This document summarizes the key requirements for a solicitation seeking SUBSAFE hardware, engineering, and technical services. The Naval Undersea Warfare Center Division, Newport is soliciting proposals for a five-year IDIQ contract to provide hardware, systems engineering, technical analyses, mechanical and electrical design, manufacturing, installation, test and evaluation, maintenance, and repair services to support existing and future fleet systems programs. Offerors must be SUBSAFE certified and registered in SAM to be eligible for award. The solicitation was amended three times to extend the question submission deadline to March 27th and the proposal due date to April 4th. The resultant contract will include both CPFF and FFP CLINs. Electric Boat Corporation, Northrop Grumman Shipbuilding, and Oceaneering International are the incumbent contractors.

Attachment 3 - Performance Requirements Summary Table

View the file

Other files

File Type Posted
SUBSAFE_RFP_Q&A_27_Mar.pdf PDF
SUBSAFE_RFP_Q&A_20_Mar.pdf PDF
ATT_2_-_SUBSAFE_Appendix_F.pdf PDF
Exhibit_A_-_CDRLs_(Cost).pdf PDF
ATT_5_-_Incidental_GFP_(RFP).pdf PDF
ATT_1_-_SUBSAFE_Appendix_A.pdf PDF
ATT_4_-_DD254.pdf PDF
Exhibit_B_(Reserved)_-_CDRLs_(FFP).pdf PDF
N6660419R0035_SUBSAFE_IDIQ_RFP.pdf PDF
PAB_-_(10ee)_Revised_Draft_SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Requirements Summary Table PR 1300606670

Requirement Para. # Performance Objective Performance Standard Acceptable

Quality Level

(AQL)

Quality Surveillance Plan

Typical Monitoring Methods

4.1 Engineering

Analysis, Design, and

Design Review

4.1.1 Conduct feasibility studies, ship

impact assessments (including effects on ship and system acoustics), and safety evaluations in support of submarine and surface ship systems, and system design concepts.

Feasibility studies, impact assessments, and safety evaluations are technically accurate, insightful, and are provided in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.1.2 Conduct ballasting and related

hydrostatic studies relative to proposed or new systems.

Ballasting and hydrostatic studies are technically accurate and are provided in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.1.3 Conduct structural and acoustic

design studies and analyses on piping, frames, foundations, launch, handling, sails, or other ship systems.

Structural and acoustic deisgn studies are technically accurate, insightful, and are provided in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.1.4 Conduct ship safety and hull

integrity studies, and development/modification to

SUBSAFE Design Reviews.

Studies are technically accurate and are provided in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.1.5 Conduct system interface studies

to define and/or resolve design conflicts.

Studies are technically accurate and are provided in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.1.6 Perform studies relative to control

system software and safety evaluations on system interlocks.

Studies are technically accurate and are provided in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.1.7 Perform weapon-to-ship

integration studies for US and foreign vessels.

Studies are technically accurate and are provided in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

SOW ATTACHMENT 3

Quality Level

(AQL)

Quality Surveillance Plan

Typical Monitoring Methods

4.2 Interface Working

Group Meetings

4.2 Conduct Interface Working Group

Meetings to develop interface control documents (ICD) and related interface control revisions

(ICR), as well as identify, document, and resolve system interface issues

Meeting minutes, presentation material, and technical documents are technically accurate and are delivered in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.3 Component and

Piping Layouts/Ship

Installation Drawings

4.3 Prepare component and piping

layouts and ship installation drawings in support of new or modified systems.

Engineering drawings are technically accurate and are delivered in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.4 Ship Arrangement

Layouts

4.4 Develop ship arrangement layouts

and detail designs in support of weapon stowage, launcher system, sail system, cargo handling systems, and design concepts for systems that interface with SUBSAFE boundaries.

Engineering drawings are technically accurate and are delivered in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.5 Test

Plan/Procedures and other Logistics

Documentation

4.5.1 Prepare Alteration and

Improvement (A&I), Ordnance

Alteration (ORDALT), Ship

Alteration (SHIPALT), Temporary Alteration

(TEMPALT), and Engineering

Change instructions.

Engineering change and ORDALT documentation is technically accurate and is delivered in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.5.2 Prepare engineering drawings

including conceptual designs, system layouts, detail and assembly drawings, interface control drawings, artwork, schematics, and associated lists for fleet systems.

Engineering drawings are technically accurate and are delivered in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

Quality Level

(AQL)

Quality Surveillance Plan

Typical Monitoring Methods

4.5.3 Prepare Quality Assurance

(QA)/Quality Control (QC) plans and documentation for preparation or review of

Technical Repair Standards, Quality Assurance Procedures, and Classification of Defects

(CDs).

QA/QC plans and documentation for preparation or review of standards, procedures, or defects are technically accurate and are delivered in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.5.4 Develop Integrated Logistics

Support (ILS) and Supportability documentation.

Logistics analyses are technically accurate, insightful, and are provided in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.5.5 Develop design disclosure

documentation in order to fully describe the design, operation, manufacture, and installation.

Engineering data packages are technically accurate and are delivered in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.5.6 Prepare and process Memoranda

of Agreement (MOA) and controlled Work Packages.

Procedures are technically accurate and are delivered in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.6 Fleet Training and

Certification

Programs

4.6 Conduct fleet training and

certification programs for newly developed, modernized, or modified ship systems.

Training documentation is technically accurate and is delivered in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.7 Alteration and

Installation Meetings

4.7 Attend A&I, ORDALT, MACHALT, SHIPALT, TEMPALT, and meetings for fleet systems and make technical recommendations.

Meeting minutes, presentation material, and technical documents are technically accurate and are delivered in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Quality Level

(AQL)

Quality Surveillance Plan

Typical Monitoring Methods

4.8 Component, Hardware, and

Material Fabrication

4.8.1 Fabricate and manufacture

shipboard hardware to support repairs and installations of

TEMPALTS, MECHALTS,

SHIPALTS, ORDALTS, A&I,

and Field Changes.

Hardware is fabricated in accordance with drawings and specifications and is delivered in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.8.2 Fabricate representative mockups

of existing or future planned submarine or surface ship system components or assemblies.

Hardware is fabricated in accordance with drawings and specifications and is delivered in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.8.3 Provide manufacturing services to

construct systems hardware and equipment from designs.

Hardware is fabricated in accordance with drawings and specifications and is delivered in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.9 Installation, Maintenance, and

Modernization

Services

4.9.1 Conduct TEMPALTS, MECHALTS, SHIPALTS, ORDALTS, A&I, Engineering

Changes, and Field Changes.

Installation/removal is performed in accordance with approved procedures, meets appropriate quality assurance standards, and within agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.9.2 Install and remove

SUBSAFE/LEVEL 1 hardware onboard submarines.

Installation/removal is performed in accordance with approved procedures, meets appropriate quality assurance standards, and within agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.9.3 Perform planned and emergent

maintenance on land-based facilities.

Maintenance is performed in accordance with approved procedures, meets appropriate quality assurance standards, and within agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Quality Level

(AQL)

Quality Surveillance Plan

Typical Monitoring Methods

4.9.4 Provide field service engineering

for system assembly and installation, alteration kit proof-ins, grooming and adjustment, operation, repair, refurbishment, system checkout, minor repairs, configuration validation, and system certification.

Assembly and installation is performed in accordance with approved procedures, meets appropriate quality assurance standards, and within agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.9.5 Install representative mockups of

existing or future planned submarine or surface ship system components or assemblies.

Installation is performed in accordance with approved procedures, meets appropriate quality assurance standards, and within agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.10 Test and

Evaluation Services

4.10.1 Perform evaluation and technical

analysis of results of fabricated systems and subsystems.

Overhauled and new production equipment is technically accurate, meets established quality assurance standards, and is delivered in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.10.2 Investigate and test fleet hardware

systems and subsystems, including providing onsite troubleshooting.

Overhauled and new production equipment is technically accurate, meets established quality assurance standards, and is delivered in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Quality Level

(AQL)

Quality Surveillance Plan

Typical Monitoring Methods

4.11 Fleet Component

Repair

4.11 Provide technical and engineering

services in response to Vertical

Launch System (VLS) Repair

Facility (RF) requests for the evaluation and analysis of failed fleet components provided as

Government Furnished

Equipment (GFE).

Overhauled and new production equipment is technically accurate, meets established quality assurance standards and is delivered in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

File details come from the government source that posted it. Updated .