This document is a set of vendor questions and answers related to Solicitation N6339424R0005 for the design, manufacture, and delivery of Short/Medium Range Sub-Orbital Vehicles (SSOV). Key details include:

The incumbent contractor is CORVID Technologies, under contract N00178-19-D-5001 valued at $223,277,038.00. The solicitation is a Total Small Business Set-Aside with a NAICS code of 336414 and a size standard of 1,300 employees. The anticipated performance period is 5 years. The solicitation provides clarification on pricing, labor categories, overtime, and attachments. The proposal due date has been extended to June 14, 2024 in Amendment 1. The SSOVs are required to support various programs including AMDR, Aegis BMD, MTMD, SBT, Fleet Training, RailGun, Hyper Velocity Projectile, and FMS efforts.

View the file

Other files

File Type Posted
N6339424R0005 Amendment 2.pdf PDF
N6339424R0005 Amendment 2 Conformed.pdf PDF
Attachment_JS-1_Price-Cost Template.Rev1.xlsx XLSX spreadsheet
N6339424R0005 Amendment 1.pdf PDF
Attachment_J-4_CPFF_LOE.Rev1.xls XLS spreadsheet
Attachment_JS-5_BLS_eCRAFT_and_SCA.Rev1.xlsx XLSX spreadsheet
N6339424R0005 Amendment 1 Conform.pdf PDF
Attachment_JS-5_BLS_eCRAFT_and_SCA.xlsx XLSX spreadsheet
Attachment_JS-4_Government Property Plan.docx DOCX document
Attachment_J-2_DD254.pdf PDF
Attachment_JS-1_Price-Cost Template.xlsx XLSX spreadsheet
Attachment_JS-2_Staffing_Plan.xlsx XLSX spreadsheet
Attachment_J-3_WD.pdf PDF
Exhibit_A_CDRLs.pdf PDF
Attachment_J-4_CPFF_LOE.xls XLS spreadsheet
N6339424R0005.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6339424R0005 Vendor Questions with Answers

Question 1: Is there an incumbent for this solicitation? Would it also be possible to to get the contract number as well as the contract price?

Answer 1: The incumbent is CORVID Technologies, under contract N00178-19-D-5001, with a total value of $223,277,038.00.

Question 2: It appears only one of each CLIN/sub-CLIN can be delivered in execution per year. How will the Government determine the ceiling to allow for multiple vehicles to be delivered?

Answer 2: The ceiling will be determined by the proposed/negotiated price for each CLIN/sub-CLIN per execution year. If multiple vehicles are required, additional CLIN/sub-CLIN's will be executed.

Question 3: Is it the intent that each sub-CLIN for each vehicle type is a different configuration and pricing should be based on each specific configuration?

Answer 3: Yes, that is the intent.

Question 4: What is the intent of the top level CLIN for each vehicle type? Is it a summary of the sub-

CLINs, an average of the sub-CLINs, or some other estimate?

Answer 4: The top level CLIN identifies the type of vehicle thus dictating the materials required for the associated SLINs.

Question 5: Please confirm Senior Engineer hours for Period 2? The table in Section L says 2,3044,340.

Answer 5: Will be corrected in Amendment 1.

Question 6: There are discrepancies in the labor categories and labor hour breakdowns listed in multiple RFP locations:

- N6339424R0005, L.4.4.1

- Attachment J-4, Required Staffing Plan tab

- Attachment JS-1, Summary Total CPFF tab

- Attachment JS-1, CPFF CLIN tabs.

Would the Government please provide clarification?

Answer 6: Attachment J-4 shows total hours per category, including projected overtime. Section L.4.4.1 and the CPFF CLIN tabs on Attachment JS-1 show that information with the overtime broken out. We can pay overtime, if it’s approved in advance. We do not desire or require overtime. Lastly, the Attachment

JS-1 Summary Total CPFF lists all of the labor categories provided elsewhere. Attachments J-4, JS-1 and

JS-5 will be updated in Amendment 1.

Question 7: The CLINs listed in the Grand Total tab do not tie to the CLINs in the other tabs or the RFP document. Will the Government please provide clarity on which CLINs and/or SLINs should be listed in this tab?

Answer 7: Attachment JS-1 will be updated in Amendment 1.

Question 8: Regarding "Attachment JS-1 Price-Cost Template": In order to provide subcontractor detail in accordance with L.4.4.3, it would be necessary for Offerors to add new rows and/or tabs. Is this acceptable to the Government? If not, please specify how Offerors should provide this information.

Answer 8: In accordance with Section L 4.4.7, proposed cost reimbursement subcontractors are required to submit their proposals using Attachment, JS-1.

Question 9: The RFP states that the intended start date is in October of 2024 (GFY 2025). The escalation table in the RFP starts in FY24. When escalating labor rates from FY24 to FY25, is the S&P escalation

3.68% or 3.08%?

Answer 9: The escalation chart will be updated in Amendment 1.

Question 10: We respectfully request a 15 day extension for submission.

Answer 10: The proposal due date will be extended to 14 June 2024 in Amendment 1.