Q and A.docx

DOCX document 25 KB Posted

Attached to
Fuel Hauling Services Guam Federal contract opportunity
Solicitation number
N6824624Q0002
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document contains questions and answers related to solicitation number N6824624Q0002 for fuel hauling services in Guam. The solicitation is for an indefinite-delivery, indefinite-quantity multiple award contract with a base period of performance starting on January 1, 2024 for five years. Fuel will be loaded into single or multiple compartment tanker trucks that meet DOT regulations using bottom loading via a scully system with 2-inch camlocks or single point refueling nozzles. Delivery sites will require various hose lengths, pump rates, and nozzle types which will be provided to the contractor. Delay charges may apply if loading takes over eight hours. The Navy will flush tanks for a cost. Contractors must be USCG approved for over water transfers prior to the first delivery.

View the file

Other files for this federal contract opportunity

Other files attached to Fuel Hauling Services Guam, newest first.
File Type Posted
Attachment (2) QASP Services.doc DOC document
Attachment (a) Quotation Sheet.xlsx XLSX spreadsheet
Attachment (b) 52.212-2 Evaluation.docx DOCX document
Attachment (c) Addendum to 52.212-1.docx DOCX document
Attachment (1) PWS - Fuel Hauling.docx DOCX document
Attachment (3) Service Contract Act WD 2015-5693 Rev 19.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. What dates do the performance periods start and end for each award year?

Answer: The ordering period will be for a total of five years from the date of award of the base IDIQ(s). The base IDIQ will be awarded for a POP start date of 01JAN2024.

2. Is there a set mobilization time frame and start date for mobilization and performance period?

Answer: POP is the mobilization time.

3.Section C1a
a.Does this work require a multiple compartment tank or is single compartment tank acceptable?

Answer: This is up to the contractor. As long as the tanker truck meets DOT regulations, it will be authorized to load.

b. Please provide pump rate, cam lock size, length of hose, and nozzle type requirements for all delivery sites and equipment.

Answer: This may vary depending on the vessel being loaded. Normally it is will be a 2" camlock fitting or a single point refueling nozzle. Contractor will be responsible for providing the correct fittings. The government will assist as needed and will ask the vessel for the type of fittings used. Once that information is received, the government will relay to the contractor.

4.Section C1 b and C2c
a.Is a scully used at the load site?

Answer: We do have scully system at our loading racks. There is a scully system at the loading facility. The contractor will be required to use the scully. If the scully system is not operational, other measures will be implemented to ensure the safe loading of the truck.

b. Bottom or top loading?

Answer: Bottom loading

c. Will the contractor be the only vendor fueling at this one site and if so does the time frame of 8 hours to complete the work for larger orders apply if we are delayed due to waiting time for other vendors or DOD fuel loading at this site?

Answer: Coordination will be done at the Defense Fuel Support Point (DFSP) Guam level. The DFSP has the capacity to load one truck at a timer per loading rack. The DFSP has four total loading racks available. Delay charges are addressed in the PWS under C.3 Delay Charges. The contractor will need to notify the contracting officer representative (COR) if they are being delayed. Once the COR is notified, the “clock” starts and a government representative will be sent to investigate the cause of the delay.

5.Section C2f
a.We are delivering to multiple sites that may have different unloading conditions and requirements such as fill /drop rates (gallons/minute) pump requirements, hose length, cam lock connection, and nozzle requirements.
i.Please provide the above information for all delivery sites.

Answer: This varies depending on the site. Normally, a 2" camlock and a single point refueling nozzle will suffice. However, there may be conditions where different connections are required. The customer will provide information on the type of fitting they require. That information will be relayed to the contractor prior to loading the trucks.

6.Section C4b3
a.Please provide the estimated cost for the DOD to flush the tank truck.

Answer: The cost will vary depending on the amount/type of product left in the truck.

7.Section C4d7
a.By what time from does the Contractor have to be a united states coast guard (USCG) approved mobile bulk facility, for over water transfers?

Answer: Prior to the first delivery.