8044_RA1_2016-12-13.pdf
PDF 2 MB Posted
- Attached to
- Rental of gas turbine power generation system
- Solicitation number
- N64498-17-R-0011
About this file
Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DOC034.pdf | ||
| 8040_R-_Approved_2016-10-31.pdf | ||
| 8041_R-_Approved_2016-10-31.pdf | ||
| Amendment_04.pdf | ||
| Amendment_3.pdf | ||
| drawings2.pdf | ||
| Amendment_2.pdf | ||
| Amendment_1.pdf | ||
| N64498-17-R-0011.docx | DOCX document | |
| N64498-17-R-0011_CDRLs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B
THIS IS A CAD MAINTAINED DRAWING DEVELOPED
IN AUTOCAD R2013 SOFTWARE. CHANGES SHALL BE
INCORPORATED BY THE DESIGN AUTHORITY
UNDER 12" ±1/8"
12" TO 6'-0" ±1/4"
OVER 6'-0" ±1/2"
DISTRIBUTION STATEMENT D
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE AND U.S. DoD CONTRACTORS ONLY;
CRITICAL TECHNOLOGY, 2/23/2011. OTHER U.S.
REQUESTS SHALL BE REFERRED TO COMMANDER,
NAVAL SEA SYSTEMS COMMAND.
KEY PLAN 5A
BLDG 633 - PHILADELPHIA, PA
BUILDING KEY PLAN
SCALE: NONE
DWG NO.CAGE CODESIZE REV
SCALE : AS NOTED SHEET 1 OF 6
D
CONTRACT No.
OFFICIAL SIGNATURE DATE
PREPARED
CHECKED
QA
PROJ MGR
APPROVED NSWCPD
PROG MGR
DIMENSIONAL TOLERANCES
UNLESS OTHERWISE SPECIFIED
DIMENSIONS IN FEET & INCHES
DECIMAL DIMENSIONS IN INCHES
TOLERANCE ON ANGLES ±.50°
1 PL ±.2, 2 PL ±.06, 3 PL ±.005
INTERPRET DIMENSIONS AND TOLERANCES
PER ASME Y14.5 - 2009
REVISION HISTORY
DESCRIPTIONREVZONE DATE APPROVED
D
C
B
A
D
C
B
A
12345678
12345678
A
A C A D F
IL
E N
A M E A C A D E
H P 1/
B U
IL
D
IN
G
H
IP
S T
S D
R A W
IN
G S .D W G
REDUCED SIZE PRINT
DESIGN MGR
REVISION STATUS
REV SH DESCRIPTION
A1 1 TITLE SHEET, BUILDING KEY PLAN, REFERENCES, NOTES
A1 2 NOTES CONTINUED
A1 3 ISOMETRIC VIEW
A1 4 GTG EQUIPMENT ARRANGEMENT
A1 5 GTG FENCING ARRANGEMENT
A1 6 GTG EQUIPMENT ELEVATION VIEWS
ELECTRIC DRIVE TEST FACILITY (EDTF)
NSWCPD BUILDING 77H, PHILADELPHIA, PA
GTG EQUIPMENT
ARRANGEMENT & DETAILS
8044 A1M.Mimnagh 10/21/16
M.Stauffer 10/21/16
89256
D
E
3230282624222018161412108642
SEE SH 4 FOR EQUIPMENT ARR
SEE SH 5 FOR FENCING ARR
SEE SH 6 FOR ELEVATION VIEWS
343230282624222018161412108642
NAVAL SURFACE WARFARE CENTER
PHILADELPHIA DIVISION
PHILADELPHIA, PA 19112-5083
REFERENCES
No. TITLE DRAWING No.
1 GTG VENDOR PLOT PLAN
NORTH
LEGEND
EXISTING/REFERENCE
SCOPE OF DRAWING
LIST OF ABBREVIATIONS:
ASD ALLOWABLE STRENGTH DESIGN
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AWS AMERICAN WELDING SOCIETY
BLDG BUILDING
BMP BEST MANAGEMENT PRACTICES
CL CENTERLINE
DET DETAIL
GTG GAS TURBINE GENERATOR
LVL LEVEL
REF REFERENCE
REV REVISION
TOS TOP OF STEEL
VL VERTICAL LADDER
NOTES:
1. DEVIATIONS FROM THIS DRAWING ARE NOT PERMITTED WITHOUT APPROVAL
FROM THE NSWCPD PROGRAM OFFICE (CODE 211).
2. ELEVATIONS GIVEN ON THIS DRAWING ARE REFERENCED FROM THE TOP OF
FINISHED CONCRETE PAD AND ARE TO BE VERIFIED AT THE TIME OF
INSTALLATION. THE HORIZONTAL CONTROL SHALL BE REFERENCED AS
DIRECTED BY NSWCPD PROGRAM OFFICE.
3. DIMENSIONS SHALL BE FIELD VERIFIED PRIOR TO BEGINNING ANY WORK. MINOR
DEVIATIONS MAY BE PERMITTED WITH THE APPROVAL OF NSWCPD CODE 211.
4. THE CONTRACTOR IS RESPONSIBLE FOR CIVIL WORK PRIOR TO EQUIPMENT
INSTALLATION.
5. THIS DRAWING PROVIDES THE REQUIREMENTS TO PROVIDE A FULLY PREPARED
AND COMPACTED SITE PER GTG VENDOR REQUIREMENTS (TYPICALLY 1.5
KG/CM2 FOR MAJOR EQUIPMENT AND 2.0 KG/CM2 FOR GAS TURBINES). SEE
REFERENCE 2 FOR GROUND/COMPACTING REQUIREMENTS.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ALL
PRE-EXISTING ENCUMBRANCES BELOW GRADE, AT GRADE AND OVERHEAD, AS
WELL AS SITE ENTRY PREPARATION FOR ALL EQUIPMENT DELIVERY. FOR THE
MOBILE GAS TURBINE PACKAGE, SEE REFERENCE 2, APPENDIX I. IN ADDITION,
ALL RIGGING SERVICES (OFFLOADING, MOVEMENT AND PLACEMENT) SHALL BE
PROVIDED BY THE CONTRACTOR. SEE REFERENCE 2, APPENDIX C.
7. 8'-0" TALL FENCING AND ACCESS GATES SHALL BE INSTALLED AS SHOWN IN
PLAN 29A. COORDINATE INSTALLATION WITH OTHER SITE PROJECTS.
EARTHWORK:
1. UNSUITABLE SOIL SHALL BE REMOVED FROM SITE AND BACKFILLED AS
NECESSARY WITH SUITABLE MATERIAL.
2. EXCAVATE AND LEVEL THE EXISTING SUBGRADE TO THE REQUIRED GRADE
AND SLOPE BY BALANCING CUTS AND FILLS WITHOUT ADDITIONAL MATERIAL
PRIOR TO INSTALLING GRAVEL SURFACE COURSE.
3. THE EXCAVATIONS FOR SITE SURFACE SHALL BE DOWN FROM ELEVATION
0'-0” (FINISHED CONCRETE SLAB). THE EXCAVATION SHALL BE A TRIM, LEVEL
SURFACE. ALL EXCAVATED SOILS SHALL BE STORED ON-SITE AT A LOCATION
SPECIFIED BY NSWCPD PROGRAM OFFICE (CODE 211).
4. THE CONTRACTOR SHALL PROVIDE ALL MEASURES AND PRECAUTIONS
NECESSARY TO PREVENT DAMAGE AND SETTLEMENT OF EXISTING OR NEW
CONSTRUCTION. ANY DAMAGE TO NEW OR EXISTING CONSTRUCTION CAUSED
BY CONSTRUCTION TECHNIQUES IS THE RESPONSIBILITY OF THE CONTRACTOR.
5. CONTRACTOR SHALL CHECK FOR UNDERGROUND UTILITIES AND VERIFY
UNDERGROUND CONDITIONS PRIOR TO BEGINNING WORK AND NOTIFY THE
NSWCPD PROGRAM OFFICE (CODE 211) OF ANY CONFLICTS.
6. THE SOIL SHALL BE CAPABLE OF SUSTAINING SUITABLE PRESSURE TO
SUPPORT THE EQUIPMENT AND INSPECTION TO PLACING ANY GRAVEL
SURFACE.
7. ON-SITE EXCAVATED SOILS THAT ARE APPROVED FOR REUSE BY THE
NSWCPD PROGRAM OFFICE MAY BE REUSED AS BACKFILL. MATERIALS
UNSUITABLE FOR BACKFILL AND ALL EXCESS MATERIAL SHALL BE REMOVED
FROM THE SITE. EXISTING SUBGRADE SHALL BE LEVELED AND COMPACTED TO
96% MAXIMUM DRY DENSITY IN ACCORDANCE WITH MODIFIED PROCTOR ASTM
DI557.
8. IMMEDIATELY REPORT TO THE NSWCPD PROGRAM OFFICE ANY UNUSUAL
CONDITIONS ENCOUNTERED DURING INSTALLATION.
(NOTES CONTINUED ON SHEET 2)
RESERVATIONS:
1. LIFTING REQUIREMENTS INCLUDING RIGGING SERVICES IN ADDITION TO THOSE
INCLUDED IN REFERENCE 2.
2 GTG VENDOR DETAILED POWER PACKAGE
3 GTG VENDOR POWER PLANT LEVELING ARRANGEMENT
1. INCORPORATED NSWCPD COMMENTS PER
E-MAIL OF 12/12/16
A1
DWG NO.CAGE CODESIZE REV
SCALE : AS NOTED SHEET 2
D
D
C
B
A
D
C
B
A
910111213141516
910111213141516
REDUCED SIZE PRINT
NOTES CONTINUED
8044 A189256
GENERAL CIVIL NOTES:
1. FINISHED GRADING AND GRAVEL SURFACE SHALL MEET THE REQUIREMENTS OF
THE LATEST PENNSYLVANIA DEPARTMENT OF TRANSPORTATION (PENNDOT)
STANDARD SPECIFICATIONS.
2. THE EQUIPMENT SHALL BE PROVIDED AND INSTALLED AT THE SITE BY GTG
VENDOR. THE COMPLETED STABILIZED SITE SHALL SUPPORT THE LOADS AND
ARRANGEMENTS PROVIDED BY GTG VENDOR, INCLUDING EQUIPMENT DELIVERY
AND SETUP.
3. PRIOR TO EQUIPMENT INSTALLATION, A SITE SURVEY SHALL BE PERFORMED
TO DETERMINE EXISTING SURFACE CONDITIONS. RESULTS SHALL BE PROVIDED
TO NSWCPD PROGRAM OFFICE (211).
4. A SOIL STUDY SHALL BE CONDUCTED AFTER UNSUITABLE SOIL IS REMOVED.
THE STUDY SHALL BE USED TO DETERMINE THAT THE SUBGRADE MEETS
BEARING REQUIREMENTS AND SHALL INCLUDE THE FOLLOWING: PROVIDE
RESULTS TO NSWCPD PROGRAM OFFICE (211)
4.1. TEST FOR BEARING CAPACITY OF EXISTING SOIL AFTER UNSUITABLE SOIL
IS REMOVED.
4.2. STANDARD PENETRATION TEST POINTS TO BE ANALYZED AND DEEMED
SUITABLE FOR BEARING MAJOR EQUIPMENT IN THE RESPECTIVE
LOCATIONS.
5. IN ORDER TO SUPPORT THE EQUIPMENT, THE SOIL MUST ACHIEVE A BEARING
PRESSURE OF AT LEAST 4.1 KIPS/FT2. IF THE SOIL BEARING DOES NOT MEET
THE REQUIRED LEVEL, ADDITIONAL MEANS SUCH AS PLACING STEEL PLATES
UNDER SUPPORT LOCATIONS, MUST BE PROVIDED AND APPROVED BY NSWCPD
PROGRAM OFFICE.
6. THE EXISTING TOPOGRAPHY, UTILITIES AND PHYSICAL FEATURES SHOWN
WERE TAKEN FROM AVAILABLE RECORD DRAWINGS PROVIDED BY NSWCPD.
7. FIELD VERIFY ACTUAL SITE CONDITIONS.
8. LOCATE ALL UNDERGROUND STRUCTURES AND VERIFY THE SIZE AND
ELEVATION OF UNDERGROUND UTILITIES TO BE CROSSED, PRIOR TO WORK
UNDER THIS CONTRACT.
9. CONTACT THE NSWCPD PROGRAM OFFICE AND PENNSYLVANIA ONE CALL
(1-800-242-1776) OR AT 8-1-1 TO ALLOW MARKING OF EXISTING BURIED
UTILITIES AT LEAST 72 HOURS (THREE WORKING DAYS) PRIOR TO
EXCAVATION.
10. EXISTING UNDERGROUND UTILITIES IN THE WORK AREA MUST BE POSITIVELY
IDENTIFIED BY A THIRD PARTY, INDEPENDENT PRIVATE UTILITY LOCATING
COMPANY, IN ADDITION TO ANY STATION LOCATING SERVICE SUCH AS
PENNSYLVANIA ONE CALL AND COORDINATED WITH THE PUBLIC WORKS
DIVISION. ANY MARKING MADE DURING THE UTILITY INVESTIGATION MUST BE
MAINTAINED THROUGHOUT THE DURATION OF THE CONTRACT.
11. WHENEVER CONTRACT WORK INVOLVES CHIPPING, SAW CUTTING OR CORE
DRILLING THROUGH CONCRETE, BITUMINOUS ASPHALT OR OTHER IMPERVIOUS
SURFACES, THE THIRD PARTY, INDEPENDENT, PRIVATE LOCATING COMPANY
SHALL LOCATE UTILITY DEPTH BY USE OF GROUND PENETRATING RADAR
(GPR), X-RAY, BORE SCOPE OR ULTRASOUND PRIOR TO THE START OF
DEMOLITION AND CONSTRUCTION. OUTAGES TO ISOLATE UTILITY SYSTEMS
MUST BE USED IN CIRCUMSTANCES WHERE UTILITIES ARE UNABLE TO BE
POSITIVELY IDENTIFIED. THE USE OF HISTORICAL DRAWINGS DOES NOT
ALLEVIATE THE CONTRACTOR FROM MEETING THIS REQUIREMENT.
12. TAKE NECESSARY PRECAUTIONS TO PROTECT EXISTING UTILITIES. AT
CONTRACTOR'S EXPENSE, IMMEDIATELY REPAIR ANY DAMAGE TO UTILITIES.
THE CONTRACTOR SHALL BE REQUIRED TO, AND AGREES TO, COMPLY WITH
THE PROVISIONS OF THE GOVERNMENT, STATE AND UTILITY FOR
UNDERGROUND DAMAGE PREVENTION AND HEREBY AGREES TO HOLD THE
GOVERNMENT HARMLESS AGAINST ANY LOSS, DAMAGES AND CLAIMS OF ANY
NATURE WHATSOEVER ARISING OUT OF FAILURE TO COMPLY WITH SAID
PROVISIONS.
13. MAINTAIN ACCESS TO VALVES AND HYDRANTS FOR OWNER AND EMERGENCY
SERVICES PERSONNEL.
SITE WORK:
1. THE AREA SHOWN IN PLAN VIEW 29A SHALL BE PREPARED WITH A
PERMEABLE STABILIZATION FABRIC ON TOP OF WHICH #4 BALLAST AND
STONE SCREENING SHALL BE APPLIED WITH A VIBRATING ROLLER TO A DEPTH
OF 8". PLACE AND COMPACT THE MATERIAL TO PROVIDE THE FULL
COMPACTED DEPTH.
2. THE 8" AGGREGATE SURFACE SHALL BE COMPACTED TO AT LEAST 96% OF
MAXIMUM DRY DENSITY IN ACCORDANCE WITH MODIFIED PROCTOR ASTM D1557.
3. SIZE AND GRADATION REQUIREMENTS ARE SHOWN IN TABLE C, SECTION 703
OF PENNDOT PUBLICATION 408.
4. PROOF ROLL AREA TO TEST FOR REQUIRED COMPACTNESS AND BEARING
CAPACITY PER GENERAL CIVIL NOTE 5.
EROSION AND SEDIMENT CONTROL NOTES:
1. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT CONTROL BMP'S
MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS
OF ALL EROSION AND SEDIMENT CONTROL BMP'S AFTER EACH RUNOFF EVENT
AND ON A WEEKLY BASIS. ALL PREVENTIVE AND REMEDIAL MAINTENANCE
WORK, INCLUDING CLEANOUT, REPAIR, REPLACEMENT, RE-GRADING, RESEEDING,
RE-MULCHING, AND RE-NETTING MUST BE PERFORMED IMMEDIATELY. IF
EROSION AND SEDIMENT CONTROL BMP'S FAIL TO PERFORM AS EXPECTED,
REPLACEMENT BMP'S OR MODIFICATIONS OF THOSE INSTALLED WILL BE
REQUIRED.
2. TOPSOIL STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE SIDE
SLOPES MUST BE 2:1 OR FLATTER. TOPSOIL STOCKPILE MUST BE IMMEDIATELY
STABILIZED.
3. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE REMOVAL OF ANY EXCESS
MATERIAL AND MAKE SURE SITE(S) RECEIVING THE EXCESS HAS AN
APPROVED EROSION AND SEDIMENT CONTROL PLAN THAT MEETS THE
CONDITIONS OF CHAPTER 202 AND/OR OTHER STATE OR FEDERAL
REGULATIONS.
4. ALL BUILDING MATERIALS AND WASTES MUST BE REMOVED FROM THE SITE
AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S
SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ.,
271.1 AND 287.1 ET SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED
BUILDING MATERIALS SHALL BE BURNED, BURIED, DUMPED OR DISCHARGED AT
THE SITE.
5. ANY SEDIMENT REMOVED FROM BMPS DURING CONSTRUCTION MAY BE
RETURNED TO UPLAND AREA ON-SITE AND INCORPORATED INTO THE SITE
GRADING.
6. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE
POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE
CONTRACTOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES
TO ELIMINATE THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT
POLLUTION.
7. ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE MADE USING SUITABLE
SEDIMENT REMOVAL FACILITY, OVER UNDISTURBED VEGETATED AREAS AS
APPROVED BY NSWCPD PROGRAM OFFICE.
8. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE, THE OPERATOR
SHALL STABILIZE THE DISTURBED AREAS. DURING NON-GERMINATING PERIODS,
MULCH MUST BE APPLIED AT THE SPECIFIED RATES. DISTURBED AREAS WHICH
ARE NOT AT FINISHED GRADE AND WHICH WILL BE RE-DISTURBED WITHIN 1
YEAR MUST BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY
VEGETATIVE STABILIZATION SPECIFICATIONS. DISTURBED AREAS WHICH ARE
AT FINAL GRADE OR WHICH WILL NOT BE RE-DISTURBED WITHIN 1 YEAR MUST
BE STABILIZED IN ACCORDANCE WITH THE PERMANENT VEGETATIVE
STABILIZATION SPECIFICATIONS.
9. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT
STABILIZATION OF ALL DISTURBED AREAS, THE NSWCPD PROGRAM OFFICE
AND/OR CONTRACTOR SHALL CONTACT THE SEDIMENT CONTROL INSPECTOR
FOR A FINAL INSPECTION PRIOR TO THE REMOVAL OF THE BMP'S.
10. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION
AND SEDIMENTATION CONTROLS MUST BE REMOVED. AREA DISTURBED DURING
REMOVAL OF THE CONTROLS MUST BE STABILIZED IMMEDIATELY. PERMANENT
STABILIZATION SHOULD BE DEFINED AS “A MINIMUM UNIFORM 70% PERENNIAL
VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A
DENSITY SUFFICIENT TO RESIST ACCELERATED SURFACE EROSION AND
SUBSURFACE CHARACTERISTICS SUFFICIENT TO RESIST SLIDING AND OTHER
MOVEMENTS”.
11. INSTALL EROSION AND SEDIMENT CONTROLS PER THE CONSTRUCTION DETAILS
AND AT LOCATIONS AS REQUIRED BY PENNSYLVANIA DEPARTMENT OF
ENVIRONMENTAL PROTECTION IN ACCORDANCE WITH CHAPTER 102 - "EROSION
CONTROL REGULATIONS".
GENERAL CIVIL NOTES:
14. PERFORM WORK IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS,
INCLUDING THE LASTEST REVISIONS OF PENNSYLVANIA DEPARTMENT OF
TRANSPORTATION STANDARD SPECIFICATIONS (AS REFERENCED);
PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION; CITY OF
PHILADELPHIA DEPARTMENT OF STREETS STANDARD CONSTRUCTION ITEMS;
CITY OF PHILADELPHIA WATER DEPARTMENT WATER MAIN STANDARD DETAILS
CORROSION CONTROL SPECIFICATIONS, AS APPLICABLE.
15. THE CONTRACTOR IS RESPONSIBLE FOR ALL SITE SURVEYING NECESSARY TO
STAKE PROJECT LIMITATIONS AND PROVIDE FOR POSITIVE DRAINAGE.
16. VERIFY ALL EXISTING UTILITY INVERTS AND CLEARANCES FROM NEW WORK
PRIOR TO START OF ANY WORK.
17. THESE DRAWINGS DO NOT INCLUDE THE NECESSARY COMPONENTS FOR
CONSTRUCTION SAFETY. ALL CONSTRUCTION MUST BE DONE IN ACCORDANCE
WITH THE MOST CURRENT VERSION OF OSHA STANDARDS AND/OR
REGULATIONS.
18. NOTIFY THE CONTRACTING OFFICER OF ANY DEVIATION TO THIS PLAN PRIOR
TO ANY CHANGE BEING MADE. ANY CHANGE IN THIS PLAN WITHOUT THE
WRITTEN AUTHORIZATION FOR SAID CHANGE FROM CONTRACTING OFFICER
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR SUB-CONTRACTOR.
19. STORAGE AND STAGING AREAS SHALL BE COORDINATED WITH THE NSWCPD
PROGRAM OFFICE.
20. ALL STORM DRAIN APPURTENANCES SHALL REMAIN FUNCTIONAL DURING
CONSTRUCTION.
21. FINISHED GRADING/SURFACE SHALL PROVIDE POSITIVE DRAINAGE TOWARDS
STORM DRAINAGE FEATURES. GRADING SHALL NOT RESULT IN LOW SPOTS
THAT HOLD WATER. A MINIMUM SLOPE OF 1% SHALL BE PROVIDED FOR THE
ENTIRE SITE.
22. CIVIL WORK SHALL BE COORDINATED WITH WORK OF GTG VENDOR AS SHOWN
IN REFERENCES 1, 2, & 3.
23. ALL CONTRACTORS UTILIZING THIS PLAN AND THE INFORMATION ARE
CAUTIONED TO COMPLY WITH THE REQUIREMENTS OF PENNSYLVANIA ACT 787
ENTITLED "UNDERGROUND UTILITY LINE PROTECTION.
EROSION AND SEDIMENT CONTROL NOTES:
12. TECHNICAL PROVISION:
12.1. THE REQUIREMENTS CONTAINED HEREIN AND/OR SHOWN ON THE
DRAWINGS ARE MINIMUM STANDARDS. NOTHING CONTAINED WITHIN
THESE PROVISIONS OR ON THE DRAWING IS INTENDED TO PREVENT
THE CONTRACTOR FROM UTILIZING ADDITIONAL MEASURES TO
PREVENT SOIL EROSION AND TO CONTROL SEDIMENTATION.
MODIFICATIONS OF THE REQUIREMENTS HEREIN, OR ON THE DRAWINGS
TO ADJUST TO CHANGING SITE CONDITIONS SHALL BE APPROVED BY
THE COUNTY CONSERVATION DISTRICT, BUT THE ULTIMATE
RESPONSIBILITY FOR COMPLIANCE WITH THE REGULATIONS PERTAINING
TO SOIL EROSION AND SEDIMENTATION CONTROLS BELONGS TO THE
CONTRACTOR PERFORMING THE WORK.
12.2. IF WORK ON THIS PROJECT IS SUSPENDED FOR ANY REASON, THE
CONTRACTOR SHALL MAINTAIN THE BEST MANAGEMENT PRACTICES IN
GOOD CONDITION DURING THE SUSPENSION OF WORK. ADDITIONALLY,
WHEN SEASONAL CONDITIONS PERMIT AND THE SUSPENSION OF WORK
IS EXPECTED TO EXCEED A PERIOD OF TEN (10) DAYS, THE
CONTRACTOR SHALL STABILIZE ALL DISTURBED AREAS LEFT EXPOSED
WHEN THE WORK IS STOPPED, AS STATED IN NOTE 7.
13. CONSTRUCTION OF PAVED AREAS:
13.1. DUST AT THE CONSTRUCTION SITE SHALL BE KEPT WITHIN TOLERABLE
LIMITS.
13.2. A STABILIZED CONSTRUCTION ENTRANCE(S) SHALL BE INSTALLED AT
THE LOCATION(S) SHOWN ON THE PLAN. IT SHALL BE THE FIRST ITEM
TO BE GRADED TO THE FINAL PROPOSED GRADE AND SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE ROCK CONSTRUCTION
ENTRANCE DETAIL.
14. FINE GRADING AND SEEDING:
14.1. THE CONTRACTOR SHALL PLACE TOPSOIL, TO A MINIMUM OF 6 INCHES,
IN THOSE AREAS WHICH HAVE BEEN DISTURBED BY WORK. THE
TOPSOIL SHALL BE RAKED AND TRIMMED TO TRUE LINES AND SHALL
BE FREE FROM UNSIGHTLY VARIATIONS. PRIOR TO PLACING TOPSOIL,
LOOSEN AREAS TO RECEIVE TOPSOIL TO A DEPTH OF 2” AND REMOVE
STONES AND OTHER FOREIGN MATERIAL 2” OR LARGER IN ANY
DIMENSION.
14.2. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE, THE
CONTRACTOR SHALL HAVE ALL REMAINING DISTURBED AREAS
FERTILIZED, SEEDED AND MULCHED IN ACCORDANCE WITH THE
PROVISIONS OF PENNDOT PUBLICATION NO. 408, LATEST VERSION,
SECTIONS 804 AND 805.
SCALE : AS NOTED SHEET 3
D
D
C
B
A
D
C
B
A
REDUCED SIZE PRINT
ISOMETRIC VIEW 21A
GTG EXHAUST STACK SUPPORT STRUCTURE
LOOKING SOUTHWEST
SCALE: NONE
ISOMETRIC VIEW
8044 A189256
1718192021222324
1718192021222324
SCALE : AS NOTED
D
D
C
B
A
D
C
B
A
REDUCED SIZE PRINT
SHEET 4
GTG EQUIPMENT
ARRANGEMENT
8044 A189256
PLAN VIEW 29A
GTG-B EQUIPMENT ARRANGEMENT
SCALE: 1/16"=1'-0"
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
A
G T G P
A D
1 4
50'-0" GTG PAD34'-3
GRAPHIC SCALE 1/16"=1'-0"
0 2' 5' 10' 15' 20' 30' 40' 50' 60'
70'-5
61'-5
11'-5"
18'-0
67'-0
40'-1"
G R O U N D P
R E P S E E N
O T E S
115'-0" GROUND PREP, SEE NOTES
EXISTING FENCE LINE
AIR FILTER TRAILER
AUXILIARY TRAILER
TURBINE\GENERATOR TRAILER
EXHAUST SILENCER TRAILER
25'-4"
BLDG FRONT
C45
A
2526272829303132
2526272829303132
EXCAVATE AND PROVIDE 8" THICK DENSE GRADED SURFACE
PER SITE WORK NOTE 1 OVER PERMEABLE STABILIZATION FABRIC
ON COMPACTED SUBGRADE
EXISTING APRON
40'-0"
PROVISION OF A STABILIZED CONSTRUCTION ENTRANCE
AS PART OF EROSION AND SEDIMENT CONTROL WORK.
SEE PENNDOT STANDARD DRAWING RC-70M.
30'-0"
39'-6"
11'-6"
77'-6"
46'-0"
30'-9"
32'-0"
D
D
C
B
A
D
C
B
A
REDUCED SIZE PRINT
SHEET 5
GTG FENCING
ARRANGEMENT
8044 A189256
PLAN VIEW 37A
GTG-B FENCING ARRANGEMENT
SCALE: 1/16"=1'-0"
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
A
G T G P
A D
50'-0" GTG PAD
GRAPHIC SCALE 1/16"=1'-0"
0 2' 5' 10' 15' 20' 30' 40' 50' 60'
EXISTING FENCE LINE
SEE NOTE 725'-4"
BLDG FRONT
EXISTING APRON
3334353637383940
3334353637383940
36'-8"
19'-6"
12'-0"
GATE
210'-0"
120'-0"
6'-0"
20'-0"
24'-0"
GATE
143'-3"
74'-6"
6'-0" GATE
NEW FENCE
SEE NOTE 7
NEW FENCE
SEE NOTE 7
NEW FENCE
SEE NOTE 7
NEW FENCE
SEE NOTE 7
NEW FENCE
SEE NOTE 7
D
D
C
B
A
D
C
B
A
REDUCED SIZE PRINT
SHEET 6
GTG EQUIPMENT
ELEVATION VIEWS
8044 A189256
ELEVATION VIEW 45A
LOOKING SOUTH
SCALE: 1/8"=1'-0"
ELEVATION VIEW 45C
LOOKING WEST
SCALE: 1/8"=1'-0"
GRAPHIC SCALE 1/8"=1'-0"
0 2' 5' 10' 15' 20' 30'
4142434445464748
4142434445464748
| 8044 SH01 (1) |
| 8044 SH02 (1) |
| 8044 SH03 (1) |
| 8044 SH04 (1) |
| 8044 SH05 (1) |
| 8044 SH06 (1) |
File details come from the government source that posted it. Updated .