N6660417R0064P00001.pdf
PDF 116 KB Posted
- Attached to
- OK-410 Handling and Storage Group Federal contract opportunity
- Solicitation number
- N66604-15-R-3315
About this file
Solicitation Amendment with questions and answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6660417R00640006.pdf | ||
| N6660417R0064U0005.pdf | ||
| OK-410_Performance_Payments_schedule_CLIN0002.xlsx | XLSX spreadsheet | |
| N6660417R0064U0004.pdf | ||
| N6660417R0064A0003.pdf | ||
| IWS5B_Surface_Ship_USW_Combat_Systems_Configuration_Management_Plan.pdf | ||
| N6660417R0064A0002.pdf | ||
| N6660417R0064_GOVERNMENT_FURNISHED_PROPERTY_MADE_AVAILABLE.pdf | ||
| N66604-17-R-0064.pdf | ||
| OK410V4_pre-sol_conference_presentation_FINAL.pdf | ||
| OK-410_Pre-Sol_Conference_Registration_list.pdf | ||
| OK-410_Pre-Sol_Conference_Q A.pdf | ||
| Pre-Sol_Conf__Announcement_Code_15_OK_410.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to provide questions and answ ers (1-7) as a result of questions asked, Extend the Question & Answ er Period, Extend the proposal submission date, and to add the GFI listing in Section J.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jan-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N66604-17-R-0064
X 9B. DATED (SEE ITEM 11)
09-Jan-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jan-2017
CODE
NAVAL UNDERSEA WARFARE CTR. DIV., NPT.
BRIAN K. ROCHELLE, CODE 0223
CONTRACTS DEPARTMENT
1176 HOWELL STREET, BLDG. 1258
NEWPORT RI 02841
N66604 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N66604-17-R-0064
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 03-Mar-2017 02:00 PM to 24-Mar-2017 02:00 PM.
The following have been modified:
GENERAL INFORMATION
Distribution: FILE, KR, NUWC 0121, DCMA, DFAS, COR
NUWCDIVNPT Control Number: 170064
NUWCDIVNPT Requisition Number(s): N66604-1300307472
NUWCDIVNPT POC: Brian Rochelle, Email: brian.rochelle@navy.mil
Offerors shall submit proposals by electronic means rather than in accordance with the template proposal requirements on the cover page o fthe SF-33. All electronic submissions shall be sent to, Brian Rochelle, brian.rochelle@navy.mil. Please copy Andrew Nagelhout, andrew.c.nagelhout@navy.mil for all electronic submissions and questions. All submissions must be received by the closing date and time located on the cover page of the SF-33. Furthermore, a single electronic submission shall not exceed 5 megabytes. If this requires submission through multiple emails to send the complete proposal the first email shall include an accounting of each email to follow so the Government can determine it has a complete proposal. Proposal attachments must be in formats readable by Microsoft Office 10 or Adobe PDF. This solicitation is unrestricted.
NOTE 1: For pricing purposes the anticipated award date of this contract is 22 June, 2017.
NOTE 2: For all clauses where no CLIN applicability is called out, that clause is applicable to all CLINs.
The purpose for this solicitation amendment is to:
1. Provide questions asked by industry along with their corresponding answers (below).
2. Extend the Question & Answer Period from 14 days (Tuesday, 24 January 2017) by 14 days to 28 days (Tuesday, 7 February 2017).
3. Extend the proposal due date from 52 days (Friday, 3 March 2017) by 22 days to 74 days (Friday, 24
March 2017).
4. Add the Government Furnished Property listing, as Attachment 4, to Section J.
SOLICITATION QUESTIONS AND ANSWERS
Q1: We hereby request an extension of at least 4 weeks beyond the March 3rd, 2017 due date for offer submission. Based on previous NUWC information provided, our company has been anticipating receiving initially a draft RFP that would provide us with what we believe would be adequate duration to perform a thorough assessment of the revised technical data package, Statement of Work, and all other solicitation requirements in order to prepare a price and overall proposal submission.
This is one of the Qs & As from the Pre‐Solicitation Conference Presentation held at NUWC on September 17th, 2015 and posted on September 25th, 2015:
Q: Will NUWC be providing the CLIN structure prior to the RFP release?
A: NUWC will put a draft RFP out at least 2 weeks in advance of the RFP.
“We always have the option to do a draft RFP. What I would say in this case is because of the dollar threshold and the fact that there’s going to be NAVSEA involvement at every stage, it’s highly likely that we would actually put a draft RFP out for this, so I guess I’ll commit to this right now. We’ll put a draft RFP out at least 2 weeks in advance of the RFP hitting the street. I guess we could do that; if not more.”
A1: As a result of the solicitation conference briefing slides for Proposal Due date showing 60 days after RFP release, the Government will extend the RFP submission deadline from 52 days to 74 days (Friday 24 March 2017). This extension will also address the previously anticipated 14 day draft RFP period. The Government determined, based on the solicitation requirements, that 74 days is sufficient time for all offerors to respond adequately to the solicitation since a preliminary Technical Data Package (TDP) was provided at the Industry Day and changes between the preliminary and final TDP are not significant.
Q2: Are all of the listed FAT tests in 4‐1 required to be conducted on each production H&SG?
A2: Yes. All Factory Acceptance Tests (FAT) listed in 4‐1 of the Performance Spec, as well as the Electro‐Optical Slip Ring Assembly (EOSRA) Test Specification are required tests to be conducted on each production H&SG.
Q3: To enable FAT testing will the Government be providing as GFE representative tow cables and towed arrays to be used for testing? And, if so, will multiple cable sets be provided, as we estimate that wear and tear from the rigors of testing will require multiple test tow cables and arrays.
A3: Yes. The Government will provide representative tow cables and array modules as needed to complete required testing as described in the attached Government Furnished Property Made Available form.
Q4: We understand that H&SG units have been or are being built by Rolls Royce Naval Marine Canada, who also undertook the design modification work on the V4 H&SG. We would therefore assume the Government contracted with this company to develop and have approved a Factory Test Procedure required to carry out all of the tests listed in Table 4‐1. Assuming this is Government property, can this Test Procedure be provided to bidders?
A4: The current Factory Test Procedure is somewhat specific to the Rolls Royce test facility equipment and does not necessarily represent the way another vendor might test the same requirements. It also does not presently address all test requirements in the current Performance Specification and Electro‐Optical Slip Ring Assembly (EOSRA) Test Specification.
Per Statement of Work, section 4.3.2 and in accordance with CDRL A005, the Government requires a new (vendor specific) Factory Acceptance Test Procedure. It is not the Governments intent to provide the current Factory Test Procedure to bidders.
Q5: Schedule: We request a significant extension of the proposal due date. At the Pre‐ Solicitation Conference held on 17SEP2015, substantial emphasis was placed on NUWC’s goals including: a. Increase overall competition by ensuring all companies have a fair opportunity to compete and b. ?Encourage new vendors to bid. It was stated that a draft RFP would likely be available 2‐3 weeks before the final RFP release and that the response time would be 60 days after final release. Obviously, a very large amount of time has passed since the DEC2015 intended release date. All potential new vendors have been working on other programs. On 10JAN2017, as you know, the final RFP was released with no advance notice and no draft. This puts everyone other than the incumbent at a major disadvantage as we work to quickly re‐ familiarize ourselves with the TDP details. Further, since it was announced that the TDP had changes, we had to wait until we received the new version until we could begin preparing to bid.
Preparing a compliant costing for this large program proposal under this 52 day delivery requirement is essentially impossible. An extension until at least early April seems appropriate to truly encourage competition for this large production program
A5: See response to question 1.
Q6: Small Business: We request consideration of an increase to the small business participation goal. NUWC admirably had a 25% goal in FY14 and a 35% goal in FY15. However, for the subject proposal, the small business participation goal is only 10%. This is a build to print production program with many assemblies and subassemblies requiring a wide variety of manufacturing skill sets. The incumbent, as well as their most likely lead competitor, are both non‐US, large businesses. Having a significantly higher small business participation goal will ensure that more of the Navy’s funds are expended with US manufacturers, specifically small businesses.
A6: The small business participation percent minimum will remain at 10%. This was set and developed based on this specific requirement and finalized with the concurrence of both the Small Business Advocate (SBA) here at NUWC as well as the regional SBA representative.
Q7: Test Facilities: NUWC Newport has a number of specialized facilities specifically for testing and refurbishing handling systems such as the OK‐410. Can respondents to this solicitation propose using these NUWC facilities for some of the required testing? If so, please provide guidance on how to contact appropriate personnel at NUWC to solicit cost estimates.
A7: The Naval Undersea Warfare Center Division Newport (NUWCDIVNPT) does not have the capability to make available adequate test facilities to meet the Factory Acceptance Test requirements therefore NUWC will not provide this as an option during performance.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
HQ J-2-0002 STANDARD LANGUAGE FOR CONTRACTS
The following document(s), exhibit(s), and other attachment(s) form a part of this contract:
Exhibits A – Contract Data Requirements Listing (CDRLs)
Attachment 1: Performance Requirements Summary Table (PRST)
Attachment 2: Approved Key Personnel List (to be attached at award)
Attachment 3: Data Rights Assertions List, in accordance with 252.227.7017 (to be provided by offeror)
Attachment 4: Government Furnished Property Made Available listing
(End of Summary of Changes)
File details come from the government source that posted it. Updated .