RFP_N64498-18-R-4002_revised_via_Amend_0003.pdf
PDF 694 KB Posted
- Solicitation number
- N64498-18-R-4002
About this file
Updated Solicitation based on Amend 0003
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 04:00 PM local time 06 Nov 2018
X
A X B X C X D
EX
X
G F 95 - 103
104 - 117 X H 118
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-A3 1 122
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N64498 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
NSWCPD, Building 4, RM2900 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 4 5 - 35
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
36 - 68
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
70 - 72 73 - 74
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 75 - 80 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 81 - 82 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
83 - 93
PART II - CONTRACT CLAUSES
NAVAL SURFACE WARFARE CENTER PHILA
CODE 0214, DAVID RHOADS
215-897-7702, DAVID.RHOADS@NAVY.MIL
5001 SOUTH BROAD STREET
PHILADELPHIA PA 19112
215-897-7702
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
22 Sep 2018
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N6449818R4002
Section A - Solicitation/Contract Form
1. CONTRACT TYPE:
The Naval Surface Warfare Center Philadelphia Division (NSWCPD) proposes to award a Single Award Indefinite- Delivery, Indefinite-Quantity (IDIQ), Firm Fixed Price (FFP) type contract resulting from this RFP. The resultant contract will also contain provisions for Cost Reimbursement for ODCs.
2. ORDERING & PERIOD OF PERFORMANCE:
The contract shall have an ordering period from date of contract award through sixty (60) months after date of award and a period of performance from date of contract award through seventy-two (72) months after date of award.
3. SET-ASIDE:
This requirement is being procured as a Total Small Business Set-Aside. The applicable NAICS code is 336611, Ship Building and Repairing, with a Size Standard of 1,250 employees.
4. MINIMUM GUARANTEE QUANTITY:
The minimum quantity of supplies and services to be ordered under this contract shall be $25,000.00 . The maximum quantity of supplies and services to be ordered under this contract shall be the total of all CLINs.
5. SERVICE CONTRACT ACT (SCA) WAGE DETERMINATION:
SCA wage determination is applicable for this requirement.
6. SUPPORT COSTS:
Offerors may propose General and Administrative (G&A) expense on the Not-To-Exceed (NTE) Support Costs estimate (CLIN 0013). However, Offerors shall not "back into" the Support Costs amount. If G&A is not proposed on top of Support Costs as part of the cost proposal, it shall not be requested after submission of the proposal or post-award.
7. POINT OF CONTACT:
The point of contact regarding this solicitation/contract is David Rhoads, who can be reached at 215-897-7702 or via email at david.rhoads@navy.mil.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 3 Lot Year 1 - Restore UMM (Non-MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 1. Ordering Period is from date of award through twelve (12) months thereafter.
FOB: Destination
MAX
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Lot Year 1 - Restore UMM (Non-MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 1. Ordering Period is from date of award through twelve
(12) months thereafter.
PSC CD: J019
UNIT UNIT PRICE MAX AMOUNT
0003 2 Lot Year 1 - Restore UMM (MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 2. Ordering
0004 1 Lot Year 1 - Restore UMM (MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 2. Ordering Period is from date of award through twelve
(12) months thereafter.
UNIT UNIT PRICE MAX AMOUNT
0005 10 Lot Year 1 - Restore UMM Hoist Cylinder
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 3. Ordering
0006 1 Lot Year 1 - Restore UMM Hoist Cylinder (HI)
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 3. Ordering Period is from date of award through twelve
(12) months thereafter.
UNIT UNIT PRICE MAX AMOUNT
0007 3 Lot Year 1 - Restore UMM Paint (Non-MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 4. Ordering
0008 1 Lot Year 1 - Restore UMM Paint (Non-MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 4. Ordering Period is from date of award through twelve
(12) months thereafter.
UNIT UNIT PRICE MAX AMOUNT
0009 2 Lot Year 1 - Restore UMM Paint (MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 5. Ordering
0010 1 Lot Year 1 - Restore UMM Paint (MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 5. Ordering Period is from date of award through twelve
(12) months thereafter.
0011 1 Lot Year 1 - Consumable Parts
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.3 Replacement Material. Ordering Period is from date of award through twelve (12) months thereafter. The total price for CLIN 0011 (Year 1) will be the sum of all the Firm Fixed Price (FFP) ELINs (B001 - B060) in Attachment 1. Individual Task Orders will specify the exact FFP items ordered under CLIN 0011.
0012 1 Lot All Years - Additional Services
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.4 Incidental Repairs. Ordering Period is from date of award through sixty (60) months thereafter. The estimated costs that will be incurred over the entire period of performance is $1,020,201.00. This cost is a Not-To-Exceed (NTE) amount.
* FFP work will be negotiated on individual Task Orders.
0013 1 Lot All Years - Support Costs
COST
Includes travel, shipping, subcontracting facilities and other direct costs. The estimated costs that will be incurred over the entire period of performance is $1,574,184.00. This cost is a Not-To-Exceed (NTE) amount.
ESTIMATED COST
0014 1 Lot All Years – CDRLs
FFP
Technical Data in accordance with Contract Data Requirements List (CDRL) A001
- A012 DD Form 1423. NOT SEPARATELY PRICED (NSP)
UNIT UNIT PRICE MAX AMOUNT
0015 11 Lot Year 2 - Restore UMM (Non-MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 1. Ordering Period is from thirteen (13) months through twenty-four (24) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0016 6 Lot Year 2 - Restore UMM (Non-MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 1. Ordering Period is from thirteen (13) months through twenty-four (24) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0017 4 Lot Year 2 - Restore UMM (MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 2. Ordering Period is from thirteen (13) months through twenty-four (24) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0018 2 Lot Year 2 - Restore UMM (MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 2. Ordering Period is from thirteen (13) months through twenty-four (24) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0019 13 Lot Year 2 - Restore UMM Hoist Cylinder
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 3. Ordering Period is from thirteen (13) months through twenty-four (24) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0020 8 Lot Year 2 - Restore UMM Hoist Cylinder (HI)
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 3. Ordering Period is from thirteen (13) months through twenty-four (24) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0021 11 Lot Year 2 - Restore UMM Paint (Non-MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 4. Ordering Period is from thirteen (13) months through twenty-four (24) months after the
UNIT UNIT PRICE MAX AMOUNT
0022 6 Lot Year 2 - Restore UMM Paint (Non-MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 4. Ordering Period is from thirteen (13) months through twenty-four (24) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0023 4 Lot Year 2 - Restore UMM Paint (MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 5. Ordering Period is from thirteen (13) months through twenty-four (24) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0024 2 Lot Year 2 - Restore UMM Paint (MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 5. Ordering Period is from thirteen (13) months through twenty-four (24) months after the date of contract award.
0025 1 Lot Year 2 - Consumable Parts
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.3 Replacement Material. Ordering Period is from thirteen (13) months through twenty-four (24) months after the date of contract award. The total price for CLIN 0025 (Year 2) will be the sum of all the Firm Fixed Price (FFP) ELINs (C001 - C060) in Attachment 1. Individual Task Orders will specify the exact FFP items ordered under CLIN 0025.
0026 1 Lot Year 3 - Restore UMM (Non-MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 1. Ordering Period is from twenty-five (25) months through thirty-six (36) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0027 6 Lot Year 3 - Restore UMM (Non-MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 1. Ordering Period is from twenty-five (25) months through thirty-six (36) months after the date of contract award.
0028 1 Lot Year 3 - Restore UMM (MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 2. Ordering Period is from twenty-five (25) months through thirty-six (36) months after the date of
UNIT UNIT PRICE MAX AMOUNT
0029 2 Lot Year 3 - Restore UMM (MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 2. Ordering Period is from twenty-five (25) months through thirty-six (36) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0030 5 Lot Year 3 - Restore UMM Hoist Cylinder
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 3. Ordering Period is from twenty-five (25) months through thirty-six (36) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0031 8 Lot Year 3 - Restore UMM Hoist Cylinder (HI)
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 3. Ordering Period is from twenty-five (25) months through thirty-six (36) months after the date of contract award.
0032 1 Lot Year 3 - Restore UMM Paint (Non-MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 4. Ordering Period is from twenty-five (25) months through thirty-six (36) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0033 6 Lot Year 3 - Restore UMM Paint (Non-MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 4. Ordering Period is from twenty-five (25) months
0034 1 Lot Year 3 - Restore UMM Paint (MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 5. Ordering Period is from twenty-five (25) months through thirty-six (36) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0035 2 Lot Year 3 - Restore UMM Paint (MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 5. Ordering Period is from twenty-five (25) months
0036 1 Lot Year 3 - Consumable Parts
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.3 Replacement Material. Ordering Period is from twenty-five (25) months through thirty-six (36) months after the date of contract award. The total price for CLIN 0036 (Year 3) will be the sum of all the Firm Fixed Price (FFP) ELINs (D001 - D060) in Attachment 1. Individual Task Orders will specify the exact FFP items ordered under CLIN 0036.
UNIT UNIT PRICE MAX AMOUNT
0037 6 Lot Year 4 - Restore UMM (Non-MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 1. Ordering Period is from thirty-seven (37) months through forty-eight (48) months after the
UNIT UNIT PRICE MAX AMOUNT
0038 6 Lot Year 4 - Restore UMM (Non-MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 1. Ordering Period is from thirty-seven (37) months through forty-eight (48) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0039 2 Lot Year 4 - Restore UMM (MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 2. Ordering Period is from thirty-seven (37) months through forty-eight (48) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0040 2 Lot Year 4 - Restore UMM (MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 2. Ordering Period is from thirty-seven (37) months
UNIT UNIT PRICE MAX AMOUNT
0041 13 Lot Year 4 - Restore UMM Hoist Cylinder
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 3. Ordering Period is from thirty-seven (37) months through forty-eight (48) months after the
UNIT UNIT PRICE MAX AMOUNT
0042 8 Lot Year 4 - Restore UMM Hoist Cylinder (HI)
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 3. Ordering Period is from thirty-seven (37) months
UNIT UNIT PRICE MAX AMOUNT
0043 6 Lot Year 4 - Restore UMM Paint (Non-MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 4. Ordering Period is from thirty-seven (37) months through forty-eight (48) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0044 6 Lot Year 4 - Restore UMM Paint (Non-MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 4. Ordering Period is from thirty-seven (37) months
UNIT UNIT PRICE MAX AMOUNT
0045 2 Lot Year 4 - Restore UMM Paint (MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 5. Ordering Period is from thirty-seven (37) months through forty-eight (48) months after the
UNIT UNIT PRICE MAX AMOUNT
0046 2 Lot Year 4 - Restore UMM Paint (MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 5. Ordering Period is from thirty-seven (37) months
0047 1 Lot Year 4 - Consumable Parts
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.3 Replacement Material. Ordering Period is from thirty-seven (37) months through forty-eight (48) months after the date of contract award. The total price for CLIN 0047 (Year 4) will be the sum of all the Firm Fixed Price (FFP) ELINs (E001 - E060) in Attachment 1. Individual Task Orders will specify the exact FFP items ordered under CLIN 0047.
UNIT UNIT PRICE MAX AMOUNT
0048 6 Lot Year 5 - Restore UMM (Non-MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 1. Ordering Period is from forty-nine (49) months through sixty (60) months after the date of contract award.
0049 1 Lot Year 5 - Restore UMM (Non-MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 1. Ordering Period is from forty-nine (49) months through sixty (60) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0050 2 Lot Year 5 - Restore UMM (MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 2. Ordering Period is from forty-nine (49) months through sixty (60) months after the date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0051 2 Lot Year 5 - Restore UMM (MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 2. Ordering Period is from forty-nine (49) months through
UNIT UNIT PRICE MAX AMOUNT
0052 8 Lot Year 5 - Restore UMM Hoist Cylinder
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 3. Ordering Period is from forty-nine (49) months through sixty (60) months after the date of
0053 1 Lot Year 5 - Restore UMM Hoist Cylinder (HI)
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 3. Ordering Period is from forty-nine (49) months through
UNIT UNIT PRICE MAX AMOUNT
0054 6 Lot Year 5 - Restore UMM Paint (Non-MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 4. Ordering Period is from forty-nine (49) months through sixty (60) months after the date of contract award.
0055 1 Lot Year 5 - Restore UMM Paint (Non-MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 4. Ordering Period is from forty-nine (49) months through
UNIT UNIT PRICE MAX AMOUNT
0056 2 Lot Year 5 - Restore UMM Paint (MFM)
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 5. Ordering Period is from forty-nine (49) months through sixty (60) months after the date of
UNIT UNIT PRICE MAX AMOUNT
0057 2 Lot Year 5 - Restore UMM Paint (MFM) HI
FFP
Work performed in Hawaii. In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.2 and Restoration Procedure 5. Ordering Period is from forty-nine (49) months through
0058 1 Lot Year 5 - Consumable Parts
FFP
In accordance with Section C - Descriptions and Specifications, Performance Work Statement (PWS), paragraph 3.3 Replacement Material. Ordering Period is from forty-nine (49) months through sixty (60) months after the date of contract award.
The total price for CLIN 0058 (Year 5) will be the sum of all the Firm Fixed Price (FFP) ELINs (F001 - F060) in Attachment 1. Individual Task Orders will specify the exact FFP items ordered under CLIN 0058.
CLAUSES INCORPORATED BY FULL TEXT
HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
HQ B-2-0007 LIMITATION OF COST OR LIMITATION OF FUNDS LANGUAGE
The clause entitled "LIMITATION OF COST" (FAR 52.232-20) or "LIMITATION OF FUNDS" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.
HQ B-2-0020 TRAVEL COSTS - ALTERNATE I (NAVSEA) (APR 2015)
(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its actual travel costs in accordance with FAR 31.205-46. The costs to be reimbursed shall be those costs determined to be allowable, allocable and reasonable by the Procuring Contracting Officer, Administrative Contracting Officer or their duly authorized representative, as advised by DCAA.
(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.
(c) Relocation costs and travel costs incidental to relocation are allowable to the extent provided in FAR 31.205-35;
however, Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incidental to relocation.
(d) The Contractor shall not be reimbursed for the following daily local travel costs:
(i) travel at U.S. Military Installations where Government transportation is available,
(ii) travel performed for personal convenience/errands, including commuting to and from work, and
(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's or employee's convenience.
HQ B-2-0023 CONTRACT SUMMARY FOR PAYMENT OFFICE COST/FIXED PRICE) (FEB 1997)
This contract includes the following mixture of cost reimbursement and fixed price line items:
Item Type
0001 – 0012 FIRM FIXED PRICE
0013 COST
0014 FIRM FIXED PRICE (NOT SEPARATELY PRICED)
0015 – 0058 FIRM FIXED PRICE
(End of Text)
Section C - Descriptions and Specifications
Performance Work Statement (PWS) for Repair, Restoration, and Overhaul of Universal Modular Masts (UMM)
1.0 INTRODUCTION
1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for NSWCPD Code 435, which is responsible for inspection, repair, restoration, and testing services for naval submarine Universal Modular Masts (UMM) systems.
1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied. By agreeing to perform the services described in these specifications, the Contractor acknowledges that he/she is not, and shall not become, an employee of the U.S. Government. The Contractor further agrees that he/she shall not bring any cause of action in any forum claiming that he/she has become an employee of the U.S. Government.
1.0.3 Government / Contractor Relationship
(a) The services to be delivered under this contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.
(b) The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence
(c) The Contractor is responsible for supervision of all Contractor personnel assigned to this task order. The Contractor shall exercise ultimate control over all aspects of Contractor personnel day-to-day work under this task order including the assignment of work, means and manner of Contractor employee performance, and the amount of Contractor supervision provided. The Contractor shall be ultimately responsible for all aspects of performance under this task order including the work of its personnel.
Contractor personnel under this contract shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.
(d) Employee Relationship:
1) The services to be performed under this contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.
2) Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.
(e) Inapplicability of Employee Benefits: This contract does not create an employer-employee relationship.
Accordingly, entitlements and benefits applicable to such relationships do not apply.
(f) Notice. It is the Contractor's, as well as the Government's, responsibility to monitor contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.
1) The Contractor should notify the Contracting Officer in writing within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the estimate in time by which the Government must respond to this notice to minimize cost, delay, or disruption of performance.
2) The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:
(i) Confirm the conduct is in violation and when necessary direct the mode of further performance,
(ii) Countermand any communication regarded as a violation,
(iii) Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or
(iv) In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.
1.1 BACKGROUND
The Sail Systems, I&EW, Radar, UMM & Modeling & Metrology HM&E Branch (Code 435) and the Sail, Hull & Deck Machinery Systems Division (Code 43) of the Naval Surface Warfare Center, Philadelphia Division (NSWCPD), provide services to perform maintenance, repair, restoration, overhaul, and testing of Universal Modular Mast (UMM) systems on Virginia and SSGN class submarines in accordance with Class Maintenance Plans (CMP) and applicable Availability Work Packages (AWP). Code 435 also supports PEO Submarines and Virginia Class new construction efforts by providing repair services on new construction Government Furnished Material (GFM) UMM components as required to support construction schedules.
1.2 SCOPE OF WORK
The contractor shall provide all required labor, materials, and resources to repair, restore, assemble, and test naval submarine UMMs. Work may be in support of emergent or planned requirements for the Naval Submarine Fleet or Ship Construction and the contractor must be prepared to provide urgent support as necessary to meet tight availability schedules. The contractor shall be prepared to provide all necessary resources including the procurement of material, to affect multiple system overhauls for simultaneous maintenance availabilities. The contractor shall support shipment and material movement to and from NSWCPD or various shipyards in which maintenance availabilities are being supported.
2.0 APPLICABLE DOCUMENTS
2.1 Submarine Technical Manual S9422-AT-MMA-010, Universal Modular Mast on SSN 774 Class Submarines
2.2 Submarine Technical Manual S9422-AW-MMI-010, Universal Modular Mast for SSGN Class Submarines
2.3 NSWCPD 435-OM-17-001, Code 435 QA Workbook Guidance
2.4 Submarine Maintenance Standard MS5850-081-174, Inspect universal modular mast
2.5 Submarine Maintenance Standard MS5850-081-183, Inspect universal modular mast
2.6 Submarine Maintenance Standard MS5850-081-184, Perform Universal Modular Mast (UMM) hoist cylinder leakage and creepage test
2.7 Submarine Maintenance Standard MS5850-081-205, Inspect and test Universal Modular Masts (UMM)
2.8 Submarine Maintenance Standard MS5850-081-206, Inspect and repair HDR, IEM, and PMP UMM hydraulic hoist cylinder
2.9 Submarine Maintenance Standard MS5850-081-207, Inspect and repair MFM UMM hydraulic hoist cylinder
2.10 Submarine Maintenance Standard MS5850-081-218, Replace Universal Modular Mast (UMM) paint
2.11 NSWCPD Procedure 961-15-084-003, Universal Modular Mast Overhaul Test and Inspection for SSGN Class Submarines
2.12 Submarine Technical Manual S9086-S4-STM-010/CH-556, Hydraulic Equipment (Power Transmission and Control)
2.13 Submarine Technical Manual SE110-BK-MM0-010, Inspection, Repair, and Painting Fiberglass Mast Assemblies
2.14 Submarine Technical Manual S9422-AT-PRO-10, Preservation, Packaging, Handling, Storage, and Transportation Procedures for Universal Modular Mast
2.15 NAVSEA S9074-AQGIB-010/1688, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
2.16 NAVSEA S9074-AR-GIB-010/278, Requirements for Fabrication Welding and Inspection, and Casting Inspection and Repair for Machinery, Piping, and Pressure Vessels
2.17 NAVSEA SE110-BK-MMO-010, Inspection, Repair, and Painting Fiberglass Mast Assemblies
2.18 NAVSEA T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods
2.19 MIL-STD-2035A, Nondestructive Testing Acceptance Criteria
2.20 NAVSEA SE110-B3-MMA-010, Safety Requirements for Attaching Lifting Clamp, Backup Clamp, Safety Clamps, Safety Stop, Lifting Devices and Slings to Submarine Antenna Masts and Periscopes
2.21 MIL-STD-2197, Brush Electroplating on Marine Machinery
2.22 ANSI/NCSL Z540-1: General Requirements for Calibration Laboratories and Measuring and Test
2.23 NAVSEA 0948-LP-045-7010, Material Control Standard (Non-Nuclear)
2.24 NAVSEA S9074-AQ-GIB-010/248, Requirements for Fabrication Welding and Inspection, and casting Inspection and Repair for Machinery, Piping, and Pressure Vessels
2.25 NAVSEA DWG 8283254, UMM Test Stand Foundation
2.26 NSWCPD SKETCH SK7225, UMM PMV Test Stand Foundation
2.27 NAVSEA DWG 7225788, Hydraulic Adapter Assembly
2.28 NAVSEA DWG 7377988, Hydraulic Adapter Assembly
2.29 ASQ/ANSI/ISO 9001-2015 – Quality Management Systems - Requirements
These documents are available online or by request
The Contractor shall reference and utilize the latest version available when performing tasks within this SOW.
3.0. REQUIREMENTS
3.1 General
3.1.1 The contractor shall provide services, supplies, and other support to repair, restore, overhaul, upgrade, assemble, test, preserve, package, document, mark, and prepare for shipment submarine Universal Modular Mast systems/ assemblies and components
3.1.2 The contractor shall provide: disassembly, inspections, repair, refurbishment, abrasive blast, paint, assembly, testing, machining, and welding services on a variety of submarine UMM equipment and components (e.g., UMM hydraulic cylinders, fairings, guide trunks, etc.).
3.1.3 The contractor shall support submarine maintenance availabilities by adhering to delivery schedules that meet the demands of the availability
3.1.4 The contractor shall provide Quality Assurance and inspections to meet the requirements of Maintenance Standards, drawings, and other technical documentation referenced in the applicable order.
3.1.5 Each order issued under this contract shall specify the Government’s requirements and will contain engineering drawings, technical repair standards, assembly and test instructions, and detailed military/commercial standards in conjunction with the statements of work.
3.1.6 The contractor shall provide services in support of IDIQ orders required to deliver the assembled and tested mast fairings, assemblies, and restored hoist cylinders (including mandatory replacement o-rings, seals, etc). The commonly overhauled UMM systems are:
1) High Data Rate (HDR)
2) Multi-Function Mast (MFM)
3) Photonics Mast (PMP)
4) Integrated ESM Mast (IEM)
5) Mission Configurable Mast (MCM)
6) Multifunction Modular Mast (MMM)
7) Photonics Mast Variant (PMV)
8) UMM Hydraulic Hoist Cylinders
3.1.7 The contractor shall ensure that work follows the established NSWCPD processes including mandatory use of QA workbooks (A003).
3.1.8 The contractor shall deliver the completed units within the scheduled delivery times set forth in the individual task order and adhering to QA requirements in Section 11.1
3.1.9 The contractor shall perform the inspections required by the individual procedures and deliver Condition Found Reports (CFR) (A005) to document and request disposition on deficient material. Additional repair work and/or supplies may be awarded as an outcome of government disposition.
3.2 Restoration Services
CLIN’s 0001 – 0010, 0015 – 0024, 0026 – 0035, 0037 – 0046 and 0048 – 0057: The Contractor shall perform the following requirements:
3.2.1 The contractor shall provide FFP services in support of IDIQ orders required to deliver the restored Universal Modular Mast (UMM) assemblies listed below:
Restore UMM (non-MFM)
Restore UMM (MFM) Restore UMM Hoist Cylinder Restore UMM Paint (non-MFM) Restore UMM Paint (MFM)
3.2.2 Restoration Procedures can be found starting on page 35 of this PWS.
3.3 Replacement Material
CLIN’s 0011, 0025, 0036, 0047, and 0058: The Contractor shall perform the following requirements:
3.3.1 Orders of the above restoration services will coincide with the order of consumable parts sets (machined parts, COTS items, etc.) to support the services performed on this contract.
3.3.2 Supplies are subject to the QA requirements identified in Section 11.1
3.3.3 Consumable parts identified in the table below:
Drawing Number Description 7225817 Tab Washer 7225823 Screws 7225845 Washer 7225857 Bushing 7225858 Bushing 7225860 Bushing 7225869 Pin 7225870 Antifriction Thrust Bearing
7225871 Antifriction Thrust Bearing 7225872 Pin 7225874 Guide Bushing 7225875 Antifriction Thrust Bearing 7225878 Thrust Bearing 7225880 Antifriction Thrust Bearing 7225886 Pin 7225889 Clamp (2ML) 7225890 Pulley Bushings 7225894 Bearing Shoe 7225896 Wire Rope 7225903 Strain Relief 7225925 Bushing 7225926 Screw 7225928 Screw 7225932 Bearing Shoe 7225933 Bearing Shoe 7225940 Pin 7225951 Pin 7225954 Dowel 7225956 Screw 7225957 Lock Washer 7377502 Antifriction Thrust Bearing 7377503 Dowel 7377504 PMP Fairing Bumper, Starboard 7377505 PMP Fairing Bumper, Port 7377508 Screw 7377518 Screw 7377519 Screw 7377533 Threaded Bushing 7377539 Screw 7377554 Screw 7377557 Screw 7377558 Screw 7377562 Cup Springs 7377564 Screw 7377566 Screw 7377614 Screw 7377624 IEM Fairing Bumper 7377645 HDR Fairing Bumper 7377647 MFM Fairing Bumper 7377761 Wire Rope 7377765 Screw 7377809 Screws 7377819 Bumper 7377821 Pulley 7377874 Thrust Bearing 7377946 Wire Rope 8603402 Pin
8603403 M12 Tab Washer 8603404 Cup Springs (Spring Can) KNR10-CNGV-33 Spherical Bearings
3.4 Incidental Repairs
CLIN 0012: The Contractor shall perform the following requirements:
3.4.1 The contractor shall provide FFP services other than those identified in section 3.2 in support of IDIQ orders to disassemble, inspect, repair, refurbish, blast, paint, upgrade, assemble, and test UMM components and subcomponents.
3.5 Facilities/Equipment
3.5.1 The contractor shall possess or have the ability to obtain facilities and equipment (machines, tooling, services, and space) to fabricate/repair parts, components, and assemblies; safely and securely move and maintain materials;
and process and certify material and equipment. The facility shall be within a limit of no more than three hundred
(300) miles from NSWC Philadelphia Division in order for NSWCPD representatives to maintain necessary technical surveillance and guidance associated with this requirement.
3.5.2 The contractor shall maintain or have access to a fully outfitted machine shop capable of manufacturing or prefabricating parts, performing operational testing, performance evaluations, etc. as specified in individual task orders. The requirement for these facilities shall not be construed to mean the contractor is entitled to or the Government is obligated to reimburse the contractor for any direct costs in connection with or occasioned by these facilities. Adequate facilities shall include the following equipment:
1) Material Handling Equipment for UMMs that weigh up to 5,000 lbs when fully assembled
2) Hydrostatic Test Equipment
3) Adaptability to UMM test stand foundations (8283254, SK7225)
4) Fresh water supply to lubricate the UMMs while cycling
5) Welding Equipment (Welding, Solder and Brazing)
6) Hydraulic Power Plant possessing the following capabilities:
a) Adaptability to UMM Hydraulic Adapters (7225788, 7377988)
b) Filter System to ensure oil cleanliness to NAVSEA Technical Manual S9806-S4-STM-010/CH-556 (SAE
AS4059 Class 9)
c) Static Testing of up to 5000 PSI
d) Supply 1500 psi with a flow rate of 23.8 gpm while raising and 7.9 gpm while lowering for standard
UMMs
e) Supply 1500 psi with a flow rate of 32.34 gpm while raising and 11.73 gpm while lowering for PMV or other non-standard UMMs
f) Hydraulic fluid meeting the requirements of MIL-PRF-17672, Navy Symbol 2075TH
7) Paint Booth
a) Meeting the requirements of NAVSEA SE110-BK-MM0-010
b) Able to accommodate all components/subcomponents of UMM, PMV is the largest configuration
8) Electrical Testing Equipment to perform the following:
a) Electrical Testing Equipment to perform the following:
b) Continuity of UMM Position Switches (digital mulitmeter)
c) Operational Testing of UMM Incremental Sensor (+15vdc power supply, digital multimeter)
3.5.3 The contractor shall possess a facility for the testing and vertical assembly of UMMs. The test and vertical assembly area shall be able to interface with the UMM test stand foundation(s) and provide hydraulic power to the foundation-mounted hydraulic adapters.
3.5.4 The test and vertical assembly area shall provide for the operation, disassembly, reassembly and testing of UMMs with the clearance for cycling the system and for the clearance needed for crane lifts of UMM subcomponents. The MFM configuration is the tallest UMM with a maximum raised height of 440” above the test stand foundation.
3.5.5 All UMM and hydraulic hoist cylinder testing shall be performed with components mounted in the vertical position. At no time should components be operated or tested in the horizontal position.
3.5.6 The contractor shall have a horizontal assembly area large enough to accommodate a 16 ft mast fairing (MFM), a 13.5 ft hydraulic cylinder with an 11.5 ft stroke (MFM) and a 16.5 ft guide trunk (PMV).
3.5.7 The contractor should have up to 900 square feet of lay-down space available to place disassembled UMM components as they are being worked on. Additionally, the contractor shall have an area to securely and safely house up to 10 UMMs while not being worked on. At least 300 square feet is required for 10 UMMs.
3.5.8 The contractor must possess the following test equipment/specialized services or be able to demonstrate the ability to obtain such:
1) Services of a laboratory approved by NSWCPD for reporting oil contamination in accordance with
NAVSEA Tech Manual S9086-S4- STM-010/CH-556
2) Mechanical or optical equipment suitable for obtaining straightness readings for the required assemblies
3) Services to make repairs to hydraulic hoist cylinder components if deemed necessary during the execution of the Task Order
a. Brush electroplating capability in accordance with MIL-STD-2197A performed in-house or sub-contracted
b. Finish machining of hydraulic hoist cylinders to meet drawing specifications
3.5.9 Work performed on UMMs in support of submarine availabilities at Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY&IMF) shall take place at a contractor or subcontractor facility on the island of Oahu, Hawaii in order to avoid schedule delays in shipping to the contiguous United States.
3.6 Material
3.6.1 The contractor shall furnish all necessary materials and equipment required for the performance of individual task orders. The contractor shall be responsible for providing all hand tools necessary, at no cost to the Government, in performance of this contract. Hand tools are described as standard tools of the trade such as hammers, drills, wrenches, screwdrivers, pliers, connector crimp tools, lock wire pliers, torque wrenches, etc. and typical tools required to perform tasks set forth in the specific task orders and modifications. It shall be the contractor’s responsibility to maintain all Contractor furnished test equipment properly calibrated (every 12-month period) and in a ready for use condition to the extent necessary to avoid impacting the performance requirements of the task order.
Responsibility for the provision of basic mechanical and electrical tools and test equipment shall rest with the Contractor with no cost to the Government.
3.6.2 It is anticipated that incidental materials will be required for the contractor to procure to support restorations.
These include, but not limited to: fasteners, rigging equipment (swivel hoist rings, etc), lock wire (safety wire), thread lubricants, thread lockers, epoxy repair compounds, paint, hydraulic fluid, gaskets/o-rings, welding material.
3.6.3 As specified in individual task orders, the contractor will be responsible for storage and staging of both Government-furnished and contractor acquired materials and equipment. The contractor must possess an adequate procedure covering the acquisition, tracking, transportation and storage of all material and equipment used during performance.
4.0 DATA REQUIREMENTS
CLIN 0014: The Contractor shall provide the following deliverables in accordance with the contract.
4.1 Contract Status Report (CDRL A001)
4.1.1 This report shall reflect both prime and Subcontractor data if applicable at the same level of detail.
4.1.2 The CDRL shall be delivered electronically, unless otherwise stated, and while Contractor’s format is acceptable, Government’s approval is required from the COR.
4.2 Plan of Action and Milestone (POA&M) or Integrated Production Schedule, (A002)
4.2.1 The CDRL shall be delivered electronically, unless otherwise stated, and while Contractor’s format is acceptable, Government’s approval is required from the COR.
4.3 Quality Assurance (QA) Workbook (A003)
4.3.1 Use of a QA Workbook is mandatory. All data items, including any technical and OQE data, are to be delivered in the QA Workbook.
4.3.2 The CDRL shall be delivered electronically as one file, unless otherwise stated.
4.3.3 Content for the QA Workbook is to be in accordance with Reference 2.3.
4.3.4 Preliminary workbook should be delivered 7 days prior to work commencing for concurrence. Finalized workbook to be delivered 14 days after order is completed.
4.4 Weekly Production Status Report (A004)
4.4.1 The CDRL shall be delivered electronically, unless otherwise stated, and while Contractor’s format is acceptable, Government’s approval is required from the COR.
4.5 Condition Found Report (A005)
4.5.1 The CDRL shall be delivered electronically, unless otherwise stated, and while Contractor’s format is acceptable, Government’s approval is required from the COR.
4.5.2 The condition report shall be used to report deficiencies identified during the inspection process or at any time during the assembly and test effort. Deficiencies include any item that is out-of-spec as identified by the applicable drawing, Maintenance Standard, task order or any other document used during the repair evolution. Deficiencies shall be clearly documented on a sketch that identifies the technical characteristics of each non-conformance.
4.5.3 The condition report shall be generated immediately upon identification of a deficiency and delivered to the government POC no later than 1 day after deficient material is identified to allow for immediate government disposition on the deficient material.