CDRL A013_Work Breakdown Structure.pdf
PDF 140 KB Posted
- Solicitation number
- N65236-16-R-0006
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
| A_CONTRACT_LINE_ITEM_NO: |
| B_EXHIBIT: |
| TDP: |
| TM: |
| OTHER: ENGR |
| DSYSTEMITEM: Aviation and Polar Programs Support |
| E_CONTRACTPR_NO: N65236-16-R-0006 |
| FCONTRACTOR: TBD |
| 1_DATA_ITEM_NO: A013 |
| 2_TITLE_OF_DATA_ITEM: Contract Work Breakdown Structure (CWBS) |
| 3_SUBTITLE: |
| 4_AUTHORITY_Data_Acquisit: |
| 5_CONTRACT_REFERENCE: PWS Para 5.4.1 |
| 6_REQUIRING_OFFICE: SPAWARSYSCEN Atlantic |
| 7_DID_250_REQ: LT |
| 8_APP_CODE: N/A |
| DIST_STATEMENT: N/A |
| 10_FREQUENCY: N/A |
| 11_AS_OF_DATE: N/A |
| 12_DATE_OF_FIRST_SUBMISSI: See BLK 16 |
| 13_DATE_OF_SUBSEQUENT_SUB: See BLK 16 |
| addressee1: COR |
| draft1: |
| reg1: 1 |
| repro1: |
| addressee2: |
| draft2: |
| reg2: |
| repro2: |
| addressee3: |
| draft3: |
| reg3: |
| repro3: |
| addressee4: |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_repro: 0 |
| 16_REMARKS: The contractor shall develop and maintain a contract WBS (CWBS) and CWBS dictionary (CDRL A013) in accordance with DID DI-MGMT-81334B and the tasking assigned to support the program WBS as specified at the TO level. |
BLK 12 and 13: Schedule for submission, subsequent submission, and changes to distribution will be specified at TO level.
BLK 14: COR will perform inspection and acceptance.
Unless otherwise directed by TO, Contractor shall provide CDRL document to government as an editable, electronic transmission.
| 17_PRICE_GROUP: | |
| ESTIMATED_TOTAL_PRICE: NSP | |
| G_PREPARED_BY: | |
| H_DATE: 06/16/2017 | |
| 1_APPROVED_BY: | |
| J_DATE: | |
| Page: | |
| of_pages: | |
| Reset: | |
| reg38t: 1 | |
| 2017-06-16T09:56:12-0400 | |
| WARDER.ROBERT.M.1058769289 |
| 2017-06-16T10:36:38-0400 | |
| KELCH.DAVID.WILLIAM.1068598938 |
File details come from the government source that posted it.