N6660417R02830004.pdf

PDF 336 KB Posted

Attached to
Training Systems Development Federal contract opportunity
Solicitation number
N66604-17-R-0283
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to Training Systems Development, newest first.
File Type Posted
N6660417R02830003.pdf PDF
N6660417R02830002.pdf PDF
N6660417R02830001.pdf PDF
N6660417R0283.pdf PDF
2016-00262_IDIQ_SOW_FINAL_APPROVED.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

See page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6660417R0283

X 9B. DATED (SEE ITEM 11)

28-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Aug-2017

CODE

NAVAL UNDERSEA WARFARE CTR. DIV., NPT.

NEIL C. SANTOS, CODE 0222

CONTRACTS DEPARTMENT

1176 HOWELL STREET, BLDG. 1258

NEWPORT RI 02841

N66604 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6660417R0283

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

GENERAL INFORMATION

Control #: 170283

PR #: 1300571732

Electronic proposal submission is required per Solicitation Provision UW L-2-0001 by 02:00 PM EST

08/11/17.

Deadline for Industry Submission of Questions is hereby established. The deadline for RFP questions submission is 07/24/2017 – 02:00 PM EST. After this date and time, the Government may not respond to questions received.

CONTRACT TYPE

The Government contemplates award of an Indefinite Delivery-Indefinite Quantity (IDIQ) Multiple Award Contract

(MAC) with Firm Fixed Price, Cost Plus Fixed Fee, and Cost provisions. After planned MAC award, all subsequent task and delivery orders will be competed among qualified contractors in accordance with FAR 16.505, unless one of the exceptions to fair opportunity at FAR 16.505(b)(2)(i) applies. Individual orders under this contract may be issued on a term or completion basis.

The contract resulting from this solicitation will have a ceiling of $49,970,803.00

As referred to in paragraph (b) of the clause entitled, Indefinite Quantity (FAR 52.216-22), the contract maximum ceiling for all multiple awards combined is $49,970,803.00. This ceiling amount represents the total contract dollar value. Since this solicitation may result in multiple awards, cumulative orders issued to all contractors cannot exceed the total contract ceiling of $49,970,803.00.

Guaranteed Contract Minimum Amount: The Government’s minimum obligation will be satisfied with an initial

$2,500 Firm Fixed Price Order to participate in a Post Award Conference (CLIN 0001).

NAICS AND SIZE STANDARD

This requirement is being solicited as a 100% Small Business Set-Aside.

The North American Industry Classification System (NAICS) Code for this acquisition is 541712. The Small

Business Size Standard is 1000 Employees.

The purpose of Amendment 4 is as follows:

1. Answer Questions #41 - #48 posed by Industry (see below).

Amendment 1 (Answers to Questions posed by Industry)

1. Will the contractor be allowed to use labor categories not included on the NUWC Website or in the SCA labor category descriptions?

A) No, Labor Categories cited must be titles listed at the NUWC Division Newport Contracts

Website per the RFP. SCLS (Formerly SCA) does not apply to this acquisition as its principle purpose is not to furnish services.

2. UW L-2-0001 Instruction to Offerors - On page 89 of the solicitation regarding pricing it states “Offerors are encouraged to use the spreadsheet at the following link: http://www.navsea.navy.mil/Home/Warfare-

Centers/NUWCNewport/Partnerships/Commercial-Contracts/Information-eCraft-/Cost Price -Analyst/”. Will the use of a spreadsheet other than the one provided at this link result in a down grade or otherwise impact the evaluation of the Offeror’s submission”?

A) No, Offerors are encouraged to use this spreadsheet, but failure to do so in upon itself will not result in a downgrade or otherwise impact the evaluation of the Offeror’s submission.

3. RFP Clause UW C-2-0002 CONTRACTOR REQUIREMENTS FOR PERFORMANCE ON A GOVERNMENT

SITE (MAR 2017) implies that some work will be performed at Gov’t Site, but RFP 3.2 (a)(3) PERSONNEL (p.86) states “The Government anticipates that 0% of hours proposed will be Government site, and 100% of hours proposed will be contractor site.” Can the Government verify that all work should be proposed as CONTRACTOR site? If some work is to be performed at GOVT SITE, can USG identify which work and how much?

A) Section 3.2 Personnel (p.86) applies to SOW Task 4.2 which the Govt. anticipates that 0% of hours proposed will be Government site, and 100% of hours proposed will be contractor site. Clause UW C-

2-0002 CONTRACTOR REQUIREMENTS FOR PERFORMANCE ON A GOVERNMENT SITE (MAR

2017) deals with badging and security procedures that may be necessary during the course of the contract for deliveries, installation, and meetings.

4. UW L-2-0001 Instruction to Offerors - 3.1.2 Subfactor 2 SAMPLE TASK – states that SAMPLE TASK shall not exceed 10 pages, and is part of Technical Proposal (Vol II, 15p max). That leaves only 5 pages for the entire

Subfactor 1 Technical Approach. Is the 10p max allotted for SAMPLE TASK part of the 15p max for Vol II

Technical Proposal, or is the 10p max for SAMPLE TASK in addition to the 15p max Technical (for a total of 25p max)?

A) Amendment 1 will increase the Technical Proposal Volume II from a 15 page total limit to a 20 page limit. The Sample Task page limit (which is part of the Technical Proposal) remains 10 pages.

5. UW L-2-0001 Instruction to Offerors - 3.2(a)(1) PERSONNEL p. 86 – states “for Service Contract Labor

Standards (SCLS; formerly Service Contract Act (SCA)) Labor Categories Only: Offerors may propose an SCA labor category listed in the SCA Directory of Occupations (see http://www.dol.gov/whd/govcontracts/sca.htm) even if the SCA labor category is not listed at the NUWC Division Newport Contracts Website. Is this a DOL/WD SCLS

(SCA) contract? If yes, what state will be used for DOL/WD? Can USG provide WD for the appropriate state?

A) No, SCLS (Formerly SCA) does not apply to this acquisition as its principle purpose is not to furnish services.

6. Regarding UW L-2-0001 Instruction to Offerors - 3.2 Personnel (p.86) which volume does Personnel (Factor 2) go in? If it goes in the Volume II Technical Proposal is the Personnel (Factor 2) in addition to the 15-page limit in

Vol. II Technical Proposal, or is it included in the 15-page limit for that volume?

A) Personnel (Factor 2) goes in Vol. II. And is part of the page limit for Vol. II Technical Proposal.

However, Amendment 1 will increase the 15 page limit to 20 pages.

7. UW L-2-0001 Instruction to Offerors - 4.0(h) COST/PRICE (p. 90) Supporting Documentation Requirements:

states “… For materials offerors shall describe their methodology for ensuring prices are fair and reasonable. The prime contractor shall be responsible for justifying the reasonableness of each subcontractor or material costs.” If offeror is required to propose the ODC/Material and Travel NTE award values listed in 4.0(f), then why must prime offeror justify fair/reasonable price?

A) The offeror does not have to justify fair/reasonable pricing for any Plug NTE CLINs.

8. UW L-2-0001 Instruction to Offerors - 4.0(a) COST/PRICE (p.88) states “Cost or pricing data and information other than cost or pricing data, from both the prime contractor and all subcontractors performing any part of the level of effort, shall be provided via email and in the format outlined below (see FAR 52.215-20 Alt I). Is this an email requirement separate from the RFP 1.3 Submission Requirements stating “each Offeror shall submit its entire proposal electronically”?

A) No it is not separate.

9. UW L-2-0001 Instruction to Offerors - 4.0(b) COST/PRICE (p.88-89) states “------ Offerors shall provide a level of effort by labor category for CLIN 0002 and CLIN 0003 including subcontractor labor categories using eCRAFT categories”. Can the Government elaborate on requirement to “provide a level of effort” for CLIN 0003?

A) Reference to CLIN 0003 is removed.

10. Can the Government provide a copy of DI-ILSS-81076 that supports CDRL A002 Training Evaluation Plan, or direct offeror to a site where it can be downloaded? Offeror has located DI-PSSS-81524C Training Evaluation

Document (dated 20141120, PMA-205), but it does not specifically state that it supersedes DI-ILSS-81076.

A) Regarding CDRL A002 - The Government confirms that DI-ILSS-81076 has been superseded by

DI-PSSS-81524C.

11. For pricing purposes, what is the anticipated award date of this effort?

A) December 31, 2017.

12. Please clarify whether or not an SDP is required, whether or not Software Development/CMMI or equivalent experience is required, and what the evaluation factors are if so.

A) A software Development Plan is not required. Clause: HQ C-2-0065 SOFTWARE

DEVELOPMENT REQUIREMENTS (NAVSEA)(SEP 2012) has been removed.

13. UW L-2-0001 Instruction to Offerors - Page 90 of the RFP indicates that “offerors shall provide the Basis of

Estimate (BOE) supporting the costs/prices provided in the Cost/Price Summary…” Please clarify whether this applies only to the CPFF CLIN, or both CPFF and FFP CLIN.

A) Basis of Estimate (BOE) applies to only the CPFF CLIN.

14. UW L-2-0001 Instruction to Offerors - Page 82 of 98 of the RFP indicates a technical volume limit of 15 pages.

Page 85 of 98 indicates the Sample Task page limit shall not exceed 10 pages. Please clarify if the government anticipates the following sections within the remaining 5 page limit: details of how the work will be performed, details of processes/techniques to mitigate risk, detailed description of acquisition processes, personnel labor matrix and explanation of how the matrix correlates to SOW Task 4.2.

A) Amendment 1 will increase the Technical Proposal Volume II from a 15 page total limit to a 20 page limit. The Sample Task page limit (which is part of the Technical Proposal) remains 10 pages.

15. SOW 4.4 Training System & Simulation Development, states “The contractor shall develop blended training solutions to include Interactive Courseware (ICW), IMI and VTT, Three Dimensional Knowledge Objects (3KO), simulations, Operations and Casualty Control Simulations (OCCS), and virtual world technologies. The contractor shall develop and deliver adjudication matrices post review and throughout the product development until final

Government Acceptance. Is the use of the term Three Dimensional Knowledge Objects (3KO) meant to suggest the use of the NGRAIN tool and its 3KO object file format? Or is it meant as a generic reference to suggest capabilities similar to those inherent with the 3KO format?

A) Three Dimensional Knowledge Objects (3KO) is meant to suggest the use of the NGRAIN tool and its 3KO object file format.

Amendment 2 (Answers to Questions posed by Industry)

16. Request clarification on unit of measure that shall be used for CLIN 0002 (CDRL A002) Training Evaluation

Plan labor loading? CDRL states an estimate of 11 TEPs per year, but neither the SOW nor CDRL stipulate how many of hours of curriculum per TEP.

A) The Unit of Measure for CLIN 0001 is in fact "Hours". Neither the SOW nor CDRL stipulate how many hours of curriculum per TEP as it is unknown at this time and will be addressed specifically at the individual Task Order level. Historically the range has been as long as 70 training days and as short as 1 training day. A rough average of current in-production training days is approximately 17.4 training days.

17. UW L-2-0001 Instruction to Offerors 4.0(d) COST/PRICE states “… Offerors shall use a labor estimate of

103,680 hours for CLIN 0002. But then states “…Offerors shall fill in the total labor hours in Section H Clause

5252.216-9122 “Level of Effort”, paragraph (a), if the proposed total labor hours differ from those already indicated in the clause. ------ CLAUSE 5252.216-9122 LEVEL OF EFFORT (DEC 2000) states “(a) The Contractor agrees to provide the total level of effort specified in the next sentence in performance of the work described in Sections B and C of this contract. The total level of effort for the performance of this contract shall be 103,680 total man-hours of direct labor. Is offeror free to propose CLIN 0002 labor hours different than the quantity of 103,680?

A) No.

18. Clarification of Question 1 (Amendment 1) - Request the Government clarify that labor categories may be selected from either the NUWC Website or the SCA Directory of Occupations. (Note: Offeror understands that this contract is not an SCA contract per Amendment 0001, Answer 5.)

A) Yes, that is correct labor categories may be selected from either the NUWC Website or the SCA

Directory of Occupations as stated in UW L-2-0001 Instruction to Offerors -3.2 Personnel (a) (1) p. 86.

19. Will this Solicitation also be posted in the Seaport-E Portal?

Amendment 3 (Answers to Questions posed by Industry)

20. Are DCMA letters (confirming adequacy of accounting system) required only from the Prime, or are any subcontractors who are performing work on a CPFF basis required to submit a letter from DCMA as well?

A) Both Primes and Subcontractors who are proposing on Cost Reimbursement basis are required to provide. Per UW L-2-0001 Instruction to Offerors – 1.3 (d)(9).

21. If the offeror proposes the STR as Key Personnel, can the STR also be dual-hatted and serve in the position of

Senior Project Manager as well, or is the STR a stand-alone position?

A) The STR can be “dual-hatted”.

22. What is the anticipated number of awards under this Solicitation?

A) The Government intends to make Multiple Awards; the exact number is unknown at this time.

23. Will the Government permit an Offeror to submit a Prime bid and participate as a subcontractor on one or more other Prime bids?

A) The Government does not prohibit such an arrangement on this acquisition. The Government will leave it up to the Contractor’s business judgment as to its appropriateness.

24. Given the scope of this contract applies to providing services that support exceptions under Section 508

Standards, we believe the VPAT requirements and Clause UW C-2-0003 should be removed from this solicitation.

Does the Government concur with this assessment?

25. RFP Section H incorporates the FAR and DFARS Earned Value Management System (EVMS) clauses. Is it the

Government’s intent for this requirement to be fulfilled in responses to this solicitation?

A) No. EVMS - FAR and DFAR Clauses are removed in Amendment 3.

26. UW L-2-0001 3.2(a): Does the labor matrix count toward the page total listed in Section 1.3(c)?

A) Yes.

27. UW L-2-0001 3.2(a)(5): Do signed statements indicating intent to be hired or relocated count toward the page total listed in Section 1.3(c)?

A) No, they are excluded from the page count.

28. UW L-2-0001 3.2(b)(c): Does the STR resume and/or other related STR descriptions specified count toward the page total listed in Section 1.3(c)? Does the information regarding work weeks in excess of 40 hours count toward the page total listed in Section 1.3(c)?

A) Yes, they both count towards the page total.

29. UW L-2-0001 3.3(c): Request clarification on how the percentage of subcontractor performance will be determined versus the total price of the contract because there is no obvious requirement for pricing of CLINs 0004 and 0005 other than the Not-to-Exceed (NTE) amounts.

A) UW L-2-0001 3.3(c) has been updated in Amendment 3 to clarify.

30. UW L-2-0001 4.0(b) and (c): Request clarification on how the Prime Offeror is to include subcontractor labor categories and justify the reasonableness of each subcontractor’s cost if subcontractors will not provide level of effort under CLIN 0002.

A) They would not. UW L-2-0001 4.0(b) and (c) only pertain to CLIN 0002.

31. Will the government allow a Table of Contents and/or a Solicitation Requirements Compliance Matrix to be included and not count against the page total for each volume?

A) Yes.

32. As the nature of the contract is IDIQ and volume of total tasking against each CLIN is unknown, it is impossible to determine if a subcontractor will perform 25% of the overall contract value. May a Past Performance of a subcontractor that is proposed, but not priced for FFP CLINS that may perform certain niche functions be included for scope coverage purposes?

A) See Question/Answer #29.

33. Will the government allow cross teaming between prime contractors after award at the Task order level?

34. If a subcontractor is not bid under CLIN 0002, does that eliminate them from potential performance of SOW

Task 4.2 during execution?

A) No, but the Contractor would be responsible to adhere to Clause 52.244-2 Subcontracts (Oct.

2010). (Updated in Amendment 3)

35. Teaming – As the nature of the contract is IDIQ and may require niche subcontractors in specific competency areas, is it the government’s intention to allow subcontractors to be identified and added at the task order level?

Will adding teaming partners after the base IDIQ level award be allowed?

A) Yes, In accordance with 52.244-2 Subcontracts (Oct. 2010). (Updated in Amendment 3)

36. The sample task response requirements from section L.3.1.2 states it pertains only to SOW section 4.4. Is it the government’s intention for offerors not to include the Curriculum Development LOE (SOW 4.3) as part of what is necessary to “provide a Blended Training Solution…” IAW L.3.1.2?

A) Yes, that is the Government's intent, for the Offerors not to include the Curriculum Development

LOE (SOW 4.3) as part of what is necessary to provide a Blended Training Solution.

37. UW L-2-0001 3.1.2: In reference to the Sample Task, is there a specific subject area (for example, HM&E), task area (for example, operations versus maintenance), and size (for example, content length in hours) applicable to the

Blended Training Solution Instructional/Training Media Package of the Sample Task? These factors will impact the labor categories and the level of effort required to complete the Sample Task. Is it the Government’s intent that each offeror unilaterally define their own sample task problem statement, technical approach, and labor estimate (possibly off-the-shelf from a previous development project)?

A) Yes, the Government did not specify a subject area for reasons of open and fair competition. The intent is for the offeror to define their own sample task response, technical approach and labor estimate.

38. UW L-2-0001 3.2(a): It is unclear what the SOW Task Areas are for SOW Task 4.2 because there are no numbered subtask areas such as those provided for SOW Task 4.1, which includes subtasks 4.1.1 through 4.1.6.

Please define each task area to be included in the labor matrix.

A) Each Task Area is defined. However, they have been relabeled as 4.2.1 & 4.2.2 in the SOW to make it easier for the offeror to propose a labor matrix.

39. UW L-2-0001 4.0(g): Given the contract maximum ceiling of $49,970,803; the not to exceed award values of

$2,500 for CLIN 3, $10,923,000 for CLIN 4 and $34,141,500 for CLIN 5, and the plug numbers of $25,000 and

$150,450 for CLIN 3; only $4,728,353 remains for (CPFF) CLIN 2. The average labor rate implied seems low for the Instructional Systems Plan in Statement of Work 4.2. Request the Government consider reducing the number of labor hours to allow for the bidding of a more realistic labor rate commensurate with the personnel qualifications necessary to accomplish the tasking.

A) There was a mistake made in number of labors hours for CLIN 0002 as it was erroneously figured based on a 5 year POP instead of the actual required 3 year POP. The correct number of hours has been changed to reflect 62,208 hrs. (Amendment 3) Due to this error the closing date of the Solicitation will also be extended in this Amendment.

40. Does the offeror’s total IDIQ Cost have to be at or below the IDIQ ceiling of $49,970,803.00? Is offeror’s total

IDIQ cost part of the evaluation criteria?

A) No, there is no stated requirement to do so. CLINs 0002 and 0003 will be evaluated for cost realism purposes. However, the total IDIQ ceiling will be $49,970,803.00 for all Multiple Awardees combined. Also, see Question #39 above.

Amendment 4 (Answers to Questions posed by Industry)

41. Where can we get a copy of this manual? (3.0 Applicable Documents, 3.67 Training System Development and

Integration Manual)

A) A copy is posted with this Amendment on FBO.

42. Can the government please confirm that CLIN 0003 is a plug number with applied burdens and nothing else?

A) Yes. RFP Clause UW L-2-0001 4.0 Cost/Price (f) p.89 answers this question. Also, see question

#9 (Amendment 1) for a related question and answer.

43. The RFP states that CLIN 0003 (travel, material/ODC) corresponds to SOW 4.2 and CLIN 002 as stated in 3.2 on page 86. Where are the travel/ODCs for the other CLINs and/or SOW paragraphs for curriculum development, content development and installation? Will travel be required to perform installation?

A) If there is any applicable Travel or ODC’s for the FFP CLINS, they have been already accounted for in the provided Ceiling Plug numbers. The requirements will be fully defined and competed at the

Task/Delivery Order level. It is anticipated that travel would be required to perform any installation.

44. With nearly $45m of Plug numbers, what cost/price evaluation criteria will be used?

A) Answered in Question #40 (Amendment 3).

45. If CLIN 0002/SOW 4.2 will be the only labor categories priced and all other scope covered by a plug numbers, how will the offeror propose prices for labor categories not related to SOW 4.2 (All FFP CLINs)? Or will these labor categories be proposed at the task order level?

A) There is no stated requirement for an offeror to propose prices for labor categories not related to

SOW Task 4.2. The requirements for any competed FFP Task/Delivery Order will be provided at the time the Order is advertised for competition.

46. Are TOCs separate from page count? Should each volume contain a TOC?

A) Answered in Question #31 (Amendment 3). It is up to the Offeror whether each Volume contains a TOC.

47. Is a Conflict of Interest Mitigation Plan required if the offeror has no conflicts of interest or potential conflicts of interest?

48. Are contractors permitted to submit burdened labor rates as one rolled-up percentage value inclusive of overhead, G&A, FCCOM, etc.?

(End of Summary of Changes)