RFI 8_16.pdf
PDF 212 KB Posted
- Attached to
- Construction-B80 2nd Floor Interior Renovation Project Federal contract opportunity
- Solicitation number
- N6660421R0360
About this file
This document contains responses to questions regarding a federal construction solicitation. The solicitation is for interior renovations and repairs to rooms and stairs in Building 80 at Naval Sea Systems Command, including demolition, provision of conference rooms and restrooms. Minimum insurance requirements are identified in the solicitation, and bid, payment and performance bonds are required. ADA, building and fire permits are not needed for work on federal property, though task permits and compliance with ADA standards are the contractor's responsibility. Liquidated damages clauses are not included in the solicitation. Interested contractors must have an active CAGE code to receive drawings and specifications via Sam.gov or by email request with company and CAGE code information provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B80 2nd Floor Upgrade Site visit 7_28.pdf | ||
| RFI 8-13 Q_A.pdf | ||
| RFI 8_12 Q_A.pdf | ||
| Additional Photos of the Jobsite.pdf | ||
| B80 2nd FLoor RFI Q-A.pdf | ||
| Attachment 3 Past Performance Questionare.pdf | ||
| N6660421R0360.pdf | ||
| Attachment_4_ Covid Questionare.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Is Builders Risk required?
Answer: Minimum insurance requirements are identified in solicitation section C under C-228-H002, as well as Section I FAR clauses 52.228-5 and 52.228-7. Per the solicitation, bid, payment, and performance bonds are required.
2. Are ADA, building and fire department permits required? If yes, city or state?
Answer: ADA, building, and fire department permits are not required for work performed on Federal property. There are task permits required such as hot work permits and utility outage request forms the Contractor will be responsible for executing. The project work must meet ADA standards and compliance.
3. Any liquidated damages?
Answer: Liquidated damages clauses are not included in this solicitation.