RFI 8_16.pdf

PDF 212 KB Posted

Attached to
Construction-B80 2nd Floor Interior Renovation Project Federal contract opportunity
Solicitation number
N6660421R0360
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document contains responses to questions regarding a federal construction solicitation. The solicitation is for interior renovations and repairs to rooms and stairs in Building 80 at Naval Sea Systems Command, including demolition, provision of conference rooms and restrooms. Minimum insurance requirements are identified in the solicitation, and bid, payment and performance bonds are required. ADA, building and fire permits are not needed for work on federal property, though task permits and compliance with ADA standards are the contractor's responsibility. Liquidated damages clauses are not included in the solicitation. Interested contractors must have an active CAGE code to receive drawings and specifications via Sam.gov or by email request with company and CAGE code information provided.

View the file

Other files for this federal contract opportunity

Other files attached to Construction-B80 2nd Floor Interior Renovation Project, newest first.
File Type Posted
B80 2nd Floor Upgrade Site visit 7_28.pdf PDF
RFI 8-13 Q_A.pdf PDF
RFI 8_12 Q_A.pdf PDF
Additional Photos of the Jobsite.pdf PDF
B80 2nd FLoor RFI Q-A.pdf PDF
Attachment 3 Past Performance Questionare.pdf PDF
N6660421R0360.pdf PDF
Attachment_4_ Covid Questionare.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Is Builders Risk required?

Answer: Minimum insurance requirements are identified in solicitation section C under C-228-H002, as well as Section I FAR clauses 52.228-5 and 52.228-7. Per the solicitation, bid, payment, and performance bonds are required.

2. Are ADA, building and fire department permits required? If yes, city or state?

Answer: ADA, building, and fire department permits are not required for work performed on Federal property. There are task permits required such as hot work permits and utility outage request forms the Contractor will be responsible for executing. The project work must meet ADA standards and compliance.

3. Any liquidated damages?

Answer: Liquidated damages clauses are not included in this solicitation.