DID_FOR_CDRL_A004.pdf
PDF 58 KB Posted
- Attached to
- Environmental Database Services Federal contract opportunity
- Solicitation number
- N64267-14-T-0321
About this file
DID FOR CDRL A004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_-_N64267-14-T-0321.docx | DOCX document | |
| CDRL_A002_Database_Design_Doc.RA30.DID.pdf | ||
| CDRL_A001_Progress_Rep.RA30.DID.pdf | ||
| CDRL_A004_Contractors_Personnel_Roster.RA30.DID.pdf | ||
| WD_San_Diego.pdf | ||
| DID_FOR_CDRL_A003.pdf | ||
| DID_FOR_CDRL_A005.pdf | ||
| DID_FOR_CDRL_A002.pdf | ||
| CDRL_A005_Computer_Software_Product.RA30.DID.pdf | ||
| CDRL_A003_Software_Design_Doc.RA30.DID.pdf | ||
| DID_FOR_CDRL_A001.pdf | ||
| Environmental_Services_Solicitation.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
Title: CONTRACTOR'S PERSONNEL ROSTER
Number: DI-MGMT-81834A Approval Date: 20130118 AMSC Number: N9316 Limitation: N/A DTIC Applicable: No GIDEP Applicable: N/A Office of Primary Responsibility: SH/MS10 Applicable Forms: N/A
Use/relationship:
This roster shall be used to list all contractor personnel assigned to the contract.
This Data Item Description (DID) contains the content and preparation instructions for data product resulting from the work task specified in the contract.
Requirements:
1. Format. The Roster shall be in contractor’s format.
2. Content. The Roster shall contain an alphabetical listing of the names of all contractor personnel assigned to the contract.
2.1 The roster shall identify the following for each employee:
a. Change Status: Add/Change/Remove
b. Start Date
c. End Date
d. First Name
e. Middle Name
f. Last Name
g. Position Title
h. Email Address
i. Work Phone Number
j. Physical Work Location – Base Name
k. Physical Work Location - City
l. Physical Work Location - State
m. Physical Work Location – Building Number
n. Physical Work Location – Room Number
o. Contract Number
p. Contract Name
q. Contracting Supervisor
r. Government Support POC
s. Supporting Code
2.2 The roster shall identify work schedules for full time and part time employees and shall include current CAC and clearance information for each.
3. End of DI-MGMT-81834A.
File details come from the government source that posted it. Updated .