RFP Attachment 8 - Cost Matrix N66001-18-R-0110.xlsx

XLSX spreadsheet 125 KB Posted

Attached to
Special Projects and Electronics Systems
Solicitation number
N66001-18-R-0110
Issued by

About this file

This document contains a cost proposal template and instructions for a federal contract opportunity. The template outlines cost elements for labor, materials, overhead, and other direct costs for the Special Projects and Electronics Systems solicitation from the Department of the Navy Information Warfare Systems Command. The template includes sections for prime contractor and subcontractor labor rates and costs by fiscal year, indirect rate tables, and formulas to calculate cost of money, fee amounts, and total cost plus fixed fee. It provides a framework for offerors to populate their own proposed costs according to the instructions.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Summary

Solicitation Number:
Prime Offeror:
Subcontractors:
DCAA & DCMA Point of Contact Information:
ELEMENTPROPOSEDOPTION 1
LaborELEMENTPROPOSED
Labor O/HCLIN 0004 Services
Labor FringeCost
SubcontractsFee
Subcontractor HandlingCPFF
ODC
G&ACLIN 0005 ODC
Cost
Subtotal
COMCLIN 0006 NSP CDRL$0.00
Fee/Profit
TOTAL OPTION 1
TOTAL
BASE PERIODOPTION 2
ELEMENTPROPOSEDELEMENTPROPOSED
CLIN 0001 ServicesCLIN 0007 Services
CostCost
FeeFee
CPFFCPFF
CLIN 0002 ODCCLIN 0008 ODC
CostCost

CLIN 0003 NSP CDRL $0.00 CLIN 0009 NSP CDRL $0.00

TOTAL BASE PERIOD TOTAL OPTION 2

Note: Numbers added to demonstrate the functionality of the spreadsheet; all values and labor catagories should be replaced in accordance with the offeror's information and in accordance with the instructions in Provision L-TXT-12.

Year I

Solicitation Number:
Prime Offeror:
Subcontractors:
Indirect Rate ElementsRATES
Overhead - Contractor Site A (KTR FY 1)0.00%
Overhead-Contractor Site A (KTR FY 2)0.00%
Overhead - Government Site B (KTR FY 1)0.00%
Overhead - Government Site B (KTR FY 2)0.00%
Fringe Benefits0.00%
G&A (KTR FY 1)0.00%
G&A (KTR FY 2)0.00%
Material and Handling0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
COM0.00%
Fee On Sub0.00%
Fee on Prime0.00%
Contractor's Fiscal Year 1Contractor's Fiscal Year 2
Cost ElementsRFP Labor CategoryAdditional Code/TitleRT RateOT RateRT HoursOT HoursRT AmountOT AmountCost ElementsRFP Labor CategoryAdditional Code/TitleRT RateOT RateRT HoursOT HoursRT AmountOT Amount
Prime Contractor Labor CostPrime Contractor Labor Cost
Prime Contractor Direct Labor - Contractor SitePrime Contractor Direct Labor - Contractor Site
Named Personnel / Bid CodePMNA$ 1.00$ 1.0011$ 1.00$ 1.00
Unnamed PersonnelLaborer5233$ 1.00$ 1.001.01.0$ 1.00$ 1.00
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
Total Contractor Site
$ 2.00$ 2.00
Prime Contractor Direct Labor - Government Site
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Total Government Site$ - 0$ - 0Total Government Site$ - 0$ - 0
Total Direct Labor Cost2.02.0$ 2.00$ 2.00Total Direct Labor Cost0.00.0$ - 0$ - 0
Prime Contractor Indirect Labor CostPrime Contractor Indirect Labor Cost
Overhead - Contractor Site A (KTR FY 1)0.00%$ - 0$ - 0Overhead-Contractor Site A (KTR FY 2)0.00%$ - 0$ - 0
Overhead - Government Site B (KTR FY 1)0.00%$ - 0$ - 0Overhead - Government Site B (KTR FY 2)0.00%$ - 0$ - 0
Fringe Benefits0.00%$ - 0$ - 0Fringe Benefits0.00%$ - 0$ - 0
Material and Handling0.00%$ - 0$ - 0G&A (KTR FY 2)0.00%$ - 0$ - 0
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Indirect Labor Cost$ - 0Total Indirect Labor Cost$ - 0

Total Prime Contractor Labor Cost $ 4.00 Total Prime Contractor Labor Cost $ - 0

Subcontractor Labor CostSubcontractor Labor Cost
Subcontractors - Contractor SiteSubcontractors - Contractor Site
Cost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT AmountCost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT Amount
None$ - 0$ - 0None$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Subcontractors - Government Site List the Subcontractor & Name of PersonSubcontractors - Government Site List the Subcontractor & Name of Person
$ - 0$ - 0$ - 0$ - 0
ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0

Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00 Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00

Prime contractor pass through (not including fee)Prime contractor pass through (not including fee)
Material and Handling0.00%$ - 0$ - 0Material and Handling0.00%$ - 0$ - 0
G&A (KTR FY 1)0.00%$ - 0$ - 0G&A (KTR FY 2)0.00%$ - 0$ - 0
ERROR:#N/AERROR:#N/A
Total pass through (not including fee)$ - 0Total pass through (not including fee)$ - 0
Total Subcontractor Cost including pass through$ 3,900.00Total Subcontractor Cost including pass through$ 3,900.00

Total Labor Cost (Prime and Subcontractor Labor) 52 22 $ 3,904.00 Total Labor Cost (Prime and Subcontractor Labor) 50 20 $ 3,900.00

Fixed FeeFixed Fee
Fee On Sub0.00%$ - 0Fee On Sub0.00%$ - 0
Fee on Prime0.00%$ - 0Fee on Prime0.00%$ - 0
Total Fee (for Prime and Subcontractor Labor)$ - 0Total Fee (for Prime and Subcontractor Labor)$ - 0

Total Labor Cost Plus Fixed Fee (CPFF) $ 3,904.00 Total Labor Cost Plus Fixed Fee (CPFF) $ 3,900.00

Material (BASE Amount)$ 100,000.00Material (BASE Amount)$ 100,000.00
Material and Handling0.00%$ - 0Material and Handling0.00%$ - 0
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Material$ 100,000.00Total Material$ 100,000.00
ODC/Travel/Shipping (BASE Amount)$ 2,500.00ODC/Travel/Shipping (BASE Amount)$ 2,500.00
G&A (KTR FY 1)0.00%$ - 0G&A (KTR FY 2)0.00%$ - 0
ERROR:#N/AERROR:#N/A
Total ODC/Travel$ 2,500.00Total ODC/Travel$ 2,500.00

Total ODCs $ 102,500.00 Total ODCs $ 102,500.00

COM 0.00% 15 COM 0.00% 15

Total CPFF (Labor and ODCs)$ 106,404.00Total CPFF (Labor and ODCs)$ 106,400.00
Grand Total
Input rates for the applicable period
Place formula in this cell. Rate or factor to be utilized must come from the rate corresponding with the rate category drop down menu.
Do not manipulate this cell
Offeror input via dropdown menu for cells in column "B" or direct input in other cells
If offeror controlled cells within the yellow highlighted areas are changed, the offeror must ensure the summation formula includes the newly created rows.
Note: Numbers added to demonstrate the functionality of the spreadsheet; all values and labor categories should be replaced in accordance with the offeror's information and in accordance with the instructions in Provision L-317.
The rates populating the Yellow highlighted B Column cells are pulled from the Green Chart titled "RATES". The rates input into the RATES table must be accurate. The contractor also has to ensure the yellow cells are calling the correct rate corresponding with the pulldown rate selected by the contractor.
The contractor only needs to use both FY periods within each contract period if rates change in the middle of the contract period, otherwise leave the "FY 2" cost template blank.
"Other Indirect Rate" shall be updated by the offeror, if needed.

Year II

Solicitation Number:
Prime Offeror:
Subcontractors:
Indirect Rate ElementsRATES
Overhead - Contractor Site A (KTR FY 2)0.00%
Overhead-Contractor Site A (KTR FY 3)0.00%
Overhead - Government Site B (KTR FY 1)0.00%
Overhead - Government Site B (KTR FY 2)0.00%
Fringe Benefits0.00%
G&A (KTR FY 2)0.00%
G&A (KTR FY 3)0.00%
Material and Handling0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
COM0.00%
Fee On Sub0.00%
Fee on Prime0.00%
Contractor's Fiscal Year 2Contractor's Fiscal Year 3
Cost ElementsRFP Labor CategoryAdditional Code/TitleRT RateOT RateRT HoursOT HoursRT AmountOT AmountCost ElementsRFP Labor CategoryAdditional Code/TitleRT RateOT RateRT HoursOT HoursRT AmountOT Amount
Prime Contractor Labor CostPrime Contractor Labor Cost
Prime Contractor Direct Labor - Contractor SitePrime Contractor Direct Labor - Contractor Site
Named Personnel / Bid CodePMNA$ 1.00$ 1.0011$ 1.00$ 1.00
Unnamed PersonnelLaborer5233$ 1.00$ 1.001.01.0$ 1.00$ 1.00
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
Total Contractor Site
$ 2.00$ 2.00
Prime Contractor Direct Labor - Government Site
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Total Government Site$ - 0$ - 0Total Government Site$ - 0$ - 0
Total Direct Labor CoRT2.02.0$ 2.00$ 2.00Total Direct Labor CoRT0.00.0$ - 0$ - 0
Prime Contractor Indirect Labor CostPrime Contractor Indirect Labor Cost
Overhead - Contractor Site A (KTR FY 2)0.00%$ - 0$ - 0Overhead-Contractor Site A (KTR FY 3)0.00%$ - 0$ - 0
Overhead - Government Site B (KTR FY 2)0.00%$ - 0$ - 0Overhead - Government Site B (KTR FY 3)ERROR:#N/AERROR:#N/AERROR:#N/A
Fringe Benefits0.00%$ - 0$ - 0Fringe Benefits0.00%$ - 0$ - 0
Material and Handling0.00%$ - 0$ - 0G&A (KTR FY 3)0.00%ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Indirect Labor Cost$ - 0Total Indirect Labor CostERROR:#N/A

Total Prime Contractor Labor Cost $ 4.00 Total Prime Contractor Labor Cost ERROR:#N/A

Subcontractor Labor CostSubcontractor Labor Cost
Subcontractors - Contractor SiteSubcontractors - Contractor Site
Cost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT AmountCost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT Amount
None$ - 0$ - 0None$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Subcontractors - Government Site List the Subcontractor & Name of PersonSubcontractors - Government Site List the Subcontractor & Name of Person
$ - 0$ - 0$ - 0$ - 0
ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0

Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00 Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00

Prime contractor pass through (not including fee)Prime contractor pass through (not including fee)
Material and Handling0.00%$ - 0$ - 0Material and Handling0.00%$ - 0$ - 0
G&A (KTR FY 2)0.00%$ - 0$ - 0G&A (KTR FY 3)0.00%$ - 0$ - 0
ERROR:#N/AERROR:#N/A
Total pass through (not including fee)$ - 0Total pass through (not including fee)$ - 0
Total Subcontractor Cost including pass through$ 3,900.00Total Subcontractor Cost including pass through$ 3,900.00

Total Labor Cost (Prime and Subcontractor Labor) 52 22 $ 3,904.00 Total Labor Cost (Prime and Subcontractor Labor) 50 20 ERROR:#N/A

Fixed FeeFixed Fee
Fee On Sub0.00%$ - 0Fee On Sub0.00%$ - 0
Fee on Prime0.00%$ - 0Fee on Prime0.00%ERROR:#N/A
Total Fee (for Prime and Subcontractor Labor)$ - 0Total Fee (for Prime and Subcontractor Labor)ERROR:#N/A

Total Labor Cost Plus Fixed Fee (CPFF) $ 3,904.00 Total Labor Cost Plus Fixed Fee (CPFF) ERROR:#N/A

Material (BASE Amount)$ 100,000.00Material (BASE Amount)$ 100,000.00
Material and Handling0.00%$ - 0Material and Handling0.00%$ - 0
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Material$ 100,000.00Total Material$ 100,000.00
ODC/Travel/Shipping (BASE Amount)$ 2,500.00ODC/Travel/Shipping (BASE Amount)$ 2,500.00
G&A (KTR FY 2)0.00%$ - 0G&A (KTR FY 3)0.00%$ - 0
ERROR:#N/AERROR:#N/A
Total ODC/Travel$ 2,500.00Total ODC/Travel$ 2,500.00

Total ODCs $ 102,500.00 Total ODCs $ 102,500.00

COM 0.00% 15 COM 0.00% 15

Total CPFF (Labor and ODCs)$ 106,404.00Total CPFF (Labor and ODCs)ERROR:#N/A
Grand Total
Input rates for the applicable period
Place formula in this cell. Rate or factor to be utilized must come from the rate corresponding with the rate category drop down menu.
Do not manipulate this cell
Offeror input via dropdown menu for cells in column "B" or direct input in other cells
If offeror controlled cells within the yellow highlighted areas are changed, the offeror must ensure the summation formula includes the newly created rows.
Note: Numbers added to demonstrate the functionality of the spreadsheet; all values and labor categories should be replaced in accordance with the offeror's information and in accordance with the instructions in Provision L-317.
The rates populating the Yellow highlighted B Column cells are pulled from the Green Chart titled "RATES". The rates input into the RATES table must be accurate. The contractor also has to ensure the yellow cells are calling the correct rate corresponding with the pulldown rate selected by the contractor.
The contractor only needs to use both FY periods within each contract period if rates change in the middle of the contract period, otherwise leave the "FY 2" cost template blank.
"Other Indirect Rate" shall be updated by the offeror, if needed.

Year III

Solicitation Number:
Prime Offeror:
Subcontractors:
Indirect Rate ElementsRATES
Overhead - Contractor Site A (KTR FY 3)0.00%
Overhead-Contractor Site A (KTR FY 4)0.00%
Overhead - Government Site B (KTR FY 1)0.00%
Overhead - Government Site B (KTR FY 2)0.00%
Fringe Benefits0.00%
G&A (KTR FY 3)0.00%
G&A (KTR FY 4)0.00%
Material and Handling0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
COM0.00%
Fee On Sub0.00%
Fee on Prime0.00%
Contractor's Fiscal Year 3Contractor's Fiscal Year 4
Cost ElementsRFP Labor CategoryAdditional Code/TitleRT RateOT RateRT HoursOT HoursRT AmountOT AmountCost ElementsRFP Labor CategoryAdditional Code/TitleRT RateOT RateRT HoursOT HoursRT AmountOT Amount
Prime Contractor Labor CostPrime Contractor Labor Cost
Prime Contractor Direct Labor - Contractor SitePrime Contractor Direct Labor - Contractor Site
Named Personnel / Bid CodePMNA$ 1.00$ 1.0011$ 1.00$ 1.00
Unnamed PersonnelLaborer5233$ 1.00$ 1.001.01.0$ 1.00$ 1.00
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
Total Contractor Site
$ 2.00$ 2.00
Prime Contractor Direct Labor - Government Site
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Total Government Site$ - 0$ - 0Total Government Site$ - 0$ - 0
Total Direct Labor Cost2.02.0$ 2.00$ 2.00Total Direct Labor Cost0.00.0$ - 0$ - 0
Prime Contractor Indirect Labor CostPrime Contractor Indirect Labor Cost
Overhead - Contractor Site A (KTR FY 3)0.00%$ - 0$ - 0Overhead-Contractor Site A (KTR FY 4)0.00%$ - 0$ - 0
Overhead - Government Site B (KTR FY 3)ERROR:#N/AERROR:#N/AERROR:#N/AOverhead - Government Site B (KTR FY 4)ERROR:#N/AERROR:#N/AERROR:#N/A
Fringe Benefits0.00%$ - 0$ - 0Fringe Benefits0.00%$ - 0$ - 0
Material and Handling0.00%ERROR:#N/AERROR:#N/AG&A (KTR FY 4)0.00%ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Indirect Labor CostERROR:#N/ATotal Indirect Labor CostERROR:#N/A

Total Prime Contractor Labor Cost ERROR:#N/A Total Prime Contractor Labor Cost ERROR:#N/A

Subcontractor Labor CostSubcontractor Labor Cost
Subcontractors - Contractor SiteSubcontractors - Contractor Site
Cost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT AmountCost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT Amount
None$ - 0$ - 0None$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Subcontractors - Government Site List the Subcontractor & Name of PersonSubcontractors - Government Site List the Subcontractor & Name of Person
$ - 0$ - 0$ - 0$ - 0
ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0

Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00 Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00

Prime contractor pass through (not including fee)Prime contractor pass through (not including fee)
Material and Handling0.00%$ - 0$ - 0Material and Handling0.00%$ - 0$ - 0
G&A (KTR FY 3)0.00%$ - 0$ - 0G&A (KTR FY 4)0.00%$ - 0$ - 0
ERROR:#N/AERROR:#N/A
Total pass through (not including fee)$ - 0Total pass through (not including fee)$ - 0
Total Subcontractor Cost including pass through$ 3,900.00Total Subcontractor Cost including pass through$ 3,900.00

Total Labor Cost (Prime and Subcontractor Labor) 52 22 ERROR:#N/A Total Labor Cost (Prime and Subcontractor Labor) 50 20 ERROR:#N/A

Fixed FeeFixed Fee
Fee On Sub0.00%$ - 0Fee On Sub0.00%$ - 0
Fee on Prime0.00%ERROR:#N/AFee on Prime0.00%ERROR:#N/A
Total Fee (for Prime and Subcontractor Labor)ERROR:#N/ATotal Fee (for Prime and Subcontractor Labor)ERROR:#N/A

Total Labor Cost Plus Fixed Fee (CPFF) ERROR:#N/A Total Labor Cost Plus Fixed Fee (CPFF) ERROR:#N/A

Material (BASE Amount)$ 100,000.00Material (BASE Amount)$ 100,000.00
Material and Handling0.00%$ - 0Material and Handling0.00%$ - 0
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Material$ 100,000.00Total Material$ 100,000.00
ODC/Travel/Shipping (BASE Amount)$ 2,500.00ODC/Travel/Shipping (BASE Amount)$ 2,500.00
G&A (KTR FY 3)0.00%$ - 0G&A (KTR FY 4)0.00%$ - 0
ERROR:#N/AERROR:#N/A
Total ODC/Travel$ 2,500.00Total ODC/Travel$ 2,500.00

Total ODCs $ 102,500.00 Total ODCs $ 102,500.00

COM 0.00% 15 COM 0.00% 15

Total CPFF (Labor and ODCs)ERROR:#N/ATotal CPFF (Labor and ODCs)ERROR:#N/A
Grand Total
Input rates for the applicable period
Place formula in this cell. Rate or factor to be utilized must come from the rate corresponding with the rate category drop down menu.
Do not manipulate this cell
Offeror input via dropdown menu for cells in column "B" or direct input in other cells
If offeror controlled cells within the yellow highlighted areas are changed, the offeror must ensure the summation formula includes the newly created rows.
Note: Numbers added to demonstrate the functionality of the spreadsheet; all values and labor categories should be replaced in accordance with the offeror's information and in accordance with the instructions in Provision L-317.
The rates populating the Yellow highlighted B Column cells are pulled from the Green Chart titled "RATES". The rates input into the RATES table must be accurate. The contractor also has to ensure the yellow cells are calling the correct rate corresponding with the pulldown rate selected by the contractor.
The contractor only needs to use both FY periods within each contract period if rates change in the middle of the contract period, otherwise leave the "FY 2" cost template blank.
"Other Indirect Rate" shall be updated by the offeror, if needed.

Year IV

Solicitation Number:
Prime Offeror:
Subcontractors:
Indirect Rate ElementsRATES
Overhead - Contractor Site A (KTR FY 4)0.00%
Overhead-Contractor Site A (KTR FY 5)0.00%
Overhead - Government Site B (KTR FY 1)0.00%
Overhead - Government Site B (KTR FY 2)0.00%
Fringe Benefits0.00%
G&A (KTR FY 4)0.00%
G&A (KTR FY 5)0.00%
Material and Handling0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
COM0.00%
Fee On Sub0.00%
Fee on Prime0.00%
Contractor's Fiscal Year 4Contractor's Fiscal Year 5
Cost ElementsRFP Labor CategoryAdditional Code/TitleRT RateOT RateRT HoursOT HoursRT AmountOT AmountCost ElementsRFP Labor CategoryAdditional Code/TitleRT RateOT RateRT HoursOT HoursRT AmountOT Amount
Prime Contractor Labor CostPrime Contractor Labor Cost
Prime Contractor Direct Labor - Contractor SitePrime Contractor Direct Labor - Contractor Site
Named Personnel / Bid CodePMNA$ 1.00$ 1.0011$ 1.00$ 1.00
Unnamed PersonnelLaborer5233$ 1.00$ 1.001.01.0$ 1.00$ 1.00
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
Total Contractor Site
$ 2.00$ 2.00
Prime Contractor Direct Labor - Government Site
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Total Government Site$ - 0$ - 0Total Government Site$ - 0$ - 0
Total Direct Labor Cost2.02.0$ 2.00$ 2.00Total Direct Labor Cost0.00.0$ - 0$ - 0
Prime Contractor Indirect Labor CostPrime Contractor Indirect Labor Cost
Overhead - Contractor Site A (KTR FY 4)0.00%$ - 0$ - 0Overhead-Contractor Site A (KTR FY 5)0.00%$ - 0$ - 0
Overhead - Government Site B (KTR FY 4)ERROR:#N/AERROR:#N/AERROR:#N/AOverhead - Government Site B (KTR FY 5)ERROR:#N/AERROR:#N/AERROR:#N/A
Fringe Benefits0.00%$ - 0$ - 0Fringe Benefits0.00%$ - 0$ - 0
Material and Handling0.00%ERROR:#N/AERROR:#N/AG&A (KTR FY 5)0.00%ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Indirect Labor CostERROR:#N/ATotal Indirect Labor CostERROR:#N/A

Total Prime Contractor Labor Cost ERROR:#N/A Total Prime Contractor Labor Cost ERROR:#N/A

Subcontractor Labor CostSubcontractor Labor Cost
Subcontractors - Contractor SiteSubcontractors - Contractor Site
Cost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT AmountCost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT Amount
None$ - 0$ - 0None$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Subcontractors - Government Site List the Subcontractor & Name of PersonSubcontractors - Government Site List the Subcontractor & Name of Person
$ - 0$ - 0$ - 0$ - 0
ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0

Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00 Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00

Prime contractor pass through (not including fee)Prime contractor pass through (not including fee)
Material and Handling0.00%$ - 0$ - 0Material and Handling0.00%$ - 0$ - 0
G&A (KTR FY 4)0.00%$ - 0$ - 0G&A (KTR FY 5)0.00%$ - 0$ - 0
ERROR:#N/AERROR:#N/A
Total pass through (not including fee)$ - 0Total pass through (not including fee)$ - 0
Total Subcontractor Cost including pass through$ 3,900.00Total Subcontractor Cost including pass through$ 3,900.00

Total Labor Cost (Prime and Subcontractor Labor) 52 22 ERROR:#N/A Total Labor Cost (Prime and Subcontractor Labor) 50 20 ERROR:#N/A

Fixed FeeFixed Fee
Fee On Sub0.00%$ - 0Fee On Sub0.00%$ - 0
Fee on Prime0.00%ERROR:#N/AFee on Prime0.00%ERROR:#N/A
Total Fee (for Prime and Subcontractor Labor)ERROR:#N/ATotal Fee (for Prime and Subcontractor Labor)ERROR:#N/A

Total Labor Cost Plus Fixed Fee (CPFF) ERROR:#N/A Total Labor Cost Plus Fixed Fee (CPFF) ERROR:#N/A

Material (BASE Amount)$ 100,000.00Material (BASE Amount)$ 100,000.00
Material and Handling0.00%$ - 0Material and Handling0.00%$ - 0
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Material$ 100,000.00Total Material$ 100,000.00
ODC/Travel/Shipping (BASE Amount)$ 2,500.00ODC/Travel/Shipping (BASE Amount)$ 2,500.00
G&A (KTR FY 4)0.00%$ - 0G&A (KTR FY 5)0.00%$ - 0
ERROR:#N/AERROR:#N/A
Total ODC/Travel$ 2,500.00Total ODC/Travel$ 2,500.00

Total ODCs $ 102,500.00 Total ODCs $ 102,500.00

COM 0.00% 15 COM 0.00% 15

Total CPFF (Labor and ODCs)ERROR:#N/ATotal CPFF (Labor and ODCs)ERROR:#N/A
Grand Total
Input rates for the applicable period
Place formula in this cell. Rate or factor to be utilized must come from the rate corresponding with the rate category drop down menu.
Do not manipulate this cell
Offeror input via dropdown menu for cells in column "B" or direct input in other cells
If offeror controlled cells within the yellow highlighted areas are changed, the offeror must ensure the summation formula includes the newly created rows.
Note: Numbers added to demonstrate the functionality of the spreadsheet; all values and labor categories should be replaced in accordance with the offeror's information and in accordance with the instructions in Provision L-317.
The rates populating the Yellow highlighted B Column cells are pulled from the Green Chart titled "RATES". The rates input into the RATES table must be accurate. The contractor also has to ensure the yellow cells are calling the correct rate corresponding with the pulldown rate selected by the contractor.
The contractor only needs to use both FY periods within each contract period if rates change in the middle of the contract period, otherwise leave the "FY 2" cost template blank.
"Other Indirect Rate" shall be updated by the offeror, if needed.

Year V

Solicitation Number:
Prime Offeror:
Subcontractors:
Indirect Rate ElementsRATES
Overhead - Contractor Site A (KTR FY 5)0.00%
Overhead-Contractor Site A (KTR FY 6)0.00%
Overhead - Government Site B (KTR FY 1)0.00%
Overhead - Government Site B (KTR FY 2)0.00%
Fringe Benefits0.00%
G&A (KTR FY 5)0.00%
G&A (KTR FY 6)0.00%
Material and Handling0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
COM0.00%
Fee On Sub0.00%
Fee on Prime0.00%
Contractor's Fiscal Year 5Contractor's Fiscal Year 6
Cost ElementsRFP Labor CategoryAdditional Code/TitleRT RateOT RateRT HoursOT HoursRT AmountOT AmountCost ElementsRFP Labor CategoryAdditional Code/TitleRT RateOT RateRT HoursOT HoursRT AmountOT Amount
Prime Contractor Labor CostPrime Contractor Labor Cost
Prime Contractor Direct Labor - Contractor SitePrime Contractor Direct Labor - Contractor Site
Named Personnel / Bid CodePMNA$ 1.00$ 1.0011$ 1.00$ 1.00
Unnamed PersonnelLaborer5233$ 1.00$ 1.001.01.0$ 1.00$ 1.00
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
Total Contractor Site
$ 2.00$ 2.00
Prime Contractor Direct Labor - Government Site
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Total Government Site$ - 0$ - 0Total Government Site$ - 0$ - 0
Total Direct Labor Cost2.02.0$ 2.00$ 2.00Total Direct Labor Cost0.00.0$ - 0$ - 0
Prime Contractor Indirect Labor CostPrime Contractor Indirect Labor Cost
Overhead - Contractor Site A (KTR FY 5)0.00%$ - 0$ - 0Overhead-Contractor Site A (KTR FY 6)0.00%$ - 0$ - 0
Overhead - Government Site B (KTR FY 5)ERROR:#N/AERROR:#N/AERROR:#N/AOverhead - Government Site B (KTR FY 6)ERROR:#N/AERROR:#N/AERROR:#N/A
Fringe Benefits0.00%$ - 0$ - 0Fringe Benefits0.00%$ - 0$ - 0
Material and Handling0.00%ERROR:#N/AERROR:#N/AG&A (KTR FY 6)0.00%ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Indirect Labor CostERROR:#N/ATotal Indirect Labor CostERROR:#N/A

Total Prime Contractor Labor Cost ERROR:#N/A Total Prime Contractor Labor Cost ERROR:#N/A

Subcontractor Labor CostSubcontractor Labor Cost
Subcontractors - Contractor SiteSubcontractors - Contractor Site
Cost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT AmountCost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT Amount
None$ - 0$ - 0None$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Subcontractors - Government Site List the Subcontractor & Name of PersonSubcontractors - Government Site List the Subcontractor & Name of Person
$ - 0$ - 0$ - 0$ - 0
ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0

Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00 Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00

Prime contractor pass through (not including fee)Prime contractor pass through (not including fee)
Material and Handling0.00%$ - 0$ - 0Material and Handling0.00%$ - 0$ - 0
G&A (KTR FY 5)0.00%$ - 0$ - 0G&A (KTR FY 6)0.00%$ - 0$ - 0
ERROR:#N/AERROR:#N/A
Total pass through (not including fee)$ - 0Total pass through (not including fee)$ - 0
Total Subcontractor Cost including pass through$ 3,900.00Total Subcontractor Cost including pass through$ 3,900.00

Total Labor Cost (Prime and Subcontractor Labor) 52 22 ERROR:#N/A Total Labor Cost (Prime and Subcontractor Labor) 50 20 ERROR:#N/A

Fixed FeeFixed Fee
Fee On Sub0.00%$ - 0Fee On Sub0.00%$ - 0
Fee on Prime0.00%ERROR:#N/AFee on Prime0.00%ERROR:#N/A
Total Fee (for Prime and Subcontractor Labor)ERROR:#N/ATotal Fee (for Prime and Subcontractor Labor)ERROR:#N/A

Total Labor Cost Plus Fixed Fee (CPFF) ERROR:#N/A Total Labor Cost Plus Fixed Fee (CPFF) ERROR:#N/A

Material (BASE Amount)$ 100,000.00Material (BASE Amount)$ 100,000.00
Material and Handling0.00%$ - 0Material and Handling0.00%$ - 0
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Material$ 100,000.00Total Material$ 100,000.00
ODC/Travel/Shipping (BASE Amount)$ 2,500.00ODC/Travel/Shipping (BASE Amount)$ 2,500.00
Overhead - Contractor Site A (KTR FY 5)0.00%$ - 0G&A (KTR FY 6)0.00%$ - 0
ERROR:#N/AERROR:#N/A
Total ODC/Travel$ 2,500.00Total ODC/Travel$ 2,500.00

Total ODCs $ 102,500.00 Total ODCs $ 102,500.00

COM 0.00% 15 COM 0.00% 15

Total CPFF (Labor and ODCs)ERROR:#N/ATotal CPFF (Labor and ODCs)ERROR:#N/A
Grand Total
Input rates for the applicable period
Place formula in this cell. Rate or factor to be utilized must come from the rate corresponding with the rate category drop down menu.
Do not manipulate this cell
Offeror input via dropdown menu for cells in column "B" or direct input in other cells
If offeror controlled cells within the yellow highlighted areas are changed, the offeror must ensure the summation formula includes the newly created rows.
Note: Numbers added to demonstrate the functionality of the spreadsheet; all values and labor categories should be replaced in accordance with the offeror's information and in accordance with the instructions in Provision L-317.
The rates populating the Yellow highlighted B Column cells are pulled from the Green Chart titled "RATES". The rates input into the RATES table must be accurate. The contractor also has to ensure the yellow cells are calling the correct rate corresponding with the pulldown rate selected by the contractor.
The contractor only needs to use both FY periods within each contract period if rates change in the middle of the contract period, otherwise leave the "FY 2" cost template blank.
"Other Indirect Rate" shall be updated by the offeror, if needed.

Year VI

Solicitation Number:
Prime Offeror:
Subcontractors:
Indirect Rate ElementsRATES
Overhead - Contractor Site A (KTR FY 6)0.00%
Overhead-Contractor Site A (KTR FY 7)0.00%
Overhead - Government Site B (KTR FY 1)0.00%
Overhead - Government Site B (KTR FY 2)0.00%
Fringe Benefits0.00%
G&A (KTR FY 6)0.00%
G&A (KTR FY 7)0.00%
Material and Handling0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
Other Indirect Rate Specified by Offeror0.00%
COM0.00%
Fee On Sub0.00%
Fee on Prime0.00%
Contractor's Fiscal Year 6Contractor's Fiscal Year 7
Cost ElementsRFP Labor CategoryAdditional Code/TitleRT RateOT RateRT HoursOT HoursRT AmountOT AmountCost ElementsRFP Labor CategoryAdditional Code/TitleRT RateOT RateRT HoursOT HoursRT AmountOT Amount
Prime Contractor Labor CostPrime Contractor Labor Cost
Prime Contractor Direct Labor - Contractor SitePrime Contractor Direct Labor - Contractor Site
Named Personnel / Bid CodePMNA$ 1.00$ 1.0011$ 1.00$ 1.00
Unnamed PersonnelLaborer5233$ 1.00$ 1.001.01.0$ 1.00$ 1.00
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0
Total Contractor Site
$ 2.00$ 2.00
Prime Contractor Direct Labor - Government Site
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Total Government Site$ - 0$ - 0Total Government Site$ - 0$ - 0
Total Direct Labor Cost2.02.0$ 2.00$ 2.00Total Direct Labor Cost0.00.0$ - 0$ - 0
Prime Contractor Indirect Labor CostPrime Contractor Indirect Labor Cost
Overhead - Contractor Site A (KTR FY 5)ERROR:#N/AERROR:#N/AERROR:#N/AOverhead-Contractor Site A (KTR FY 6)ERROR:#N/AERROR:#N/AERROR:#N/A
Overhead - Government Site B (KTR FY 5)ERROR:#N/AERROR:#N/AERROR:#N/AOverhead - Government Site B (KTR FY 6)ERROR:#N/AERROR:#N/AERROR:#N/A
Fringe Benefits0.00%$ - 0$ - 0Fringe Benefits0.00%$ - 0$ - 0
Material and Handling0.00%ERROR:#N/AERROR:#N/AG&A (KTR FY 6)0.00%ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Indirect Labor CostERROR:#N/ATotal Indirect Labor CostERROR:#N/A

Total Prime Contractor Labor Cost ERROR:#N/A Total Prime Contractor Labor Cost ERROR:#N/A

Subcontractor Labor CostSubcontractor Labor Cost
Subcontractors - Contractor SiteSubcontractors - Contractor Site
Cost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT AmountCost ElementsRFP Labor CategoryWD CodeST RateOT RateST HoursOT HoursST AmountOT Amount
None$ - 0$ - 0None$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Subcontractors - Government Site List the Subcontractor & Name of PersonSubcontractors - Government Site List the Subcontractor & Name of Person
$ - 0$ - 0$ - 0$ - 0
ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00ACE/Joe SmithPMNA$ 50.00$ 70.0050.020.0$ 2,500.00$ 1,400.00
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0

Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00 Total Subcontractor proposed cost and fee 50 20 $ 2,500.00 $ 1,400.00

Prime contractor pass through (not including fee)Prime contractor pass through (not including fee)
Material and Handling0.00%$ - 0$ - 0Material and Handling0.00%$ - 0$ - 0
G&A (KTR FY 5)ERROR:#N/AERROR:#N/AERROR:#N/AG&A (KTR FY 6)0.00%$ - 0$ - 0
ERROR:#N/AERROR:#N/A
Total pass through (not including fee)ERROR:#N/ATotal pass through (not including fee)$ - 0
Total Subcontractor Cost including pass throughERROR:#N/ATotal Subcontractor Cost including pass through$ 3,900.00

Total Labor Cost (Prime and Subcontractor Labor) 52 22 ERROR:#N/A Total Labor Cost (Prime and Subcontractor Labor) 50 20 ERROR:#N/A

Fixed FeeFixed Fee
Fee On Sub0.00%ERROR:#N/AFee On Sub0.00%$ - 0
Fee on Prime0.00%ERROR:#N/AFee on Prime0.00%ERROR:#N/A
Total Fee (for Prime and Subcontractor Labor)ERROR:#N/ATotal Fee (for Prime and Subcontractor Labor)ERROR:#N/A

Total Labor Cost Plus Fixed Fee (CPFF) ERROR:#N/A Total Labor Cost Plus Fixed Fee (CPFF) ERROR:#N/A

Material (BASE Amount)$ 100,000.00Material (BASE Amount)$ 100,000.00
Material and Handling0.00%$ - 0Material and Handling0.00%$ - 0
ERROR:#N/AERROR:#N/A
ERROR:#N/AERROR:#N/A
Total Material$ 100,000.00Total Material$ 100,000.00
ODC/Travel/Shipping (BASE Amount)$ 2,500.00ODC/Travel/Shipping (BASE Amount)$ 2,500.00
Overhead - Contractor Site A (KTR FY 5)ERROR:#N/AERROR:#N/AG&A (KTR FY 6)0.00%$ - 0
ERROR:#N/AERROR:#N/A
Total ODC/TravelERROR:#N/ATotal ODC/Travel$ 2,500.00

Total ODCs ERROR:#N/A Total ODCs $ 102,500.00

COM 0.00% 15 COM 0.00% 15

Total CPFF (Labor and ODCs)ERROR:#N/ATotal CPFF (Labor and ODCs)ERROR:#N/A
Grand Total
Input rates for the applicable period
Place formula in this cell. Rate or factor to be utilized must come from the rate corresponding with the rate category drop down menu.
Do not manipulate this cell
Offeror input via dropdown menu for cells in column "B" or direct input in other cells
If offeror controlled cells within the yellow highlighted areas are changed, the offeror must ensure the summation formula includes the newly created rows.
Note: Numbers added to demonstrate the functionality of the spreadsheet; all values and labor categories should be replaced in accordance with the offeror's information and in accordance with the instructions in Provision L-317.