This document appears to be Attachment 4 - SubHDR APG Spare Parts Price List Amendment 0003 related to a federal contract opportunity from the Department of the Navy's Naval Sea Systems Command.
The contract opportunity is for the Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) Code 34 "Submarine High Data Rate (SubHDR) Spares and Repairs" Indefinite Delivery/Indefinite Quantity (IDIQ) Contract. It is a follow-on to a previous contract with Serco, Inc. and includes services and supplies for the refurbishment and repair of the SubHDR Antenna Pedestal Group (APG) and Mast Group (MG) Line Replaceable Units (LRUs), system engineering failure analysis, test station design, upgrades, maintenance, testing, and configuration management.
The contract opportunity has a maximum 10-year ordering period, broken into five 2-year ordering periods. It is solicited as unrestricted under NAICS code 334511, with Firm-Fixed-Price, Cost-Plus-Fixed-Fee, Cost Reimbursement, and Not Separately Priced contract line items anticipated. The Attachment 4 document provides a detailed price list for 113 spare parts associated with the SubHDR APG, including part numbers, descriptions, unit prices, quantity tiers, and delivery lead times.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6660424R0154 Amendment 0004.pdf | ||
| N6660424R0154 Amendment 0004.pdf | ||
| N6660424R01540003.pdf | ||
| N6660424R0154 Amendment 0002.pdf | ||
| Attachment 4- SubHDR APG Spare Parts Price List. Amendment 0001.xlsx | XLSX spreadsheet | |
| Attachment 9- NUWCDIVNPT Cost Proposal Spreadsheet Amendment 0001.xlsx | XLSX spreadsheet | |
| N6660424R0154 Amendment 0001.pdf | ||
| 2. Attachment 4- SubHDR APG Spare Parts Price List.xlsx | XLSX spreadsheet | |
| 4. Attachment 10- Staffing Plan.xlsx | XLSX spreadsheet | |
| 1. Solicitation N66604-24-R-0154.pdf | ||
| 3.Attachment 9- NUWCDIVNPT Cost Proposal Spreadsheet.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ordering Period 1
| ID # | Part Number | Description | FOB | Government's | ||||
| Year 1 Unit Price, | Year 1 Unit Price, | Year 2 Unit Price, | Year 2 Unit Price, | Threshold | ||||
| QTY 1-5 | QTY 6-10 | QTY 1-5 | QTY 6-10 | Delivery Date | ||||
| After Date of | ||||||||
| Delivery Orde | ||||||||
| 1 | 40003 | Motor, Cross-Elevation - brush blocks | Origin | 15 weeks | ||||
| 2 | 40953 | Motor, Elevation - brush blocks | Origin | 15 weeks | ||||
| 3 | 41015 | Motor, Train - brush blocks | Origin | 15 weeks | ||||
| 4 | 6481-354029-1 | Resolver, Elevation Axis NESP | Origin | 40 weeks | ||||
| 5 | G225024-2 | Termination Waveguide | Destination | 15 weeks | ||||
| 7 | G649580-1 | Bearing, Angular Contact, Duplex, Elevation | Destination | 15 weeks | ||||
| 8 | G649581-1 | Bearing, Radial Contact, Elevation | Destination | 15 weeks | ||||
| 9 | G649582-1 | Resolver, Frameless | Destination | 15 weeks | ||||
| 10 | G649583-1 | Bearing, Angular Contact, 10", Train | Origin | 23 weeks | ||||
| 11 | G649584-1 | Bearing, Angular Contact, 8", Train | Origin | 23 weeks | ||||
| 12 | G649586-1 | Bearing Tapered Roller | Origin | 37 weeks | ||||
| 13 | G649640-1 | Motor, Train | Origin | 23 weeks | ||||
| 14 | G649666-1 | Motor, Elevation | Origin | 23 weeks | ||||
| 15 | G649686-1 | Resolver Mount Housing | Origin | 23 weeks | ||||
| 16 | G649688-1 | Motor, Cross-Elevation | Origin | 30 weeks | ||||
| 17 | G649692-1 | Housing XL RJ Mount | Origin | 30 weeks | ||||
| 18 | G649700-2 | Transmit Reject Filter | Origin | 30 weeks | ||||
| 19 | G651064-2 | TRANSFORMER,HIGH VOLTAGE, | Origin | 30 weeks | ||||
| 20 | G651065-2 | TRANSFORMER,HIGH VOLTAGE | Origin | 30 weeks | ||||
| 21 | G651578-1 | Power Module, H-Bridge | Origin | 15 weeks | ||||
| 22 | G651580-1 | DIVIDER ASSEMBLY | Destination | 60 weeks | ||||
| 23 | G651582-1 | JUMPER,SCULPTED | Destination | 60 weeks | ||||
| 24 | G651591-2 | Rectifier bridge | Destination | 60 weeks | ||||
| 25 | G706046-3 | Coupler, Direction | Destination | 60 weeks | ||||
| 26 | G706047-3 | Attenuator, Elec | Destination | 60 weeks | ||||
| 27 | G706049-2 | Filter, Bandpass | Destination | 60 weeks | ||||
| 28 | G706050-2 | Amplifier, RF | Destination | 15 weeks | ||||
| 29 | G706051-2 | Amplifier, RF-LNA | Destination | 15 weeks | ||||
| 30 | G706052-1 | Low Noise Amp, X-Band | Destination | 15 weeks | ||||
| 31 | G706054-2 | Isolator, RF | Destination | 60 weeks | ||||
| 32 | G706065-3 | Switch, RF (Logus Switch) | Origin | 78 weeks | ||||
| 33 | G706065-4 | Switch, RF (Logus Switch) | Destination | 60 weeks | ||||
| 34 | G706072-2 | Detector, RF same as DT7011P | Destination | 60 weeks | ||||
| 35 | G706309-1 | Detector, RF (Q-band) | Destination | 23 weeks | ||||
| 36 | G706348-1 | Upconverter, Q-Band (QUC) | Destination | 23 weeks | ||||
| 37 | G706616-1 | Motor, Antenna | Destination | 60 weeks | ||||
| 38 | G706617-1 | Bearing, Antenna | Destination | 60 weeks | ||||
| 39 | G706650-1 | Sensor, thermal | No pricing to be provided with basic contract proposal | Destination | 78 weeks | |||
| 40 | G707095-1 | Polarizer, Q-Band, Train | Origin | 60 weeks | ||||
| 41 | G708689-1 | Slip Ring, Resolver, Train | Origin | 15 weeks | ||||
| 42 | G709913-3 | Attenuator, Detector | Destination | 98 weeks | ||||
| 43 | G709914-3 | Coupler, Direction | Origin | 23 weeks | ||||
| 44 | G709916-2 | Circulator, Power | Origin | 15 weeks | ||||
| 45 | G709917-4 | Attenuator Detector | Destination | 60 weeks | ||||
| 46 | G709936-1 | Cable Assembly, Special Purpose, W2 | Destination | 60 weeks | ||||
| 47 | G709937-1 | Cable Assembly, Special Purpose, W1 | Destination | 60 weeks | ||||
| 48 | G709941-1 | Cable Assembly, Special Purpose W4 | Destination | 60 weeks | ||||
| 49 | G710339-50 | Subreflector, 5" | Origin | 15 weeks | ||||
| 50 | G710340-50 | Main Reflector | Origin | 15 weeks | ||||
| 51 | G710753-50 | Feedome | Origin | 15 weeks | ||||
| 52 | G733360-1 | Motor Mount Housing | Origin | 15 weeks | ||||
| 53 | G745252-50 | Purge Valve Housing | Origin | 15 weeks | ||||
| 54 | G745262-1 | Hermetic Connector | Origin | 15 weeks | ||||
| 55 | G745292-2 | Switch, 2:1 RF Trans. Line Coaxial | Origin | 15 weeks | ||||
| 56 | G745324-1 | Waveguide Assembly | N/A | N/A | ||||
| 57 | G745324-10 | Waveguide Assembly | N/A | N/A | ||||
| 58 | G745324-3 | Waveguide Assembly | N/A | N/A | ||||
| 59 | G745324-6 | Waveguide Assembly | N/A | N/A | ||||
| 60 | G745324-7 | Waveguide Assembly | N/A | N/A | ||||
| 61 | G745324-8 | Waveguide Assembly | Destination | 23 weeks | ||||
| 62 | G745324-9 | Waveguide Assembly | Origin | 15 weeks | ||||
| 63 | G745325-1 | Waveguide Assy, X-band | Destination | 60 weeks | ||||
| 64 | G745325-2 | Waveguide Assy, X-band | Destination | 15 weeks | ||||
| 66 | G759041-50 | Polarizer, Antenna | Destination | 15 weeks | ||||
| 67 | G759706-1 | Rotary Joint, Rect., Q-band | Destination | 15 weeks | ||||
| 68 | G759706-2 | Rotary Joint, Rect., Q-band | Destination | 15 weeks | ||||
| 69 | G759712-1 | Cable Assembly, W5 | Destination | 15 weeks | ||||
| 70 | G759817-50 | Waveguide, Elevation to Feed | Destination | 15 weeks | ||||
| 71 | G759818-50 | Waveguide, Cross Level to Elevation | Destination | 23 weeks | ||||
| 72 | G759819-50 | Waveguide, Train to Cross Level | Destination | 23 weeks | ||||
| 74 | G760112-2 | RF Coax Cable Assy | Origin | 23 weeks | ||||
| 75 | G760112-3 | Cable | Origin | 30 weeks | ||||
| 76 | G760112-4 | RF Coax Cable Assy | Origin | 30 weeks | ||||
| 77 | G760112-5 | Cable | Origin | 23 weeks | ||||
| 78 | G768063-1 | Waveguide Assy, blind mate | Origin | 23 weeks | ||||
| 79 | G768063-2 | Waveguide Assy, Blind Mate System | Origin | 23 weeks | ||||
| 80 | G768683-1 | Downconverter, RF, K-Band/SHF | Origin | 23 weeks | ||||
| 81 | G772281-1 | Cable Assembly Semi Rigid W8 | Origin | 23 weeks | ||||
| 82 | G772281-10 | Cable Assembly Semi Rigid | Origin | 23 weeks | ||||
| 83 | G772281-11 | Cable Assembly Semi Rigid | Origin | 23 weeks | ||||
| 84 | G772281-2 | Cable Assembly Semi Rigid | Origin | 23 weeks | ||||
| 85 | G772281-3 | Cable Assembly Semi Rigid | Origin | 78 weeks | ||||
| 86 | G772281-5 | Cable Assembly Semi Rigid | Origin | 30 weeks | ||||
| 87 | G772281-6 | Cable Assembly Semi Rigid | Destination | 30 weeks | ||||
| 88 | G772281-7 | Cable Assembly Semi Rigid | Destination | 30 weeks | ||||
| 89 | G772281-8 | Cable Assembly Semi Rigid | Destination | 30 weeks | ||||
| 90 | G775155-1 | Power Module, Downchopper | Destination | 30 weeks | ||||
| 91 | G780682-1 | Wiring Harness | Destination | 30 weeks | ||||
| 92 | H291476-1 | Attenuator, FXD, W/G | Destination | 30 weeks | ||||
| 93 | H293283-1 | Filter, WR42 | Destination | 30 weeks | ||||
| 94 | H309225-1 | Cable Assembly, RF, WR-B | Destination | 30 weeks | ||||
| 95 | H309225-2 | Cable Assembly, RF, WR-A | Destination | 30 weeks | ||||
| 96 | H309225-3 | Cable Assembly, RF, WR-C | Destination | 30 weeks | ||||
| 97 | H312937-3 | Capacitor | Destination | 78 weeks | ||||
| 98 | H313929-1 | Connector, EMI Filter | Destination | 15 weeks | ||||
| 99 | H388850-1 | Blockconverter, GBS Low noise Outboard | Destination | 15 weeks | ||||
| 100 | H388851-1 | Filter | Origin | 15 weeks | ||||
| 101 | H388852-1 | Oscillator (PLDRO) | Destination | 15 weeks | ||||
| 102 | H389894-1 | Connector System Elect. | Destination | 15 weeks | ||||
| 103 | H389894-2 | Connector System Elect. | Destination | 15 weeks | ||||
| 104 | H403349-1 | Cable Assembly W6 | Destination | 15 weeks | ||||
| 105 | H407277-1 | Rotary Joint Tri Channel | Destination | 15 weeks | ||||
| 106 | G745227 | Radome (NEW) | Origin | 78 weeks | ||||
| 107 | MP35N | STAINLESS STEEL BOLTS | Origin | 9 weeks | ||||
| 108 | 1000723 | MVPS Assy New | Origin | 30 weeks | ||||
| 109 | 1000296 | Xband SSA New Design | Origin | 15 weeks | ||||
| 110 | G707067-1 | Polyrod Mount | Destination | 15 weeks | ||||
| 111 | G707068-1 | X-Band polyrod | Origin | 15 weeks | ||||
| 112 | G707069-1 | Polyrod Clamp Note Need 2 | Origin | 15 weeks | ||||
| 113 | G710752-1 | Polyrod Nut | Destination | 15 weeks |