14R5007_Amend_06.pdf

PDF 111 KB Posted

Attached to
Slewing Arm Davits
Solicitation number
N65540-14-R-5007
Issued by

About this file

Amendment 06

View the file

Other files

File Type Posted
14R5007_Amend_05.pdf PDF
14R5007_Amend_04.pdf PDF
N65540-14-R-5007_Amendment_0003.pdf PDF
14R5007_Amend_02.pdf PDF
14R5007_Amend_01.pdf PDF
N65540-14-R-5007.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

To answ er questions submitted. See page 2 for details.

1. CONTRACT ID CODE PAGE OF PAGES

S 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-May-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N65540-14-R-5007

X 9B. DATED (SEE ITEM 11)

25-Mar-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-May-2014

CODE

NAVAL SURFACE WARFARE CENTER CARDEROCK

CODE 4232, SEAMUS SCANLAN

215-897-1138, SEAMUS.SCANLAN@NAVY.MIL

5001 SOUTH BROAD STREET

PHILADELPHIA PA 19112-1403

N65540 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N65540-14-R-5007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES REV

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0021

The pricing detail quantity has decreased by 200.00 from 1,180.00 to 980.00.

The following have been modified:

ESTIMATED LEVEL OF EFFORT

Labor Category BASE OY1 OY2 OY3 OY4 TOTAL

Engineering/Program Manager 80 100 100 100 100 480

Design Engineer 200 160 120 120 120 720

Service Director 80 120 120 160 160 532

Field Technical Rep 200 400 400 600 600 2200

Factory Technician 120 240 200 200 0 760

TOTALS 680 1020 940 1180 980 4800

(End of Summary of Changes)

QUESTIONS AND ANSWERS

o What is the required speed for the davit winch?

The solicitation is clear on its face. Please refer to Drawing 583‐6743669 Sheet

1 GN #7 for the rated speed and load for the davit.

o What is the max time allowed for launching boat 1 and boat 2?

The solicitation is clear on its face. Duty cycles for the electric motors for the davit are stated in drawings 583‐6743672 and 583‐6743678.

o What is the sea state requirement for launch & recovery of the boats?

The solicitation is clear on its face. This question is irrelevant to the performance required by the solicitation.

o What is the max number of crew needed for launch & recovery of the boats?

The solicitation is clear on its face. This question is irrelevant to the performance required by the solicitation.

o Are there any future requirements for this davit to also be able to launch & recover an unmanned surface vehicle?

The solicitation is clear on its face. This question is irrelevant to the performance required by the solicitation.

o On page 57 of the Solicitation, CAR‐L11 it state that "Proposals shall be submitted as three separate documents, as follows: Solicitation, Offer and Award Document (SF‐33), Technical Proposal, Cost Proposal". On page 60 of the Solicitation, Section 3 ‐ Price, paragraph (a) states that "This volume shall contain a signed SF33 for the base solicitation; a signed copy of each amendment; the signed Representations and

Certifications Application..." Is the completed SF33 and Amendments to appear in both places or only once? If once, is the SF33 portion a stand‐alone item or is it in the cost proposal. Do the number of copies follow the rules for a stand‐alone item (Solicitation, Offer and Award Document (SF‐33)) with (1) original?

Only once; the SF33 is just the signed and completed solicitation document

N65540‐14‐R‐5007, stand‐alone, plus all amendments. Yes, the number of copies follow the rules for a stand‐alone item (Solicitation, Offer and Award

Document (SF‐33)) with (1) original.

o On page 58 of the Solicitation, second paragraph, it states that the offerors are to submit their cost proposal spread sheets on CD‐ROM (in addition to the hard copy requirements). Is this the electronic versions of all of the bid documents (SF‐33, Technical Proposal, and Cost Proposal) or is it something else?? An excel file summarizing Section B pricing?

Yes, the CD‐ROM is meant to provide a digital version of everything being submitted in response to the solicitation except for the SF33 itself. Signed, hard copies are sufficient for the SF33 and its amendments.

o On page 60 of the Solicitation, Section 3 ‐ Price, paragraph (b) states "all price/cost and price/cost supporting information shall be contained in Section B and the price/cost proposal. No price or pricing information shall be included in any other volume, including cover letters. Offers are responsible for submitting sufficient information to enable the Government to fully evaluate their price/cost proposal.” Below that paragraph, under Ground Rules and Assumptions, paragraph (s), it states that "As this is a competitive acquisition with adequate competition anticipated, any price/cost documentation requested shall not be certified cost or pricing data in accordance with

FAR 15.406‐2." However, it does state that if there is not adequate competition the

Government can request additional price/cost information. Therefore, it is our understanding that no Certificate of Current Cost or Pricing Data is required with the initial bid package. However, per Ground Rules and Assumption paragraph (b) the contractor shall provide sufficient information to support its price/cost as shown on schedule B and explain the ground rules and assumptions made. Does the fact that this is a competitive bid preclude the need to respond to Ground Rules and Assumption paragraphs (a) and (b) at the time of the initial bid? Do those paragraphs only come into play if there is insufficient competition?

No Certificate of Current Cost or Pricing Data is required with the initial bid package. It may be requested in the event that only one bid is received.

o There seems to be a discrepancy between the CLIN man‐hours for CLINs 0019 and 0021 and the hours tabulated in the Estimated Level of Effort table contained in Section B:

The hours for CLIN 0019 are 940, the hours listed in the table total 832. Perhaps the hours for Service Director should be 120, not 12. And the hours for CLIN 0021 are 1180, the hours listed in the table total 980. Perhaps the hours for Factory Technician should be 200, not 0. This would also require a revised total for the Estimated Level of Effort table from 4692 to 5000.

CLIN 0019’s total should read 940 hours; the table has been changed. CLIN

0021’s total should read 980; the CLIN has been changed. The total number of hours in the Estimated Level of Effort has been changed from 4692 to 4800.

o In the Proposal Preparation Requirements it states “The proposal documents SHALL

NOT be embellished with any cover or binding.” Would you prefer a loose leaf submittal, or would 3‐ring binders or binder clips be preferred?

Binders or binder clips are allowed; the choice is at the discretion of the offeror.