This document contains an amendment to a solicitation and statement of work for crash and salvage cranes. The Navy intends to procure the Carrier Crash and Salvage Crane and Amphibious Crash and Salvage Crane through a full and open request for proposal as an indefinite delivery indefinite quantity contract with a minimum of one engineering development model of each crane to be purchased on the first delivery order. The contract will have production orders over three years for up to 14 of each crane type. The cranes will be used on aircraft carriers and amphibious assault ships and are expected to be in service for 25 years. They must meet reliability, maintainability, supportability, shock, vibration, environmental, EMI, mobility and human factors requirements. Offerors must be registered in SAM and proposals will be evaluated on technical, experience, past performance and price factors.
Amendment 0001
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
1. The following are questions received by this Agency and our answers:
| Question # |
| REFERENCE |
| SUBJECT |
| QUESTION |
| GOVERNMENT RESPONSE |
| 1 |
| CDRL E001 |
| DI-MGMT-81398B |
| Superseded by DI-MGMT 81398C 6-19-2014 |
| CDRL revised to reflect latest revision of DID. |
| 2 |
| CDRL E002 |
| DI-MISC-81397B |
| Superseded by DI-MISC-81397C 6-19-2014 |
| CDRL revised to reflect latest revision of DID. |
| 3 |
| CDRL E003 |
| DI-SAFT-80101B |
| Superseded by DI-SAFT-80101C 6-12-2015 |
| CDRL revised to reflect latest revision of DID. |
| 4 |
| CDRL E004 |
| DI-RELI-81497A |
| Superseded by DI-SESS-81497A 12-19-2014 |
| CDRL revised to reflect latest revision of DID. |
| 5 |
| CDRL E004 |
| DI-RELI-81496A |
| Superseded by DI-SESS-81496A 12-19-2014 |
| CDRL revised to reflect latest revision of DID. |
| 6 |
| CDRL T004 |
| DI-NDTI-80809A |
| Superseded by DI-NDTI-80809B 1-24-1997 |
CDRL revised to reflect latest revision of DID.
| 7 |
| CDRLT009 |
| Block 16: DI-R-21597 |
| DID reference is incomplete |
| The DID reference in block 16, DI-R-21597 is correct. |
| 8 |
| CDRL L001 |
| DI-SESS-81759B |
| Cannot locate this DID; should it be DI-SESS 81758A? 5-22-2013 |
| CDRL revised to reflect latest revision of DID. |
| 9 |
| CDRL L002 |
| DI-SESS-81758B |
| Cannot locate this DID, should it be DI-SESS 81758A ? 5-22-2013 |
| CDRL revised to reflect latest revision of DID. |
| 10 |
| CDRL L010 |
| DI-SESS-81522B |
| Superseded by DI-PSSS-81522C 11-20-2014 |
| CDRL revised to reflect latest revision of DID. |
| 11 |
| CDRL L011 |
| DI-SESS-81003D |
| Superseded by DI-SESS-81003E 2-26-2013 |
| CDRL revised to reflect latest revision of DID. |
| 12 |
| CDRL L015 |
| DI-SESS-81518B |
| Superseded by DI-SESS-81518C 12-17-2013 |
| CDRL revised to reflect latest revision of DID. |
| 13 |
| Sec L 2.0, CDRL P001 |
| IMS Format submission |
| Section L states that 11x17 pages can be used for submission of the IMS. |
CDRL P001/ DI-MGMT-81861A, 2.2.5 "Format 6 shall be submitted in the contractors native IMS schedule file format. (Microsoft Project as required by P001).
Because of the size and complexity of the IMS, printing out the IMS is impractical considering the project covers approximately 5 years.
Request the government allow the IMS to be submitted electronically on a separate CD only.
Section L requirements address the format required for the proposal, not the monthly deliverable after contract award. For the proposal, the IMS can be submitted on pages up to 11 x 17. There is no page limit for the IMS submitted as part of the proposal. After contract award the IMS is required to be submitted in MS project format by uploading to a secure shared web site as stated in SOW para 3.6 and CDRL P001.
| 14 |
| CDRL L007 |
| DI-MGMT-81650 |
Training IMS format submission
(1) The DI requires the use of COTS software (Microsoft Project)
SOW 4.5.1 states that the government will provide the “initial template” prior to the Training KOM, but does not provide a date (KOM min XX days) to allow the contractor to prepare the Training IMS for submission 10 days prior to the KOM and for inclusion in the Program IMS
Request the government provide a planning factor for IMS development.
(2) CDRL block 14 requires submission via secure on-line access.
What is the secure system that the contractor must use for this report?
(3) 2.2 Summary Master Schedule -Does the government require an IMP to be submitted?
1 – The Government will provide the initial template early enough to allow sufficient time for the contractor to develop and submit the Training IMS. Specific timeframes will be discussed at the Logistics Guidance Conference which is planned to be held 60 days after contract award.
2 - The requirement for a secure shared wed site established by the contractor is stated in SOW para 3.6
3 – An IMP is not required.
| 15 |
| Sec L, 3.0 |
| Does the list of acronyms, count towards the page total since it is not listed? |
| If a list of acronyms is provided as part of the proposal then it will be included in the page limit for the appropriate volume. |
| 16 |
| Sec L ,Part A, 3.0 |
| Vol II Experience -page count |
| Request the government increase the page count to a minimum of 20 pages to enable the contractor to address all the requirements of Sec L, Part B, 2.0 Experience for each company |
| The Government has reviewed this requirement and determined that the limit of 10 pages for Volume II – Experience is adequate. |
| 17 |
| Sec L, Part B, 3.0 |
| Past Performance |
| How many relevant contracts should be provided for critical team members? |
| As many as are necessary to clearly explain the past performance of the critical team members while not exceeding the page limit of this volume. |
| 18 |
| Sec L, Part A, 3.0 |
Sec L, Part B, 3.0
| Past Performance – page count |
| Request the government increase the page count to 30 pages. |
| The Government has reviewed this requirement and determined that the limit of 10 pages for Volume III – Past Performance is adequate. |
| 19 |
| Sec L, Part B, 4.3 |
Sec M, 4.0
DFAR 5252.216-9506
| Unit quantities |
| DFAR 5252.216-9506 shows a maximum of 14 units each CCSC and ACSC including LRIP. |
Sec L, Part B, 4.3 is the requirements for developing the Price Matrix to determine the total evaluated price.
Question: ACSC: CLIN 0088-0090 is 12 units; CLIN 0008 is 1 unit for a total of only 13 units. Is this correct?
Section L, Part B, 4.3 defines the method to be used to provide a total overall price and doesn’t necessarily reflect the maximum quantities that can be procured on the contract.
The contract minimum and maximum quantities are identified in NAVAIR Clause 5252.216-9506.
| 20 |
| RFP Section I |
| FAR52.232-16 and Alt 1, Progress Payments |
| How will the milestones for progress payments be determined? |
| Once the Government makes its source selection decision, the Government will engage the apparent successful Offeror in discussions with respect to progress payments or performance based payments being the appropriate method of contract financing. For additional information we suggest you contact your DCMA Administration Office for further details on how they implement progress payment financing. |
| 21 |
| SOW 3.4 Quality Assurance Program |
| Quality Assurance Representative (QAR) |
| Will DCMA have a QAR on site for the duration of the contract performance and does the contractor have to provided office space, and administrative support? |
| Office space is not anticipated for a DCMA representative. The Government recommends contacting the local DCMA office to see how the scheduling of inspection/acceptance and transportation are handled. |
| 22 |
| SOW 3.2.2.8 |
| Physical Configuration Audit (PCA) |
| Is the LRIP unit of each type considered the first production unit for scheduling the PCA/TIM? |
| The refurbished LRIP is not considered the first production unit for the purposes of the PCA/TIM. |
| 23 |
| CDRL L001 |
| Block 13 |
| PTD is not defined |
| Provisioning Technical Documentation (PTD) is defined in SOW para 4.3.9 which is referenced in L001. |
| 24 |
| CLIN 0019 |
CLIN 0020
| SOW 3.2.1 |
| Can the IMS for the CCSC and ACSC be combined into one IMS since many of the management actions and TIMS are joint efforts? |
If combined, recommend changing CLIN 0019 to read: CCSC and ACSC, and eliminate CLIN 0020
As stated in Section L, Part B, para 4.3.b if information provided in the Technical volume supports providing a single solution the pricing across the CLINs should reflect this commonality accordingly.
| 25 |
| CLIN 0059 |
CLIN 0060
| SOW 4.5.1 |
| Can the IMS for the CCSC and ACSC be combined into one Training IMS since many of the management actions and KOK is a single meeting? |
If combined, recommend changing CLIN 0059 to read: CCSC and ACSC, and eliminate CLIN 0060
As stated in SOW para 4.5.1 the Training IMS is a subset of the Program IMS (P001), but shall be managed and maintained as a standalone document to support the requirements of CDRL L007. However, as stated in Section L, Part B, para 4.3.b if information provided in the Technical volume supports providing a single solution the pricing across the CLINs should reflect this commonality accordingly, so CLINs 0059 and 0060 could be combined
| 26 |
| CLIN 0001 |
CLIN 0002
| EDM units |
| What is the disposition of the EDM units after contractor testing is complete? |
Who owns the EDM units after contractor testing is complete?
The Government owns the EDM units after contractor testing is complete and will decide at that time where the units will be shipped to.
Contractor will be responsible for maintaining the EDMs at the Contractor’s facility until shipping is determined for the EDM units.
2. The Statement of Work (SOW) has been revised to reflect the changes listed above and is attached.
(End of Summary of Changes)