CostSummaryFormat.xls
XLS spreadsheet 51 KB Posted
- Attached to
- N64498-18-R-4005 Sources Sought Federal contract opportunity
- Solicitation number
- N64498-18-R-4005
About this file
This document contains a sources sought notice and draft statement of work from the Naval Surface Warfare Center Philadelphia Division seeking engineering, technical, logistics and installation support services. Interested parties were invited to submit capability statements by 1 December 2017 demonstrating their ability to provide 191,452 man-years of technical support in the base year through three option years, decreasing to 110,440 man-years in the fifth option year, for shipboard systems on Navy and Coast Guard vessels worldwide. The anticipated award is a cost-plus-fixed-fee contract for a one-year base period starting 3 September 2018 with four one-year options. All contractor personnel must have secret-level security clearances. The incumbent is Amee Bay, LLC under contract N00178-08-D-5336-EHP1.
Cost Summary Format
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6449818R40050002.pdf | ||
| N6449818R4005_Amendment1.pdf | ||
| DirectLaborRateSubstantiation.xls | XLS spreadsheet | |
| DD254Rev0.pdf | ||
| CDRL_A003_Other_Direct_Costs_Report_(ODCs).pdf | ||
| CDRL_A002_Travel_Trip_Report.pdf | ||
| CDRL_A001_Contracting_Officer's_Management_Report.pdf | ||
| CDRL_A004_Contractor_Personnel_Roster.pdf | ||
| N64498-18-R-4005_RFP.pdf | ||
| FY18_PS_SOW_REDACTED.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CPIF
| SOLICITATION NO. N00024-0X-R-XXXX - ATTACHMENT 1 | ||||||||||||||||||
| COST SUMMARY FORMAT | ||||||||||||||||||
| Prime Offeror Name: | ||||||||||||||||||
| Subcontractor Name (if applicable): | ||||||||||||||||||
| DCAA Point of Contact Information: | ||||||||||||||||||
| Total for All Years | Base Period | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | |||||||||||||
| Cost Elements | Labor Category | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | ||||||||||||||||||
| Prime Contractor Direct Labor | ||||||||||||||||||
| Employee Name 1 | ||||||||||||||||||
| Employee Name 2 | ||||||||||||||||||
| Etc. | ||||||||||||||||||
| Total Direct Labor Cost | ||||||||||||||||||
| Prime Contractor Indirect Labor Cost | ||||||||||||||||||
| Overhead | ||||||||||||||||||
| Fringe Benefits | ||||||||||||||||||
| G&A | ||||||||||||||||||
| Total Indirect Labor Cost | ||||||||||||||||||
| Total Direct and Indirect Labor cost | ||||||||||||||||||
| COM | ||||||||||||||||||
| Total Prime Contractor Labor Cost | ||||||||||||||||||
| Subcontractor Labor Cost | ||||||||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||||||||
| Subcontractor 1 | ||||||||||||||||||
| Subcontractor 2 | ||||||||||||||||||
| Etc. | ||||||||||||||||||
| Total proposed subcontractor labor cost and fee | ||||||||||||||||||
| Prime contractor pass through (not including fee) | ||||||||||||||||||
| Handling | ||||||||||||||||||
| G&A | ||||||||||||||||||
| Other (if any) | ||||||||||||||||||
| Total pass through (not including fee) | ||||||||||||||||||
| Total Subcontractor Cost including pass through | ||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | ||||||||||||||||||
| Fee | ||||||||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | ||||||||||||||||||
| Target Fee | ||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor * | ||||||||||||||||||
| Fee | ||||||||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | ||||||||||||||||||
| Target Fee | ||||||||||||||||||
| Total Labor Cost Plus Base and Incentive Fee (CPIF) | ||||||||||||||||||
| Other Direct Costs | ||||||||||||||||||
| Other Direct Costs (ODCs) | ||||||||||||||||||
| Any adders to ODCs such as G&A (cost only - no fee) | ||||||||||||||||||
| Total ODCs | ||||||||||||||||||
| Total CPIF all CLINs (Labor and ODCs) | ||||||||||||||||||
| Pass Through Analysis - Total for All Years | Amount | Percent | ||||||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||||||||
| Pass Through Amount (not including fee) | ||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor * | ||||||||||||||||||
| Total Pass Through Amount (including fee) | 0.00% | |||||||||||||||||
| Max Pass Through Allowed by SeaPort-e IDIQ Contract | 8.00% | |||||||||||||||||
| * When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through as explained in the Section H Savings Clause of the MACs. In Section B, however, prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B. |
CPFF
| SOLICITATION NO. N00024-0X-R-XXXX - ATTACHMENT 1 | ||||||||||||||||||
| COST SUMMARY FORMAT | ||||||||||||||||||
| Prime Offeror Name: | ||||||||||||||||||
| Subcontractor Name (if applicable): | ||||||||||||||||||
| DCAA Point of Contact Information: | ||||||||||||||||||
| Total for All Years | Base Period | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | |||||||||||||
| Cost Elements | Labor Category | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | ||||||||||||||||||
| Prime Contractor Direct Labor | ||||||||||||||||||
| Employee Name 1 | ||||||||||||||||||
| Employee Name 2 | ||||||||||||||||||
| Etc. | ||||||||||||||||||
| Total Direct Labor Cost | ||||||||||||||||||
| Prime Contractor Indirect Labor Cost | ||||||||||||||||||
| Overhead | ||||||||||||||||||
| Fringe Benefits | ||||||||||||||||||
| G&A | ||||||||||||||||||
| Total Indirect Labor Cost | ||||||||||||||||||
| Total Direct and Indirect Labor cost | ||||||||||||||||||
| COM | ||||||||||||||||||
| Total Prime Contractor Labor Cost | ||||||||||||||||||
| Subcontractor Labor Cost | ||||||||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||||||||
| Subcontractor 1 | ||||||||||||||||||
| Subcontractor 2 | ||||||||||||||||||
| Etc. | ||||||||||||||||||
| Total proposed subcontractor labor cost and fee | ||||||||||||||||||
| Prime contractor pass through (not including fee) | ||||||||||||||||||
| Handling | ||||||||||||||||||
| G&A | ||||||||||||||||||
| Other (if any) | ||||||||||||||||||
| Total pass through (not including fee) | ||||||||||||||||||
| Total Subcontractor Cost including pass through | ||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | ||||||||||||||||||
| Fixed Fee | ||||||||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | ||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor * | ||||||||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | ||||||||||||||||||
| Total Labor Cost Plus Fixed Fee (CPFF) | ||||||||||||||||||
| Other Direct Costs | ||||||||||||||||||
| Other Direct Costs (ODCs) | ||||||||||||||||||
| Any adders to ODCs such as G&A (cost only - no fee) | ||||||||||||||||||
| Total ODCs | ||||||||||||||||||
| Total CPFF all CLINs (Labor and ODCs) | ||||||||||||||||||
| Pass Through Analysis - Total for All Years | Amount | Percent | ||||||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||||||||
| Pass Through Amount (not including fee) | ||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor * | ||||||||||||||||||
| Total Pass Through Amount (including fee) | 0.00% | |||||||||||||||||
| Maximum Pass Through Allowed by SeaPort-e IDIQ Contract | 8.00% | |||||||||||||||||
| Fee Analysis - Total for All Years | Amount | Percent | ||||||||||||||||
| Prime Contractor Labor Cost | ||||||||||||||||||
| Fixed Fee for Labor Performed by Prime Contractor | 0.00% | |||||||||||||||||
| Maximum Fixed Fee Allowed by SeaPort-e IDIQ Contract | ||||||||||||||||||
| * When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through as explained in the Section H Savings Clause of the MACs. In Section B, however, prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B. |
CPAF
| SOLICITATION NO. N00024-0X-R-XXXX - ATTACHMENT 1 | ||||||||||||||||||
| COST SUMMARY FORMAT | ||||||||||||||||||
| Prime Offeror Name: | ||||||||||||||||||
| Subcontractor Name (if applicable): | ||||||||||||||||||
| DCAA Point of Contact Information: | ||||||||||||||||||
| Total for All Years | Base Period | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | |||||||||||||
| Cost Elements | Labor Category | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | ||||||||||||||||||
| Prime Contractor Direct Labor | ||||||||||||||||||
| Employee Name 1 | ||||||||||||||||||
| Employee Name 2 | ||||||||||||||||||
| Etc. | ||||||||||||||||||
| Total Direct Labor Cost | ||||||||||||||||||
| Prime Contractor Indirect Labor Cost | ||||||||||||||||||
| Overhead | ||||||||||||||||||
| Fringe Benefits | ||||||||||||||||||
| G&A | ||||||||||||||||||
| Total Indirect Labor Cost | ||||||||||||||||||
| Total Direct and Indirect Labor cost | ||||||||||||||||||
| COM | ||||||||||||||||||
| Total Prime Contractor Labor Cost | ||||||||||||||||||
| Subcontractor Labor Cost | ||||||||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||||||||
| Subcontractor 1 | ||||||||||||||||||
| Subcontractor 2 | ||||||||||||||||||
| Etc. | ||||||||||||||||||
| Total proposed subcontractor labor cost and fee | ||||||||||||||||||
| Prime contractor pass through (not including fee) | ||||||||||||||||||
| Handling | ||||||||||||||||||
| G&A | ||||||||||||||||||
| Other (if any) | ||||||||||||||||||
| Total pass through (not including fee) | ||||||||||||||||||
| Total Subcontractor Cost including pass through | ||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | ||||||||||||||||||
| Fee | ||||||||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | ||||||||||||||||||
| Base Fee | ||||||||||||||||||
| Award Fee | ||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor * | ||||||||||||||||||
| Base Fee | ||||||||||||||||||
| Award Fee | ||||||||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | ||||||||||||||||||
| Base Fee | ||||||||||||||||||
| Award Fee | ||||||||||||||||||
| Total Labor Cost Plus Base and Award Fee (CPAF) | ||||||||||||||||||
| Other Direct Costs | ||||||||||||||||||
| Other Direct Costs (ODCs) | ||||||||||||||||||
| Any adders to ODCs such as G&A (cost only - no fee) | ||||||||||||||||||
| Total ODCs | ||||||||||||||||||
| Total CPAF all CLINs (Labor and ODCs) | ||||||||||||||||||
| Pass Through Analysis - Total for All Years | Amount | Percent | ||||||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||||||||
| Pass Through Amount (not including fee) | ||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor * | ||||||||||||||||||
| Total Pass Through Amount (including fee) | 0.00% | |||||||||||||||||
| Max Pass Through Allowed by SeaPort-e IDIQ Contract | 8.00% | |||||||||||||||||
| * When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through as explained in the Section H Savings Clause of the MACs. In Section B, however, prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B. |
File details come from the government source that posted it. Updated .