B80 2nd FLoor RFI Q-A.pdf

PDF 236 KB Posted

Attached to
Construction-B80 2nd Floor Interior Renovation Project Federal contract opportunity
Solicitation number
N6660421R0360
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document contains questions and answers regarding a federal construction contract solicitation for interior renovations to a building on a Navy base. The solicitation seeks demolition of existing finishes and construction of a 30-person conference room, 12-person conference room, and two handicapped accessible restrooms. Questions covered topics such as dimensions, waste piping routing, pricing structure, roof warranty requirements, hazardous material removal, and need for temporary facilities. The responses clarified contract requirements, scope of work details, and specifications.

View the file

Other files for this federal contract opportunity

Other files attached to Construction-B80 2nd Floor Interior Renovation Project, newest first.
File Type Posted
B80 2nd Floor Upgrade Site visit 7_28.pdf PDF
RFI 8_16.pdf PDF
RFI 8-13 Q_A.pdf PDF
RFI 8_12 Q_A.pdf PDF
Additional Photos of the Jobsite.pdf PDF
Attachment 3 Past Performance Questionare.pdf PDF
N6660421R0360.pdf PDF
Attachment_4_ Covid Questionare.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Reference drawing AD101 Please verify that below the 2nd Floor Work Area A4/AD101, is the Basement A4/AD102. Also, can we assume the dimension from the 2nd Floor to Basement is 14’?

Yes, below the 2nd Floor Work Area A4/AD101, is the Basement A4/AD102. The Basement floor level to 2nd Floor level is approximately 13 feet. The 2nd Floor level to roof level is approximately 15 feet.

2. Reference drawing P-101 Note that Waste pipe drop is exposed in the Basement Corridor C3. Could we penetrate the Restroom B08 and run the Waste pipe drop in corner of stall 1? This would hide the drop and minimize the cut and patch of floor to Restroom and nothing in Corridor. Please advise if you agree?

The through floor core penetration for the new 4” waste pipe needs to be within the limits of the 2nd Floor Wet Wall located between Restrooms 206 and 207, which will likely be within the basement level Corridor C3 as shown. For the purposes of bidding, please use the pipe routing as shown on sheet P-101.

3. Reference Solicitation, Offer and Award; Section B; Item No. 002 What dollar value are we to include? Please explain what is meant by “NOT SEPERATELY PRICED”. Not Separately Priced (NSP) means that the unit price for the NSP CLIN 0002 is included in the unit price of CLIN 0001.

4. Reference drawings MD101, M-101 and S-502 MD101 Demolition Work Keynote 1 – Are we to include the removal of EF-8 and EF-9? Are we to include roof patch if EF’s are removed? Does roof have warranty, and if yes you do we need to contact for roof patch? Please advise. Removal of EF-8 and EF-9 are included within the scope of this Contract work. Yes, roof patching is required at remaining roof openings. Yes, the roof has a warranty and all roof work must be coordinated and accepted by existing Roofing Warrantee Company. Reference Architectural Roof Notes on Sheet S-502 for additional information.

5. M-101 New Work Keynotes 1+2, and drawing S-502 – Does roof have warranty, and if yes you do we need to contact for roof patch? Please advise. Yes, the roof has a warranty and all roof work must be coordinated and accepted by existing Roofing Warrantee Company. Reference Architectural Roof Notes on Sheet S-502 for additional information.

6. Reference drawing A-101 Keynote 4 is noted in Room 209. Are we to include the exterior wall? Yes, please include the exterior wall in room 209.

Should we be including Keynote 4 on exterior walls of Room 208? Yes, please include Keynote 4 for existing walls within room 208.

7. Reference drawings H-101 and AD101 Removal Keynote 4/H-101 (1’x1’ asbestos) is noted in Rooms 208 and 209. Removal Keynote 1/AD101 (2’x4’) is noted in Rooms 208 and 209. Are we to assume that the 1’x1’ tile is above the 2’x4’ tile. Please advise. Yes the 1’x1’ Asbestos ceiling tiles are located above the 2’x4’ ceiling tiles.

Removal Keynote 1/H-101 (9”x9” asbestos) is noted in Rooms 205, 208 and 209. Removal Keynote 2/AD101 (2’x2) is noted in Rooms 205, 208 and 209. Are we to assume that the 9”x9” tile is beneath the 2’x2’ tile. Please advise. Yes, the 9”x9” Asbestos floor tiles are located beneath the 2’x2’ carpet tiles.

8. Reference drawing AD101 Existing Keynote 5 reference drawing PD101. We seem to be missing drawing. Please advise.

The drawing “PD101” is a typographical error and does not exist. Instead the note should reference drawing “P-101.”

9. Reference drawing AD102 Existing Keynote 2 notes partition to be GWB. However Removal Keynote 2 notes partition to be CMU. Please advise. The existing Keynote 2 is correct and the Removal Keynote 2 is in error.

Removal Keynote 2 should read, “REMOVE PORTION OF WALL AS NECESSARY TO PROVIDE ACCESS TO

EXISTING SEWER PIPE. PATCH WALL AND PAINT TO MATCH ADJACENT SURFACES.”

10. Are we to include any Temporary Facilities (electrical, HVAC, water, etc.) in our bid? Please advise.

No temporary facilities are anticipated within this Contract. Any additional facilities required by the Contractor, other than what is available within the building, shall be provided by the Contractor. The building will remain in operation during the entire construction period. Reference General notes on sheet G-101, and the project specification for additional information.

11. Reference drawing S-502 Partial Roof Plan Noting “asbestos containing material” in the existing 5 ply built up roof system beneath the existing EPDM roof membrane. I do not see this listed or noted in the HazMat information given. Please advise if it’s missing. The note on drawing S-502 indicating ACM in the built up roofing is correct. The ACM in the roofing was not identified within the HazMat information provided; however, it is assumed to contain ACM. Please reference sheet H-101 for additional information.