Requirements_Revised.pdf
PDF 129 KB Posted
- Attached to
- Hydraulic Power Plant Federal contract opportunity
- Solicitation number
- N6660420R0864
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Hydraulic Power Plant Specification Document_20200731.pdf | ||
| MIL-PRF-17672E.pdf | ||
| MIL-PRF-28800F.pdf | ||
| Heat Exchanger Data Sheet.pdf | ||
| VISITOR REQUEST INFO NEEDED 05_2020.pdf | ||
| Visitor Request Info Needed.docx | DOCX document | |
| Industry Questions with Answers_17APR2020.docx | DOCX document | |
| Industry Questions with Answers.docx | DOCX document | |
| Requirements.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hydraulic Power Plant
1. Background
The Naval Undersea Warfare Center Division Newport (NUWCDIVNPT), Code 153, requires a Hydraulic Power Plant (System) to replace a legacy unit in the OA-9070B Towed
Array Handler Land Based Test Facility (OA-9070B LBTF) located at NUWCDIVNPT. The hydraulic power plant provides power to two radial piston motors in the OA-9070B LBTF.
2. Scope
2.1. This specification establishes the performance and acceptance requirements for the
Hydraulic Power Plant (hereafter referred to as “the system”).
3. Government Furnished Materials
3.1. Government Documents
3.1.1. The following documents form a part of the specification to the extent specified herein.
3.1.2. The Government will provide copies of government specifications, standards, drawings, and publications required by offerors in connection with this requirement.
3.1.3. Specifications:
ISO 4413:2010, latest revision – Hydraulic Fluid Power – General rules and safety requirements for systems and their components
MIL-PRF-17672, latest revision – Hydraulic Fluid, Petroleum, Inhibited
MIL-T-28800, latest revision – Test Equipment for Use with Electrical and
Electronic Equipment, General Specification for
American Industrial Heat Transfer Inc. AOCH – AOCHM Series Air Cooled
Liquid Coolers Technical Data
3.2. Equipment
3.2.1. The facility shall provide a fuse or circuit breaker as GFE.
3.2.2. The facility shall provide existing heat exchanger as GFE (American Industrial
Heat Transfer Inc. Model AOCH-35-3-R30-1P).
4. Requirements
4.1. Physical
4.1.1. The system shall be able to be operated locally from the equipment space.
4.1.2. The system shall be able to be operated remotely from the adjacent control room.
4.1.3. The system shall be equipped with interlocks on device signals.
4.1.4. The system shall fit into an area five feet by eight feet by seven feet.
4.1.5. The system shall be adapted to existing OA-9070B LBTF hydraulic lines.
4.1.6. The system shall be adapted to existing OA-9070B LBTF electric power.
4.2. Performance
4.2.1. The system shall be capable of 13 gallons per minute (gpm) at 3100 pounds per square inch (psi).
4.2.2. Supply pressure to OA-9070B LBTF shall be 2250 to 3000 psi.
4.2.3. Supply flow rate available to the OA-9070B LBTF shall be 11.5 gallons per minute.
4.2.4. Return pressure from the OA-9070B LBTF shall be 50 to 150 psi (nominal), 600 psi (maximum).
4.3. Detailed Requirements
4.3.1. The system shall have a motor with soft start.
4.3.2. The system shall have a 100-gallon reservoir.
4.3.3. Reservoir shall be equipped with temperature and level transducer.
4.3.4. The system shall use a piston pump.
4.3.5. The system shall have pressure gauges.
4.3.6. The system shall have high pressure relief valves.
4.3.7. The system shall have high pressure filter with bypass.
4.3.8. The system shall have return filter with bypass.
4.3.9. The system shall be equipped with a kidney loop filtration system.
4.3.10. The system shall be installed with wiring/communication between the system and control room.
4.3.11. The system shall be designed with appropriate safety shields, guards, and other features to promote safe operation with minimum risk to the operator and personnel.
4.3.12. The system shall incorporate emergency stop controls.
4.3.13. The system shall be equipped with alarms for high/low pressure.
4.3.14. The system shall be equipped with alarms for high/low temperature.
4.3.15. The system shall be equipped with alarms for high/low fluid level.
4.3.16. The system will direct fluid to the heat exchanger using a directional valve.
4.4. Control/Software
4.4.1. The system shall support remote start/stop and emergency stop functions.
4.4.2. The system shall support local start/stop and emergency stop functions.
4.5. Interfaces
4.5.1. The system shall integrate with current OA-9070B LBTF hydraulic lines.
4.5.2. The system shall integrate with current facility provided power.
4.5.3. The system shall be compatible with the current heat exchanger.
4.6. General
4.6.1. The vendor shall install the system.
4.6.2. The vendor shall remove and dispose of any old equipment and hydraulic fluid.
4.6.3. The vendor shall provide new hydraulic fluid to flush and fully fill the system and the OA-9070B LBTF.
4.6.4. The new hydraulic oil shall be type MIL-PRF-17672 symbol 2075TH.
4.6.5. The system design shall be able to withstand power interruptions as defined in
MIL-T-28800 (revision F section 3.5.1.2.3).
4.6.6. The system shall return to power-up condition when power has been restored per
MIL-T-28800 (revision F section 3.5.1.2.3).
4.6.7. Power up condition of the system shall not allow for movement of hydraulic motors in the OA-9070B LBTF.
4.6.8. The system shall be anchored to the facility floor.