. AUTHORITY (Data Acquisition Document No.)
DI-EMCS-81542B (See Block 16)
5. CONTRACT REFERENCE
SOW Para. 2.5.5
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16
8. APP CODE
A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
BLOCK 4: All paragraphs except 3.2.i applies.
BLOCK 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government approval/disapproval will be no later than 15 calendar days after incorporation of comments by the contractor.
Block 10,12: Submission due 30 calendar days before TRR.
Block 14: All data shall be delivered on CD/DVD to the below address.
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, MD 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
SESS
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
B001
2. TITLE OF DATA ITEM
Planned Maintenance System (PMS) Maintenance Index Page (MIP)
3. SUBTITLE
Maintenance Index Page (MIP)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80992A
5. CONTRACT REFERENCE
SOW Para: 2.7.1
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
BLOCK 8: The Government will have 25 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government approval/disapproval will occur no later than 15 calender days after incorporation of comments by the contractor.
BLOCKS 10, 12, & 13: Submission due 90 calendar days after TRR.
BLOCK 14: All data shall be delivered on CD/DVD to the below address.
BLOCK 14 Address:
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, MD 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
SESS
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
B002
2. TITLE OF DATA ITEM
Planned Maintenance System (PMS) Maintenance Requirements Card (MRC)
3. SUBTITLE
Maintenance Requirements Card
(MRC)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80991A
5. CONTRACT REFERENCE
SOW Para: 2.7.1
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
BLOCK 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government approval/disapproval will occur no later than 15 calendar days after incorporation of comments by the contractor.
BLOCKS 12: Submission due 30 calendar days prior to TRR.
BLOCK 14: All data shall be delivered on CD/DVD to the below address.
BLOCK 14 Address:
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, MD 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
SESS
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
B003
2. TITLE OF DATA ITEM
Training Program Structure Document
3. SUBTITLE
Maintenance Training Plan
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81521B (see block 16)
5. CONTRACT REFERENCE
SOW, para 3.2
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
See block 16
8. APP CODE
A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
BLOCK 4: Learning Objectives (LO) data shall include information related to the design of training courses. Only paragraph 2.3 of DI- SESS-81521B applies.
Block 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government approval/disapproval will occur no later than 15 calendar days after incorporation of comments by the contractor.
Block 12, 13: Submission due 30 calendar days before TRR.
Block 14: All data shall be delivered on CD/DVD to the below address.
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, MD 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
SESS
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
B004
2. TITLE OF DATA ITEM
Interactive Computer Aided Provisioning System (ICAPS) Data Exchange
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ALSS-81545 (See Blk 16)
5. CONTRACT REFERENCE
SOW Para 4.
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: MS Excel format is required.
BLOCK 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government approval/disapproval will occur no later than 15 calendar days after incorporation of comments by the contractor.
Block 12: Submission due 30 calendar days prior to TRR.
Block 14: All data shall be delivered on CD/DVD to the below address.
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, Md 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
SESS
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
B005
2. TITLE OF DATA ITEM
Source Data for forcasting Diminishing Manufacturing Sources and Material Shortages
(DMSMS)
3. SUBTITLE
Diminishing Manufacturing Sources
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81656
5. CONTRACT REFERENCE
SOW Para: 4.2
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
BLOCKS 11, 12, & 13: All documents must be completed and delivered to the Government 90 calendar days after TRR.
BLOCK 14: All data shall be delivered on CD/DVD to the below address.
BLOCK 14 Address:
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, MD 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY
SESS
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
B006
2. TITLE OF DATA ITEM
Request for Nomenclature (DD Form 61)
3. SUBTITLE
Nomenclature
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81254B
5. CONTRACT REFERENCE
SOW Para: 4.3
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
BLOCKS 12: Submission due 90 calendar days after contract award.
BLOCK 14: All data shall be delivered on CD/DVD to the below address.
BLOCK 14 Address:
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, MD 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C
C. CATEGORY
PS
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
C001
2. TITLE OF DATA ITEM
Training Conduct Support Document
3. SUBTITLE
Training Lesson Plan
4. AUTHORITY (Data Acquisition Document No.)
DI-PSSS-81523C
5. CONTRACT REFERENCE
SOW Para: 3.2
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
BLOCK 4: Only paragrpah 2.2 of DI-PSSS-81523C applies.
BLOCK 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government approval/disapprove will occur no later than 15 calendar days after incorporation of comments by the contractor.
BLOCKS 10, 11, 12, & 13: Submission due 30 calendar days prior to
TRR.
BLOCK 14: All data shall be delivered on CD/DVD to the below address.
BLOCK 14 Address:
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, MD 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C
C. CATEGORY
PS
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
C002
2. TITLE OF DATA ITEM
Training Conduct Support Document
3. SUBTITLE
Trainee Guide
4. AUTHORITY (Data Acquisition Document No.)
DI-PSSS-81523C
5. CONTRACT REFERENCE
SOW Para: 3.2
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
BLOCK 4: Only paragrpah 2.3 of DI-PSSS-81523C applies.
BLOCK 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government approval/disapproval will occur no later than 15 calendar days after incorporation of comments by the contractor.
BLOCKS 10, 11, 12, & 13: Submission due 30 calendar days prior to
TRR.
BLOCK 14: All data shall be delivered on CD/DVD to the below address.
BLOCK 14 Address:
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, MD 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C
C. CATEGORY
PS
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
C003
2. TITLE OF DATA ITEM
Training Conduct Support Document
3. SUBTITLE
OJT Handbook
4. AUTHORITY (Data Acquisition Document No.)
DI-PSSS-81523C
5. CONTRACT REFERENCE
SOW Para: 3.2
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A
D 11. AS OF DATE
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
BLOCK 4: Only paragrpah 2.4 of DI-PSSS-81523C applies.
BLOCK 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government approval/disapproval will occur no later than 15 calendar days after incorporation of comments by the contractor.
BLOCKS 10, 11, 12, & 13: Submission due to the Government 30 calendar days prior to TRR.
BLOCK 14: All data shall be delivered on CD/DVD to the below address.
BLOCK 14 Address:
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, MD 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY
MISC
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
D001
2. TITLE OF DATA ITEM
Guide to the General Style and Format of U.S.
Navy Work Package Technical Manuals
3. SUBTITLE
Technical Manuals for DoN and
DAF
4. AUTHORITY (Data Acquisition Document No.)
MIL-HDBK-3001(AS)
5. CONTRACT REFERENCE
SOW Para: 4.1
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
BLOCK 8: The Government will have 25 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government approval/disapproval will occur no later than 15 calendar days after incorporation of comments by the contractor.
BLOCKS 12, & 13: Submission due 90 calendar days after TRR.
BLOCK 14: All Data shall be delivered on CD/DVD to the below address.
BLOCK 14 Address:
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, MD 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY
MISC
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
D002
2. TITLE OF DATA ITEM
Technical Report - Study/Services
3. SUBTITLE
Facilities Requirements Document
(FRD)
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW, para 6.
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
90DAC
8. APP CODE
A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
BLOCK 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government approval/disapproval will occur no later than 15 calendar days after incorporation of comments by the contractor.
BLOCK 10: Submission due 90 calendar days after contract award.
BLOCK 14: All data shall be delivered on CD/DVD to the below address.
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, MD 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
1020, 1021, 2020, 2021, 3020, 3021, 4020, 4021, 5020, 5021, 6020, 6021, 7020, 7021
B. EXHIBIT
D
C. CATEGORY
MISC
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
D003
2. TITLE OF DATA ITEM
Technical Report - Study/Services
3. SUBTITLE
Site Survey Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW, para 6.
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
BLOCK 8: The Government will have 15 calendar days for review and comment. The Contractor will have 5 calendar days to incorporate Government comments. Subsequent Government approval/disapproval will occur no later than 5 calendar days after incorporation of comments by the contractor.
BLOCK 10, 12: Site Survey Reports for Site Surveys ordered shall be delivered no later than 150 days after order award.
BLOCK 14: All data shall be delivered on CD/DVD to the below address.
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, MD 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY
MISC
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
D004
2. TITLE OF DATA ITEM
Department Of Defense Standard Practice:
Technical Manual Preparation
3. SUBTITLE
Technical Manuals for DA
4. AUTHORITY (Data Acquisition Document No.)
MIL-STD-40051B(3)
5. CONTRACT REFERENCE
SOW Para: 4.1
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
BLOCK 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government approval/disapproval will occur no later than 15 calendar days after incorporation of comments by the contractor.
BLOCKS 12, & 13: Submission due 90 calendar days after TRR.
BLOCK 14: All Data shall be delivered on CD/DVD to the below address.
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, MD 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
E
C. CATEGORY
NDTI
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
E001
2. TITLE OF DATA ITEM
First Article Qualification Test Plan and Procedures
3. SUBTITLE
Test Plan and Procedures
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-81307A
5. CONTRACT REFERENCE
SOW Para: 7.1
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
BLOCK 8: The Government will have 30 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government approval/disapproval will occur no later than 15 calendar days after incorporation of comments by the contractor.
BLOCKS 10, 11, 12, & 13: Submission due 60 calendar days prior to
TRR.
BLOCK 14: All data shall be delivered on CD/DVD to the below address.
BLOCK 14 Address:
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, MD 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
E
C. CATEGORY
NDTI
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
E002
2. TITLE OF DATA ITEM
Test/Inspection Report
3. SUBTITLE
First Article Unit Test Report
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B (See Block 16)
5. CONTRACT REFERENCE
SOW Para 7.1, 8
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Documentation shall be delivered in Microsoft Office or Adobe Acrobat compatible digital media.
Block 8: The Government will have 15 calendar days for review and comment. The Contractor will have 15 calendar days to incorporate Government comments. Subsequent Government approval/disapproval will occur no later than 15 calendar days after incorporation of comments by the contractor.
Blocks 10, 12 & 13: Submissions due no later than 30 days after completion of first article test.
Block 14: All data shall be delivered on CD/DVD to the below address.
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, Md 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
E
C. CATEGORY
QCIC
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
E003
2. TITLE OF DATA ITEM
Acceptance Test Plan
3. SUBTITLE
Production Acceptance Test Plan
4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-80553A (See Block 16)
5. CONTRACT REFERENCE
SOW Para 7.2
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Documentation shall be delivered in Microsoft Office or Adobe Acrobat compatible digital media.
Block 8: Government comments due 15 calendar days after submission. The Contractor shall have 15 calendar days to incorporate Government comments. Subsequent Government approval/disapproval will occur no later than 15 calendar days after incorporation of comments by the Contractor.
Block 10,12, 13: Submission due 45 calendar days after the First Article Unit TRR.
Block 14: All data shall be delivered on CD/DVD to the below address.
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, Md 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
E
C. CATEGORY
NDTI
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
E004
2. TITLE OF DATA ITEM
Test/Inspection Report
3. SUBTITLE
Production Unit Test/Inspection Report
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B (See Block 16)
5. CONTRACT REFERENCE
SOW Para 7.2
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Documentation shall be delivered in Microsoft Office or Adobe Acrobat compatible digital media.
Blocks 10, 12 & 13: Submissions due concurrent with the delivery of each production unit.
Block 14: All data shall be delivered on CD/DVD to the below address.
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, Md 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
F
C. CATEGORY
ADMN
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
F001
2. TITLE OF DATA ITEM
Information Systems Accreditation Documentation
3. SUBTITLE
Information Assurance Accreditation Documentation
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-80239
5. CONTRACT REFERENCE
SOW Para: 8
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONCE
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
BLOCKS 11, 12, & 13: Submission due 30 calendar days prior to
TRR.
BLOCK 14: All data shall be delivered on CD/DVD to the below address.
BLOCK 14 Address:
Naval Air Traffic Management Systems Program Office Data Manager Building 2110 48488 Gammill Road Patuxent River, MD 20670
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
F
C. CATEGORY
ADMN
D. SYSTEM/ITEM
PAR COTS
E. CONTRACT/PR NO.
N68335-14-P1-PMA-213-0141
F. CONTRACTOR
1. DATA ITEM NO.
F002
2. TITLE OF DATA ITEM
Conference Agenda
3. SUBTITLE
Meeting/Conference Agenda
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81249A
5. CONTRACT REFERENCE
SOW Para 9.2, 9.3
6. REQUIRING OFFICE
PMA-213
7. DD 250
REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
Ses Block 16
8. APP CODE
N/A
D 11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 10,12,13: Submission due 7 calendar days prior to scheduled meeting.
Block 14: Document shall be submitted electronically by email to addressees shown.
PMA213H1
AIR 2.5.2
DCMA
15. TOTAL
G. PREPARED BY
Scott Potas
H. DATE
5/28/2015
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
F
C. CATEGORY
ADMN
D.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .