Amendment_3.pdf

PDF 193 KB Posted

Attached to
Rental of gas turbine power generation system
Solicitation number
N64498-17-R-0011
Issued by

About this file

Solicitation Amendment

View the file

Other files

File Type Posted
DOC034.pdf PDF
8040_R-_Approved_2016-10-31.pdf PDF
8041_R-_Approved_2016-10-31.pdf PDF
Amendment_04.pdf PDF
drawings2.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
8044_RA1_2016-12-13.pdf PDF
N64498-17-R-0011.docx DOCX document
N64498-17-R-0011_CDRLs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this Amendment/Modif ication is:

1) To answ er vendor inquiries and extend the proposal due date to 4 January 2017.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Dec-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N64498-17-R-0011

X 9B. DATED (SEE ITEM 11)

08-Dec-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Dec-2016

CODE

NAVAL SURFACE WARFARE CENTER PHILA

CODE 02212, ALLEN CHAI

215-897-7330, ALLEN.CHAI@NAVY.MIL

5001 SOUTH BROAD STREET

PHILADELPHIA PA 19112

N64498 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N64498-17-R-0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES (REVISED)

The proposal due date has been extended to 4 January 2017.

TECHNICAL QUESTIONS & ANSWERS

1. Please advise if there is a maximum delivery order limitation?

Answer – No, there will not be any delivery orders. This award will be for a one time rental for a 6 month time frame.

2. Can a site visit be arranged to inspect interface locations for natural gas, city water, sanitary drain, low voltage 480V, and high Voltage 13.2kV connections?

Answer - Due to time constraints in the RFP time line, a site visit prior to award is not possible.

3. Please provide drawings 8040 referred in sections 2.1.h) and 2.6.b) and drawing 8041 referred in sections 2.1.h) and 2.3.b).

Answer – Drawing 8040 was provided with Amendment 02.

4. Is there any possibility to receive the site GA drawing in AutoCAD format showing the interconnection points for the electrical interconnect point 13.2kV, fuel offtake point, city water, sanitary drain and low voltage 480V?

Answer – GA drawings in AutoCAD format showing the interconnection points can be provided post award.

5. Labor restrictions or requirements for conducting work at a Navy facility.

Are there union restrictions?

Answer – No, the awarded Contractor shall provide all necessary personnel required to operate and maintain the equipment. The Customer shall provide all required overhead crane and rigging services, as required.

Is there training requirement?

Answer – No, the awarded Contractor shall provide all necessary personnel required to operate and maintain the equipment.

6. Environmental Compliance, Permits and Licenses:

Does the Customer or any state/local entity having jurisdiction require Stationary Plant

Operators licenses or permits for temporary power plant operators? If so, please provide specifics.

Answer – The Customer does not require an operating license for the Mobile GTG. An air permit for operation will be required and the Customer has already submitted the required paperwork.

Is there an air permit required?

Answer – Yes, the Department of the Navy has already submitted the required paperwork.

If yes to question b. above has the Navy applied for or has the permit?

Answer - Yes and the Department of the Navy has already submitted the required paperwork.

As part of the Philadelphia air quality standards, will exhaust emissions require continuous monitoring?

Answer - The local air permitting authority considers the Mobile GTG to be a temporary installation and will not require continuous exhaust emissions monitoring. In place of a continuous exhaust emissions monitoring requirement, the vendor is required to provide documentation from a previous installation verifying exhaust emission levels. The natural gas fuel and water injection for the Mobile GTG will need to be recorded to determine a usage rate. If the vendor cannot provide emission data that is approved by the agency then a one-time emission test for NOx and CO will have to be conducted within 60 days after achieving maximum production rate.

Will the NOx require continuous monitoring?

Answer - Continuous monitoring of NOx levels are not required.

Will the sound attenuation levels require continuous monitoring?

Answer - Continuous monitoring of sound attenuation levels are not required.

7. Are there any upper upper limits in generator size in the permit?

Answer - The air permit presented to the local authorizing agency specifies an upper capacity limit of 20MW and 231 MMBtu/hr heat input.

8. Fuel

What is the natural gas pressure, volume and pipe size available at the site?

Answer – An onsite Gas Compressor (Knox Western Model: E-6445 2-Stage Package

KW-14278) has the capability to in increase the GTGS supply from 45 psig (ambient temperature) to a maximum operating pressure of 420 psig (285F) and maximum operating flowrate of 6.549 MMscfd. Control valves on the gas compressor are capable of regulating the GTGS natural gas supply to 375 psig +/- 20 psig (Expected

Operating Pressure based on Customer Knowledge). The Customer natural gas connection is a 3” x 300# SS Flange.

What is the amount of superheat in the gas at the deliverer point when live?

Answer – The original equipment manufacturer of the Customer’s onsite gas compressor states the incoming heat exchanger coolant temperature to the compressor package is 85 o F and the gas temperature will be 110 o F as it leaves the compressor package.

Have the natural gas lines being clean (gas blows or some other form of line cleaning)? If so, are reports available that document the cleaning? If not, will the

Customer guarantee pipeline cleanliness and/or indemnify the Contractor against equipment damage or excessive wear-and-tear due to pipeline dirt/debris?

Answer – Natural gas is supplied to the NSWCPD site from the local utility authority piping system. All NSWCPD installed piping on the discharge side of the local utility authority gas meter will be purged & filtered. Documentation of this portion of the piping system can be provided.

Is liquid fuel available at the site? What type of liquid fuel is expected to be used?

How many days of liquid fuel storage is required, if any, and will this be the responsibility of the Contractor or the Customer?

Answer – Liquid fuel is available, however the air permit presented to the local authorizing agency specifies the rental GTG assembly to operate with NATURAL

GAS ONLY.

Are fuel analyses available?

Answer – Not Applicable

The Contractor will provide one set of revenue-quality metering for fuel and water into the generating set and net electricity out of the generating set. Does the Customer require the Contractor to provide any check metering or open transducers for check-metering?

Answer – Additional metering equipment will not be required.

9. What are the amps at the low voltage line (480V)?

Answer – The Customer supplied 480V Electric Service will 400 Amps.

10. Does the gas turbine generator set will be connected to the local grid? If yes, this will require a grid interconnect protection study and configuring the gas turbine protection relays for

Island mode and Grid mode. Has an interconnection study been performed and if so, can it be made available?

Answer – No, the gas turbine generator set will only be connected to and internal power grid and will not be connected to the local utility power grid.

11. The generating set has upper and lower ambient temperature operating limitations set by the

OEM. Specifics can be provided upon request, but a general upper limit is considered 140F and a general lower limit is considered 42F as delivered. Is this acceptable to the Customer?

Answer – The Contractor shall be prepared to operate the Mobile Auxiliary Power Unit in the typical range of ambient outdoor weather conditions experienced in Philadelphia, PA, USA from January through June.

12. Is site remediation required post project?

Answer - No site remediation is required post project.

13. Is the proposed equipment site a Superfund site?

Answer – The proposed site location is not a Superfund site.

14. Are there below-grade restrictions or environment concerns? If so, please provide specifics?

Answer – No part of the Contractor provided equipment may be below grade. Any oily waste must be contained within Contractor provided system. The Customer will provide for periodic collection and disposal of oily waste.

15. Are there storm water run-off containment requirements at the site? If so, please provide

Answer – The Contractor is not responsible for storm water run-off containment.

16. Are there site access points and areas (other than the improved area already established) that must be maintained open for the permanent facility's EPC contractor? If so, please provide

Answer - Area south of the graded surface depicted in drawing 8044 must remain open and free of equipment or storage.

17. The facility one line diagram for interconnection of the proposed mobile gas turbine based power, we understand that we will tie in at the primary side of the 30 MVA step down transformer.

Answer – High voltage cabling originating from a switchgear within the Customer’s facility will be run to the proposed mobile gas turbine location. The Contractor is required to connect the provided high voltage cabling to their equipment’s high voltage power distribution interface (Switchgear, Junction Box, etc.)

18. The facility overall control architecture for interfaces with the turbine control center, and communication of the load signal, we understand an external signal will be provided.

Answer – No control interface will be provided for the mobile gas turbine operation. The unit will operate as “utility power source” for a down-stream need and start/stop functions will be completed via a manual interface with the Contractor supplied operators.

19. The facility electrical grounding plan and details drawings for the aux equipment connections or please clarify. We will provide all NGR for the offered generator(s) grounding system.

Answer – NSWCPD will install an electrical grounding system to satisfy the safe operation of Contractor provided mobile gas turbine system. The electrical grounding system design will be established post award.

20. An AutoCAD file for the general arrangement plan of the gas turbine generator area

Answer – GA drawings in AutoCAD format showing the interconnection points can be provided post award.

21. An AutoCAD file or in PDF of your underground sanitary or OWS system for the connection of the drains from the gas turbine generator and ancillary equipment, just in case.

Answer – The Customer will provide a connection interface to our facility Sanitary Sewer.

Oily waste is not permitted in this interface and must be contained within Contractor provided system. The Customer will provide for periodic collection and disposal of oily waste.

22. Will it be acceptable to have multiple units configuration to arrive at 20 MW installed capacity or only a single 20 MW gas turbine unit will be acceptable.

Answer - This option would be acceptable if the specifications of the SOW are complied with, including the following:

- Combined mobile air cooled GTGS capable of developing 20.0MW continuous power at 0.8 power factor lagging during ISO conditions (for system)

- Certificate of Performance - Operating Performance (each unit)

- Certificate of Performance - NOx Emissions Performance (each unit)

- Natural Gas Fired Units (each unit)

- Exhaust Duct Requirements (each unit)

- Contractor would be solely responsible for connection of multiple units to NSWCPD supplied utility interfaces

The Government reserves the right, upon review by our permitting department, to determine this alternate approach unacceptable if it is found to violate or contradict a specific parameter of the operating permit.