Attachment (2) QASP Services.doc

DOC document 68 KB Posted

Attached to
Fuel Hauling Services Guam Federal contract opportunity
Solicitation number
N6824624Q0002
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for fuel hauling services on Guam. The QASP outlines critical performance processes including timely and accurate completion of all contract and task order requirements. Performance will be measured on schedule adherence, deliverable requirements, past performance, and invoice accuracy on a monthly, quarterly and annual basis. Acceptable performance is defined as meeting all requirements in a satisfactory manner. Failure to meet performance standards could result in termination of the contract or task order and loss of future opportunities. The related federal contract opportunity is a solicitation for fuel hauling services on Guam issued by the Department of the Navy Naval Supply Systems Command.

View the file

Other files for this federal contract opportunity

Other files attached to Fuel Hauling Services Guam, newest first.
File Type Posted
Q and A.docx DOCX document
Attachment (a) Quotation Sheet.xlsx XLSX spreadsheet
Attachment (b) 52.212-2 Evaluation.docx DOCX document
Attachment (c) Addendum to 52.212-1.docx DOCX document
Attachment (1) PWS - Fuel Hauling.docx DOCX document
Attachment (3) Service Contract Act WD 2015-5693 Rev 19.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment (2) QASP Services

QUALITY ASSURANCE SURVEILLANCE PLAN

Purpose: To ensure that the Government has an effective and systematic method of surveillance for the services in the PWS. The QASP will be used primarily as a tool to verify that the contractor is performing all services required by the PWS in a timely, accurate and complete fashion.

1.

Critical performance processes and requirements. Critical to the performance of Fuel Hauling Services Various Locations & Remote Sites on Guam is the timely, accurate and thorough completion of all contract/task order requirements.

2.

Performance Standards a.

Schedule - The due dates for deliverables and the actual accomplishment of the schedule will be assessed against original due dates and milestones established for the contract or task order(s).

b.

Deliverables – The deliverables required to be submitted will be assessed against the specifications for the deliverables detailed in the contract/task order(s) and the Quality Control Plan (QCP), if required by the contract, for the required content, quality, timeliness, and accuracy.

c.

Past Performance - In addition to any schedule, deliverables, and cost aspects of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship, the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.

3.

Surveillance methods: The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to, random or planned sampling, periodic or inspection, and validated customer complaints.

4.

Performance Measurement: Performance will be measured in accordance with the following table:

Performance Element
Performance Requirement
Surveillance Method
Frequency
Acceptable Quality Level
Contractor Quality Control Plan
QC activities, inspections, and corrective actions completed as required by the plan.
Inspection by the COR
Quarterly for overall QC activities;
100% Compliance with the contractor plan.

As Required for corrective actions.

(If required by the contract)

Contract Deliverables
Contract deliverables furnished as prescribed in the PWS, attachments, CDRLs, Task Orders, etc., as applicable.
Inspection by the COR
100% inspection of all contract deliverables.
>95% of deliverables submitted timely and without rework required.
Overall Contract Performance
Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the COR’s annual report on Contractor Performance
Assessment by the COR
Annual
All performance elements rated Satisfactory (or higher)
Invoicing
Monthly invoices per contract procedures are timely and accurate.
Review & acceptance of the invoice
Monthly
100% accuracy

If performance is within acceptable levels, it will be considered to be satisfactory. If not, overall performance may be considered unsatisfactory.

Incentives/Disincentives:

The COR’s makes an annual report on Contractor Performance (CPARS or other annual report). The contractor’s failure to achieve satisfactory performance under the contract/task order, reflected in the COR’s annual report, may result in termination of the contract/task order and may also result in the loss of future Government contracts/task orders.

For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.

In accordance with the inspection of services provisions of the contract, the contractor will be incentivized to provide quality products in a timely manner since the Government can require the Contractor, at no additional cost, to replace or correct work that fails to meet contract requirements.

File details come from the government source that posted it. Updated .