AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to change the Period of Performance and make changes to Sections L & M. See page 2 for details.

1. CONTRACT ID CODE PAGE OF PAGES

1 29

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Apr-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6660418R0466

X 9B. DATED (SEE ITEM 11)

09-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Apr-2018

CODE

NAVAL UNDERSEA WARFARE CTR. DIV., NPT.

DAWN A. GRIFFIN, CODE 0221

CONTRACTS DEPARTMENT

1176 HOWELL STREET, BLDG. 1258

NEWPORT RI 02841

N66604 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6660418R0466

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been added by full text:

GENERAL INFORMATION

AMENDMENT 0001

The purpose of Amendment 0001 is to revise the solicitation as follows:

Section F

1. The Delivery Date of CLIN 0001 is revised as follows:

Delete: 31 May 2018 Insert: 31 Oct 2018

2. The Period of Performance of CLINs 0002, 0003, 0004, 0005, 0006, and 0007 are revised as follows:

Delete: 01 May 2018 – 30 April 2023 Insert: 01 Oct 2018 – 30 Sep 2023

3. The Delivery Date for CLINs 0008 and 0009 are revised as follows:

Delete: 30 Apr 2018 Insert: 30 Sep 2023

Section L

1. Provision UW L-2-0001, Instructions to Offerors, is revised as follows:

(a)Paragraph 2.0(3):

Delete: A plan for obtaining clearances, both Facility and Personnel, by the start of the period of performance as specified in the DD254. The plan shall include confirmation of existing clearances, detail the Offeror’s process for obtaining clearances, and outline the schedule for obtaining any required new clearances. The plan shall consist of no more than two (2) pages.

Insert: A plan for obtaining clearances (The plan shall consist of no more than (2) pages. Proof of existing facilities clearance is not included in the page count limitation):

a. Personnel Clearances: The plan shall include confirmation of existing clearances, detail the Offeror’s process for obtaining clearances, and outline the schedule for obtaining any required new clearances by the start of the period of performance.

b. Facilities Clearances: The offeror shall provide proof of an existing facilities clearance at the level specified in the DD254. An offeror’s statement that it has a facility clearance is not sufficient proof. The Government will confirm the facility clearance.

NOTE: Offerors that do not have a Facility Clearance at the level specified in the DD254 at time of proposal submission will not be evaluated for award. No award will be made to any offeror which does not possess a facility clearance issued by the Defense Security Service at the level specified in the DD254.

(b) Paragraph 4.1 (g) (8) is inserted as follows:

In accordance with current NAVSEA policy, for any fully burdened labor rate (calculated as direct labor plus all applicable burdens and fee) greater than $156.00 per hour, the Offeror shall provide a justification containing the following:

(a) Justify why the proposed individual qualifies for a fully burdened labor rate of greater than $156.00 per hour, focusing on specific qualifications and experience.

(b) Justify why the qualifications and experience outlined in (a) are needed to accomplish the tasking of the Statement of Work/Performance Work Statement, including why the tasking cannot be performed by personnel with lesser qualifications and/or experience.

Each justification provided above shall be no greater than one (1) page.

Section M

1. Provision UW M-2-0001, Evaluation Factors, is revised as follows:

Paragraph 2.0(3):

Delete: Plan for Obtaining Clearances. The Government will evaluate the plan for obtaining clearances, both Facility and Personnel including confirmation of existing clearances, details of the Offeror’s process for obtaining clearances, and outlining the schedule for obtaining any required new clearances as specified in the DD254.

Insert: Plan for Obtaining Clearances.

a. The Government will evaluate the plan for obtaining personnel clearances, including confirmation of existing personnel clearances, details of the Offeror’s process for obtaining personnel clearances and outlining the schedule for obtaining any required new personnel clearances by the start of the period of performance.

b. The Government will confirm the status of the offeror’s existing facility clearance. Failure to have a facility clearance at the level specified in the DD254 will preclude an offeror from being eligible for award. The Government will not delay an award determination due to a lack of a facility clearance at the level specified in the

DD254.

All other solicitation terms and conditions remain unchanged.

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

31-MAY-2018 1 NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827 FOB: Destination

N66604

To:

CAGE

31-OCT-2018 1 NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827

The following Delivery Schedule item for CLIN 0002 has been changed from:

CAGE

POP 01-MAY-2018 TO

30-APR-2023

N/A NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827

CAGE

POP 01-OCT-2018 TO

30-SEP-2023

N/A NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827

The following Delivery Schedule item for CLIN 0003 has been changed from:

POP 01-MAY-2018 TO

30-APR-2023

N/A NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827

CAGE

POP 01-OCT-2018 TO

30-SEP-2023

N/A NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827

The following Delivery Schedule item for CLIN 0004 has been changed from:

CAGE

POP 01-MAY-2018 TO

30-APR-2023

N/A NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827

CAGE

POP 01-OCT-2018 TO

30-SEP-2023

N/A NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827

The following Delivery Schedule item for CLIN 0005 has been changed from:

N/A NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827

CAGE

POP 01-OCT-2018 TO

30-SEP-2023

N/A NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827

The following Delivery Schedule item for CLIN 0006 has been changed from:

CAGE

POP 01-MAY-2018 TO

30-APR-2023

N/A NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827

CAGE

POP 01-OCT-2018 TO

30-SEP-2023

N/A NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827

The following Delivery Schedule item for CLIN 0007 has been changed from:

N/A NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827

CAGE

POP 01-OCT-2018 TO

30-SEP-2023

N/A NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827

The following Delivery Schedule item for CLIN 0008 has been changed from:

CAGE

30-APR-2023 1 NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827

CAGE

30-SEP-2023 1 NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827

The following Delivery Schedule item for CLIN 0009 has been changed from:

30-APR-2023 1 NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827

CAGE

30-SEP-2023 1 NAVAL STATION NEWPORT, N66604

RECEIVING OFFICER

SEE CLAUSE UW D-2-0001

--- RI

401-841-3827

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

UW L-2-0001 Instructions to Offerors

1.0 INSTRUCTIONS FOR SUBMISSION OF PROPOSALS

1.1 General Information

Offerors may elect to submit a proposal for either SOW Part A and SOW Part B, SOW Part A and SOW Part C or SOW Part A, Part B, and Part C. Offerors may not submit a proposal for only SOW PART A.

Important: Offerors shall not include classified material in the volumes.

All questions concerning this procurement, either technical or contractual, must be submitted via email. No direct discussion between the technical representative and prospective Offeror will be conducted. Questions and proposals shall be submitted to the following point of contact:

Name: Dawn A. Griffin Email: dawn.griffin@navy.mil

Alternate Point of Contact:

Name: MaryAnn Gardner Email: maryann.gardner@navy.mil

1.2 Submission Requirements

(a) Each Offeror shall submit its entire proposal electronically. The Government will evaluate each Offeror's understanding of the Government's requirements and ability to perform the work on the basis of its proposal.

Offerors shall provide information and documentation in detail to clearly identify its overall qualifications.

(b) Proposals shall be submitted electronically via email to Dawn Griffin at dawn.griffin@navy.mil.

Offerors shall comply with the detailed instructions for the format and content of the proposals; proposals that do not comply may be considered unacceptable and may render the Offeror ineligible for award.

1.3 Proposal Format

(a) The proposal shall be submitted in the English language. The narrative material in the proposal shall be prepared in no smaller than 10 point Times New Roman font style, single-spaced with no less than a one inch margin on all sides. In the event photo reduction is used for tables, charts, and drawings, their presentation must be clear and legible. No pictures or hyperlinks are allowed.

(b) Proposals and all attachments shall be readable by Microsoft Office 2010 or Adobe Acrobat Portable Document Format (PDF).

(c) Offerors shall provide a cover letter with the following information:

(1) Solicitation number;

(2) The name, address, email address, telephone numbers, Cage Code, DUNS Number, and Tax Identification Number (TIN) of the Offeror;

(3) A statement specifying unconditional acceptance of all terms and conditions;

(4) A statement that the proposal is valid through 180 calendar days from the date specified for receipt of proposals;

(5) Names, titles, telephone numbers, and e-mail addresses of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation;

(6) DCAA and DCMA office points of contact, including branch location, contact name, telephone number, and email address;

(7) Name, title, and signature of a person authorized to sign the proposal;

(8) Identify all enclosures being transmitted as part of its proposal; and,

(9) If the Offeror (prime and/or subcontractor) is proposing on a cost reimbursement basis (e.g., Cost Plus Fixed Fee) or a Time and Materials (T&M) basis, include the status of the Offeror’s accounting system and provide supporting documentation (e.g., DCMA letter confirming adequacy of accounting system).

(d) Offerors shall provide fill-in information for all clauses/provisions that require it.

2.0 PASS/FAIL REQUIREMENTS

The Offeror shall submit the following information with its proposal which will be evaluated as a pass or fail in relation to the solicitation requirements:

(1) A transition plan that addresses how the Offeror plans to reach full operational tempo within thirty (30) days of the start of the period of performance and perform the tasking of the Statement of Work until it reaches full operational tempo. The plan shall consist of no more than four (4) pages.

(2) In accordance with Section C, Section I, the Organizational Conflict of Interest (OCI) clause of this section, Offerors shall identify any and all conflicts of interest or potential conflicts of interest related to this solicitation and provide a mitigation plan to address the conflicts and/or potential conflicts. There is no page count limitation for the OCI submission. If no conflicts of interest or potential conflicts of interest exist, a written statement certifying this, shall be provided.

(3) A plan for obtaining clearances (The plan shall consist of no more than (2) pages. Proof of existing facilities clearance is not included in the page count limitation):

a. Personnel Clearances: The plan shall include confirmation of existing clearances, detail the Offeror’s process for obtaining clearances, and outline the schedule for obtaining any required new clearances by the start of the period of performance.

b. Facilities Clearances: The offeror shall provide proof of an existing facilities clearance at the level specified in the DD254. An offeror’s statement that it has a facility clearance is not sufficient proof. The Government will confirm the facility clearance.

NOTE: Offerors that do not have a Facility Clearance at the level specified in the DD254 at time of proposal submission will not be evaluated for award. No award will be made to any offeror which does not possess a facility clearance issued by the Defense Security Service at the level specified in the DD254.

3.0 NON-COST/PRICE EVALUATION FACTORS

Offerors shall address each factor and subfactor in the format and sequence identified in the solicitation. The Offerors shall provide information in sufficient detail to allow the Government to assess the Offeror’s capability.

The proposal shall be detailed and clearly stated to allow an assessment by the Government without the need for additional clarifications. Proposals that do not contain the information required in the solicitation risk being determined unacceptable.

In response to the RFP, the Offeror shall address the below factors and subfactors.

FACTORS SUBFACTORS

Technical Capability (Factor 1) Subfactor 1-Hypothetical Tasks

Subfactor 2-Personnel Subfactor 3-Small Business Participation

Past Performance (Factor 2) N/A Cost/Price (Factor 3) N/A

3.1 Technical Capability-Factor 1.

3.1.1 Hypothetical Tasks (Subfactor 1)

(a) The Offeror shall provide a detailed approach to handle each hypothetical task below which addresses its understanding of the issue(s) and requirement(s) and including the types of personnel required (i.e., labor categories) to complete each hypothetical task. The responses to each hypothetical task shall be included in the technical proposal. The page count limitations for each response are provided in each hypothetical task.

Offerors shall submit detailed approaches for Hypothetical Tasks for either SOW Part A and SOW Part B, SOW Part A and SOW Part C or SOW Part A, Part B, and Part C. Offerors may not submit a proposal for only SOW PART A.

Offerors submitting proposals for SOW Part A and SOW Part B must submit detailed approaches for Hypothetical Tasks #1 - #6. Offerors proposing for SOW Part A and SOW Part C must submit detailed approaches for Hypothetical Tasks #1 and #7. Offerors proposing for SOW Part A, B, and C shall submit detailed approaches for all Hypothetical Tasks (#1 – #7).

SOW Part A

(1) Hypothetical Task #1 - SOW Task 4.2: Presentation, Training, and Multimedia Material

You are tasked to develop digital visualization and animation products demonstrating environmental support which the Environmental Branch provides to its customers at NUWCDIVNPT and throughout the Navy.

(a) What types of print and digital elements would you develop to support this task?

(b) What artistic and creative tools would you use to develop digital content?

(c) How would you manage digital content and make it reusable for future use?

(d) Describe why these products will be successful in communicating the message.

(e) When delivering these products to Navy, what mechanism will you use and how will it account for review and version control?

Response to Hypothetical Task #1 shall not exceed two (2) pages.

SOW Part B

(2) Hypothetical Task #2- SOW Task 4.3: Environmental Planning Documentation Development in Accordance with NEPA

You are tasked with developing planning documentation for a Navy sonar test using a bottom-placed target field 6 nautical miles south of Pensacola, Florida.

(a) What additional information would be needed about the proposed action?

(b) What other laws and regulations would require documentation?

(c) How would you identify protected resources in the test area?

(d) Identify the process, from scoping to final documentation, which would be used to analyze the activity and develop appropriate documentation.

Response to Hypothetical Task #2 shall not exceed four (4) pages.

(3) Hypothetical Task #3 - SOW Task 4.4: Research and Field Activities

You are tasked to design an experiment to study the effects of an anthropogenic stressor on a marine species of interest.

(a) What spatial/temporal scales should you consider in designing the experiment?

(b) What types of data collection/metrics should you consider?

(c) What statistical/analytical tools would be appropriate to the study design?

Response to Hypothetical Task #3 shall not exceed three (3) pages.

SOW Part B

(4) Hypothetical Task #4 - SOW Task 4.5: Geospatial Data Development, Data Management, Spatial Planning and Modeling

PART 1: You are tasked to compile various biological, climatological, physical and media information to generate GIS formatted data that are compatible with Esri ArcSDE and ArcGIS for Server and Desktop platforms.

(a) What methodology would you use to mine or create these data and how would you account for best available science and source of the data?

(b) What file formats and database would you use for this collection?

(c) What methodology would you use to make the data available to the Environmental Branch staff and it customers?

PART 2: You are tasked to develop web services, custom geoprocessing tools and services, and web map applications on a Navy server that supports at-sea site selection for Navy testing and training.

(a) What Esri platform would you select to complete this task?

(b) What software development kit and application program interface would you use and why?

(c) When building custom geoprocessing tools, what GIS methodology would you use and what spatial, temporal, and physical geography parameters would you consider? How would you document the process and usability?

Response to Hypothetical Task #4 shall not exceed five (5) pages.

(5) Hypothetical Task #5 - SOW Task 4.6: Library Information Science

You are tasked with maintaining access to “Best Available Science,” for scientific literature reviews supporting environmental planning and research.

(a) What is “Best Available Science”?

(b) How would you monitor for updated information? What resources would you use?

(c) With what frequency would you conduct searches for new information?

(d) How would you remain current with Best Available Science?

(e) What bibliographic management software and/or repositories would you use?

Response to Hypothetical Task # 5 shall not exceed four (4) pages.

(6) Hypothetical Task #6 - SOW Task 4.7: Acoustic Analysis and Modeling

You are required to quantitatively assess the potential impact of sound on marine mammals.

(a) What major sound propagation models currently are in use in the scientific community, and which would be appropriate for different sound types?

(b) What types of inputs to a model are important for assessing impacts?

(c) How do the outputs of the model correspond to regulatory requirements?

Response to Hypothetical Task #6 shall not exceed four (4) pages.

SOW Part C

(7) Hypothetical Task# 7- SOW 4.11: Environmental Quality and Compliance Evaluations

You are tasked to conduct an environmental compliance evaluation of a Division Newport On-site Office comprised of two buildings (administrative office and electronics repair workshop) that is located onboard another Navy installation (e.g., Naval Submarine Base Kings Bay).

(a) Identify the major steps necessary to effectively complete the compliance evaluation and how you would handle the discovery of regulatory noncompliance during the evaluation.

Response to Hypothetical Task #7 shall not exceed five (5) pages.

3.1.2 Personnel (Subfactor 2)

(a) CPFF Tasking:

The Offeror shall provide a complete labor matrix representing the full five (5) year level of effort, demonstrating an appropriate mix of personnel. The labor mix shall correlate the Key Personnel identified in paragraph 3.1.2 (b) with their corresponding hours to each assigned SOW task. The labor matrix shall also correlate the labor categories for all Non-Key Personnel with their corresponding hours to the SOW task(s).

Below is the Government’s estimated labor mix for each of the CPFF SOW tasks.

Note: Only submit labor matrices for the SOW Parts proposed.

Task Number

SOW Part A: Task Name & Labor Category Hours per year

Total Estimated Hours 5 yrs

4.1 Project Administration and Management

Analyst, Manager III (Program Manger 416 2,080

Analyst, Manager II (on site task manager) 2,080 10,400

Total SOW 4.1 2,496 12,480

4.2 Presentation, Training, and Multimedia Material

Graphics/Multimedia Illustrator 6,240 31,200

Total SOW 4.2 6,240 31,200

Total SOW Part A 43,680

SOW Part B: Task Name Hours per year

Total Estimated Hours 5 yrs

4.3 (exclusive of subtask

4.3.5)

MEP Program Environmental Planning documentation development in accordance with NEPA and EO 12114

Environmental Planner I /Scientist I 1,040 5,200

Environmental Planner II/Scientist II 6,240 31,200

Environmental Planner III/Scientist III 2,080 10,400

Total SOW 4.3 9,360 46,800

4.4 MEP Program, Research and Field Activities

Scientist I 2,860 14,300

Scientist II 1,560 7,800

Scientist III 2,080 10,400

Total SOW 4.4 6,500 32,500

4.5 MEP Program , Geospatial Data Development, Data Management, and Spatial Planning and Modeling

GIS Analyst I/Engineer I, Computer Scientist I, or Scientist I 520 2,600

GIS Analyst II/Engineer II, Computer Scientist II, or Scientist

II 2,080 10,400

GIS Analyst III/Coordinator/Engineer III, Computer Scientist III, or Scientist III 520 2,600

GIS Developer/Engineer II, Computer Scientist II/Scientist II 520 2,600

II

Total SOW 4.5 3,640 18,200

4.6 MEP Program, Library Information Science

Library Scientist 520 2,600

Library Program Administrator 520 2,600

Total SOW 4.6 1,040 5,200

4.7 MEP Program , Acoustic Analysis and Modeling

Modeler I/Technician, Engineering I 1,040 5,200

Modeler II/Technician, Engineering II 1,040 5,200

Modeler III/Technician, Engineering III 1,040 5,200

Total SOW 4.7 3,120 15,600

4.8 MEP Program, Information Management and Technology

Database Manager/Specialist, Configuration Management III 104 520

Information Assurance Technician/Scientist, Computer II 104 520

Total SOW 4.8 208 1,040

4.9

MEP Program , Energy Planning Documentation in accordance with Naval Systems Commands and CNO Task Force Energy, Environment, and Climate Change initiatives

Scientist II 1,560 7,800

Scientist III 2,080 10,400

Total SOW 4.9 3,640 18,200

Total SOW Part B 137,540

SOW Part C: Task Name Hours per year Total Estimated Hours

4.11 Environmental Quality and Compliance Evaluations

Scientist I 260 1,300

Scientist II 312 1,560

Total SOW 4.11 572 2,860

4.12 Environmental Site Inspections/Assessments

Scientist I 260 1,300

Scientist II 312 1,560

Total SOW 4.12 572 2,860

4.13 Solid Waste Management

Scientist I 260 1,300

Scientist II 312 1,560

Total SOW 4.13 572 2,860

4.14 Hazardous Waste Transfer, Collection, Characterization, Manifesting, and Spill Response

Scientist I 260 1,300

Scientist II 624 3,120

Total SOW 4.14 884 4,420

4.15 EMP2 Program, Environmental Engineering Field Work

Scientist I 260 1,300

Total SOW 4.15 260 1,300

4.16 EMP2 Program, Hazardous Waste, Waste Water, Drinking Water, and Air Permits

Scientist II 624 3,120

Total SOW 4.16 884 4,420

4.17 EMP2 Program, Hazardous Material, Hazardous Waste, Solid Waste, Air Emissions and Waste Water Reporting

Total SOW 4.17 572 2,860

4.18 EMP2 Program, Pollution Prevention and Hazardous Material Management

Total SOW 4.18 572 2,860

4.19 EMP2 Program, Environmental Data Management

Scientist I 260 1,300

Scientist II 312 1,560

Total SOW 4.19 572 2,860

Total SOW Part C 27,300

The tables above represent the Government’s estimated labor mix for the CPFF tasking. Offerors may propose this estimated labor mix or deviate. If an Offeror’s proposed labor mix differs from the Government’s estimate by 5% or greater, in terms of both labor category or task level of effort distribution, the Offeror shall provide a rationale to explain how the Offeror’s mix is more appropriate than the Government’s estimate, as well as what the benefit of the deviation is to the Government. The rationale shall not exceed 5 pages. The labor matrix is not subject to a page limitation. In order for the labor mix rationale to demonstrate the deviating labor mix is appropriate, it shall address items (1) through (3) below.

(1) Why the Offeror’s deviation is more beneficial to the Government than the estimated labor mix.

(2) How the proposed labor mix deviation in terms of level and area of expertise (e.g., proposed labor categories) is suitable for performance of the SOW tasking as it relates to the estimated level of effort per SOW task and associated SOW complexity identified in the SOW.

(3) How relationships between labor categories will be structured and operate in concert at the task and/or subtask level to accomplish the tasking efficiently and effectively (e.g., peer review process, senior to junior level oversight and interaction, etc.)

(4) Labor Categories cited must be titles listed at the NUWC Division Newport Contracts Website http://www.navsea.navy.mil/Home/WarfareCenters/NUWCNewport/Partnerships/CommercialContracts /LaborCategories.aspx. For Labor Categories that provide for various Levels (I, II, III, IV), select the Level that matches the proposed individual . Note for Service Contract Labor Standards (SCLS), formerly Service Contract Act (SCA) Labor Categories Only: Offerors may propose an SCLS labor category listed in the SCLS Directory of Occupations (see http://www.dol.gov/whd/govcontracts/sca.htm) even if the SCLS labor category is not listed at the NUWC Division Newport Contracts Website. The appropriateness of any proposed SCLS labor category not listed at the NUWC Division Newport Contracts Website shall be included in the Offeror's explanation provided in accordance with paragraph (a), above.

(5) Number of hours must be assigned to each Labor Category selected.

(6) The offeror shall include a breakdown of the proposed distribution of hours between Government site(s) and contractor(s) site(s). If the proposed distribution of hours varies by more than five percent (5%) from the Government’s estimated distribution of hours as specified below of the solicitation, the offeror shall provide an explanation detailing why the proposed distribution is appropriate and how contract performance will not be negatively impacted by the variance.

(7) 20% of the labor hours are anticipated to be performed at the Contractor Facilities; 80% of the labor hours are anticipated to be performed at the Government Site.

(8) If a single labor category is proposed with both Key and Non-Key Personnel the offeror shall breakdown the distribution of hours between each Key and Non-Key Person.

(9) Identify all proposed Key Personnel who are not currently employees of the Offeror or proposed subcontractor, and who are proposed to immediately relocate. Provide a statement signed by that person indicating their intent to be hired or relocated if the contract is awarded to the Offeror. If the signed statement includes any references or enclosures the offeror shall provide the references and enclosures with the statement as part of the proposal. Failure to provide references or enclosures or submission of enclosures that violate DFARS 222.7402 and DFARS 252.222-7006 may render an offeror's proposal ineligible for award.

(10) Provide resume(s) for Key Personnel. Key Personnel must be personnel that will be charged directly to the contract and not as part of any indirect cost. Qualifications of Key Personnel shall not be based on the presumption of future education or experience.

(11) Resumes are not required for Non-Key Personnel. Resumes submitted for Non-Key Personnel will not be evaluated.

(12) Each resume shall not exceed two (2) pages. Resumes shall include: employee name, number of years of professional experience, current position/title/employer, educational history, chronology of professional experience, current level of security clearance.

(b) The offeror shall propose a minimum of four (4) Key Personnel for SOW Part B and a minimum of one (1) Key Person for SOW Part C, and one (1) Senior Technical Representative (STR). Key Personnel for each of the following tasks are required:

There are no Key Personnel Requirements for SOW Part A

SOW Task 4.3, MEP Program Environmental Planning documentation development (2 Key Personnel) SOW Task 4.4, MEP Program, Research and Field Activities (1 Key Personnel) SOW Task 4.5, MEP Program, Geospatial Data Development, Data Management, and Spatial Planning and Modeling (1 Key Personnel)

The below qualifications are required or highly desired.

SOW Part B

1. Environmental Planner/Scientist I (SOW 4.3)

Required Qualifications

(A) B.S. Marine Science or Biology, Marine Policy, or similar field related to the marine environment;

(B) Experience contributing to documentation under the National Environmental Policy Act, Endangered Species Act, Marine Mammal Protection Act, Coastal Zone Management Act, and other environmental planning laws and regulations;

Highly Desired Qualifications

(A) At least 3 years of experience in marine science or policy;

(B) Proficiency in scientific writing including technical reports and presentations; defined as a high degree of competence or skill demonstrated in writing and presentation samples such as, Environmental Assessments, Environmental Impact Statement (EIS), and related National Environmental Policy Act (NEPA) documents concerning US Navy, at sea training and testing.

(C) Understanding of underwater acoustic effects analyses;

(D) Experience with Endnote and marine science literature reviews.

2. Environmental Planner/Scientist II (SOW 4.3)

Required Qualifications

(A) M.S. Marine Science or Biology, Marine Policy, or similar field related to the marine environment;

(B) Experience writing and managing documentation under the National Environmental Policy Act, Endangered Species Act, Marine Mammal Protection Act, Coastal Zone Management Act, and other environmental planning laws and regulations;

(C) Experience analyzing the potential effects of underwater sound.

Highly Desired Qualifications:

(A) At least 5 years of experience in marine science or policy;

(B) At least 2 years of experience in project management, including budgeting, personnel tasking, and management of timeline milestones;

3. Scientist III (Section 4.3, 4.4)

Required Qualifications:

(A) M.S or PHD in biological science, marine science, natural resources, or other field related to the marine environment;

(B) Proficiency in statistical modelling and use of R or similar statistics software; defined as a high degree of competence or skill demonstrated in scientific research, resulting in the publication of research articles within Environmental or Ecological scientific journals, or has authored technical documentation to support environmental modeling for Environmental Impact Studies commissioned by the Federal Government;

(C) Proposal writing and scientific writing proficiency;

(D) Scientific publication and professional presentation experience;

(E) Experience managing a research project, including budgeting, personnel tasking, and management of timeline milestones

Highly Desired Qualifications:

(A) At least 10 years marine science experience including field work;

(B) At least 10 years marine science or policy;

4. Engineer II /Scientist II / or Computer Scientist II (Section 4.5)

Required Qualifications:

(A) B.S. in environmental science, marine science, natural resources, engineering, computer science or other field related to the marine environment;

(B) Proficiency in GIS mapping and modelling software; defined as a high degree of competence or skill that demonstrates a portfolio of GIS map products derived by the use of GIS and modeling software packages. Products consist of printed maps, web maps, and data models resulting in a visual product that models alternative states using methodologies which are scientifically defensible;

(C) Scientific and professional presentation experience;

(D) Experience managing GIS operations and product, including budgeting, personnel tasking, and management of timeline milestones

Highly Desired Qualifications

(A) At least 5 years' geospatial science and technology experience

(B) M.S. in environmental science, marine science, natural resources, engineering, computer science or other field related to the marine environment;

SOW Part C SOW Tasks 4.10-4.19 (1 Key Person, Scientist II)

Required Qualification

(A) Hazardous Waste Operations and Emergency Response 40-hour training

(B) USDOT Hazardous Materials and Waste Transportation Training;

(C) Forklift operator training

(D) Resource Recovery and Conservation Act management training;

Highly Desired Qualification

(A) At least 3 years of work experience with environmental compliance/management experience.

(B) B.S. in environmental science, natural resources, engineering, or other field related to the marine environment;

(C) ISO 14001 Environmental Management System training;

(D) Environmental Compliance Inspection/Auditor Training

(1) In addition to above Key Personnel, the Senior Technical Representative (STR) designated to manage tasks shall be proposed as Key Personnel. Include a resume for the STR (if the STR's resume is included elsewhere in the proposal, identify its location and do not resubmit). Address the STR's authority, ability to independently commit company resources to performance under the contract, and the STR's line of communication to senior company management. Describe the STR's previous experience managing similar efforts. Offerors shall identify the STR’s labor category. If the STR is not proposed to perform onsite at NUWCDIVNPT, explain how the STR will effectively and efficiently manage day-to-day tasks.

(2) If the use of personnel at facilities outside the local commuting area is proposed, demonstrate that the personnel can be used effectively and efficiently, and that adequate management control exists over their use. Local commuting area is defined as within fifty (50) miles of NUWCDIVNPT via ground transportation.

(3) The qualifications listed in each individual proposed Key Personnel resume, not the specific individual, are the materially relevant aspects of the proposed Key Personnel partially forming the basis of award under 5252.237- 9106, SUBSTITUTION OF PERSONNEL (SEP 1990). Therefore, even if a proposed Key individual becomes unavailable to the offeror between proposal submission and award, the Government will evaluate and make its award decision based on the qualifications listed on the proposed resume(s). When the Government awards a contract under those circumstances, the Government will require the awardee to use the qualifications listed on the relevant proposed Key Personnel resume as the basis for replacing that individual under 5252.237-9106(b) during contract performance

(4) For any uncompensated overtime, follow procedures as referenced in FAR 52.237-10. If not proposing personnel working in excess of forty (40) hours per week, the offeror shall provide a statement indicating as such.

(c) FFP Tasking:

The offeror shall not construe the estimated effort below to be a FFP level of effort. Rather this is the Government's means to describe the anticipated effort for five years under the requirement for the SOW tasks/subtasks defined in Section C and the Contract Data Requirements Lists (CDRLs) enclosed as Attachment 1, “Exhibit B".

SOW Part and Task Name Total

Estimated Hours

4.3.5 SOW Part B, MEP Program Environmental Planning documentation development in accordance with NEPA and EO 12114

Environmental Planner II (MEP Program, ERB support, complete EA development) 10,400

4.10 SOW Part C, Environmental Management System

Scientist II (EMP2 Program, EMS tasks) 10,400

Total 20,800

3.1.3 Small Business Participation

The offeror shall provide sufficient detail to permit a complete evaluation. This factor applies to every offeror (U.S.

and non-U.S.), regardless of size status or locations of working facilities or headquarters. Small Business Participation shall include the following:

(a) All offerors shall provide the names and CAGE codes of small business concerns (including the offeror if a small business concern) who would participate in accomplishing the proposed contract; the small business classification of each U.S. small business concern (i.e. SB, SDB, WOSB, HUBZone SB, VOSB, and SDVOSB); and a short description of the specific supplies or services to be provided by each small business concern. If a small business does not have a CAGE code, insert the word "None." List all SB classifications that apply to each concern.

(b) All offerors, including offerors who are themselves U.S. small business concerns based on the North American Industry Classification System (NAICS) code and size standard applicable to this procurement, are to identify the extent to which U.S. small business concerns will be utilized as first-tier subcontractors in the performance of this proposed contract. U.S. small business concerns are defined (1) in FAR 19.001 and (2) by the criteria and size standards in FAR 19.102 for the applicable NAICS code.

(c) A small business offeror shall indicate the percentage of work performed by themselves, as well as by any Small Business subcontractors. Proposals submitted by Large Business Concerns shall indicate the percentage of work performed by Small Business Subcontractors. The Small Business Participation percentage shall be calculated as follows:

Participation Percentage = Total Small Business Contract + Subcontract Dollars Total Contract Value

(d) The Government’s Small Business Participation objective for this contract is: 10%. The offeror is encouraged to propose a Small Business Participation objective percentage as high as is practicable, as long as the percentage is supported by the related Small Business participation approach outlined in paragraph (e) below. The Offeror’s proposed Small Business Participation percentage for this contract shall be incorporated into the contract upon award.

(e) Provide an approach for how the Offeror intends to meet the proposed Small Business participation percentage.

The Offeror shall provide rationale that demonstrates the tasks assigned to the selected Small Businesses are meaningful to the overall success of this contract. A Small Business Offeror shall include work performed as the prime contractor as well as any work performed by Small Business subcontractors. In addition, the Offeror shall describe their management approach for involving SDB, WOSB, HUBZone SB, VOSB, and SDVOSB in the performance of this effort.

3.2 Past Performance.

(a) The Offeror shall provide three (3) past performance references, if available, that reflect recent relevant experience performed within the last three (3) years of the closing date of the solicitation that demonstrate the ability to handle the scope and breadth of the work. Include Department of Defense contracts in the information provided and discuss how the references you provide are relevant to the work being proposed. Include contract/task order number, contract/task order type, program name, total contract/task order cost, short description of work performed, and names and valid telephone numbers for the Procuring Contract Officer (PCO), Contracting Officer’s Representative (COR) and Government Program Manager (PM).

(b) Past performance information shall not exceed two (2) pages per reference, for a total of six (6) pages. These pages will not be counted against the proposal page count.

(c) Subcontractors performing more than twenty-five percent (25%) of the level of effort shall also submit three

(3) past performance references, if available, that reflect recent relevant experience performed within the last three years of the closing date of the solicitation and demonstrate the ability to handle the scope and breadth of the tasking in the Statement of Work. Each past performance reference shall not exceed two (2) pages per reference, for a total of six (6) pages per subcontractor. The same information required in paragraph (a) above for the prime shall also be provided for all past performance references submitted for subcontractors.

4.0 COST/PRICE

4.1 Cost Factor for CLINS 0002, 0003, 0004, 0005, and 0007

(a) Cost or pricing data and information other than cost or pricing data, from both the prime offeror and all subcontractor offerors, shall be provided separately in the format outlined below (see FAR 52.215-20 Alt I). Cost or pricing data provided may need to be certified prior to award (see DFARS 252.215-7008), and that a request for certification does not constitute “discussions” per FAR 52.215-1. No cost or pricing data shall appear in the offeror’s technical proposal.

(b) The offeror shall provide detailed information to allow the Contracting Officer to determine the cost realism and reasonableness of the proposed costs under CLINs 0002, 0003, 0005 and 0007. The offeror shall provide a single summary spreadsheet that supports the total amount of all CLINs listed in Section B. The offeror shall provide details as to the basis of labor rates proposed (i.e., actual rates, wage rate determinations, bid level rates) labor escalation factors applied, and burden factors. If actual direct labor rates are proposed, the offeror shall provide the effective date(s) of the actual labor rates. If the offeror used additional spreadsheets to build CLIN pricing, these spreadsheets should be submitted as part of the offeror’s proposal.

------ The offeror shall provide a level of effort by labor category, including subcontractor offeror labor categories using eCRAFT categories. Offerors shall fill in the total labor hours in Section H Clause 5252.216-9122 “Level of Effort”, paragraph (a).

(c) The prime offeror shall be responsible for justifying the reasonableness of each subcontractor offeror's cost. The prime offeror shall indicate the type of subcontract proposed (i.e., cost type, fixed price, etc.).

Prime offerors and subcontractor offerors shall provide cost or pricing data as attachments to their proposals using a Microsoft Excel compatible spreadsheet. Offerors are encouraged to review the information posted and to use the spreadsheet made available at the following link:

http://www.navsea.navy.mil/Home/WarfareCenters/NUWCNewport/Partnerships/CommercialContracts/Information eCraft/CostPriceAnalyst.aspx

To access the spreadsheet, select Points of Contact: Cost/Price Analyst and then select from that page: Cost Analysis Spreadsheet.

Prime offerors and subcontractor offerors may alter the format and formulas of this spreadsheet for the sole purpose of accommodating their own accounting systems. Spreadsheets, either in the format above or contractor format, shall contain intact formulas used to calculate any aspect of the proposal (i.e., burdened labor rates, fee, etc.). Spreadsheets provided without intact formulas are unacceptable and may render an offeror’s proposal ineligible for award. However, prime offerors and subcontractor offerors shall provide a single spreadsheet supporting the total amount of all CLINs listed in Section B of the solicitation.

If the offeror intends to subcontract 70% of the total cost of all work to be performed, provide information required by FAR 52.215-22(c).

(d) Cost Line. (CLIN 0002, 0003, and 0005 CFFF CLINS): Offerors shall include burdened labor costs of the prime offeror and the subcontractor(s). Offerors shall include burdened labor costs of the prime contractor and the subcontractor (s). Offerors shall use a labor estimate of 43,680 hours for CLIN 0002, a labor estimate of 137,540 hours for CLIN 0003, and a labor estimate of 27,300 hours for CLIN 0005.

(e) Fixed Fee. (CLIN): Offerors shall include the prime offeror's fee on their labor and the prime offeror's fee on their subcontractor offeror(s).

(f) Material/ODCs and Travel (CLIN 0007): Offerors shall include a Material/ODC estimate of $970,000.00 and a Travel estimate of $417,076.00 (figures do not include burdens which may be added).

(g) Supporting Documentation Requirements:

(1) Offerors shall provide the Basis of Estimate (BOE) supporting the costs/prices provided in the Cost/Price Summary including a description of the assumptions and computations used to develop the proposed costs/prices.

For material, offerors shall describe their methodology for ensuring prices are fair and reasonable. The prime contractor shall be responsible for justifying the reasonableness of each subcontractor and material costs.

(2) Direct Rate Supporting Documentation: Offerors shall provide payroll journals or equivalent for all labor rates proposed based on actuals.

(3) Indirect Rate Supporting Rate Documentation: Offerors shall provide the supporting information and identify the basis of proposed rates for indirect costs (e.g., Forward Pricing Rate Agreement and date of agreement, bidding rates and the date of submission; or, actual rates used and the effective date, billing rates, and the date of approval, etc.).

(4) Uncompensated Overtime: For the prime and each subcontractor, briefly summarize company policies on uncompensated time and state what, if any, impact the policies may have on the efforts described in the Statement of Work. In accordance with FAR 52.237-10 Identification of Uncompensated Overtime, if uncompensated time is included in the offer or any of the supporting cost data, the uncompensated time should be clearly identified with an explanation as to why it is needed.

(5) FCCOM: Offerors shall submit form CASB-CMF if proposing Facility Capital Cost of Money (FCCOM) and show the calculation of the proposed amount. Additional narrative may be submitted as a separate document, if necessary, to describe derivation of labor rates, use of uncompensated overtime pools to which indirect rates are applied, etc.

(6) Subcontracted Costs. Each subcontractor offeror estimate shall be addressed separately. Prime offerors shall briefly state in their Cost Narrative the contract type for each subcontractor offeror and provide rationale as to the appropriateness of the proposed subcontract type. This rationale shall include an analysis of the ability of the subcontractor offeror’s business systems to support the proposed subcontract type. This rationale shall include an analysis of the ability of subcontractor business systems to support the proposed subcontract type, including any supporting documentation (i.e., audits).

(7) Subcontractor offerors shall provide contact information for their cognizant DCAA and DCMA Branch Offices with the name, phone number, and email address of a point of contact for each who is familiar with their company.

(8) In accordance with current NAVSEA policy, for any fully burdened labor rate (calculated as direct labor plus all applicable burdens and fee) greater than $156.00 per hour, the Offeror shall provide a justification containing the following:

(a) Justify why the proposed individual qualifies for a fully burdened labor rate of greater than $156.00 per hour, focusing on specific qualifications and experience.

(b) Justify why the qualifications and experience outlined in (a) are needed to accomplish the tasking of the Statement of Work/Performance Work Statement, including why the tasking cannot…