Attachment_JS-4_Government Property Plan.docx
DOCX document 26 KB Posted
- Attached to
- Short/Medium Range Sub-Orbital Vehicles (SSOV) Federal contract opportunity
- Solicitation number
- N6339424R0005
About this file
This document is the Government Property Management System/Plan/Practices Offeror Response Template, which is Attachment JS-4 to Solicitation No. N6339424R0005 for the design, manufacture, and delivery of Short/Medium Range Sub-Orbital Vehicles (SSOV).
The template requires the offeror to describe their property management plans, systems, and procedures for managing government-furnished and contractor-acquired property associated with the awarded task order. Key details include processes for property acquisition, receipt, records management, physical inventory, subcontractor control, reporting, and property closeout. The offeror must also describe their approach for establishing and maintaining government accounting source data. The overall solicitation is for a Total Small Business Set-Aside contract with a 5-year anticipated performance period, issued by the Department of the Navy Naval Sea Systems Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6339424R0005 Amendment 2.pdf | ||
| N6339424R0005 Amendment 2 Conformed.pdf | ||
| Attachment_JS-5_BLS_eCRAFT_and_SCA.Rev1.xlsx | XLSX spreadsheet | |
| N6339424R0005 Amendment 1.pdf | ||
| Attachment_J-4_CPFF_LOE.Rev1.xls | XLS spreadsheet | |
| Attachment_JS-1_Price-Cost Template.Rev1.xlsx | XLSX spreadsheet | |
| N6339424R0005 Amendment 1 Conform.pdf | ||
| N6339424R0005 Vendor Questions with Answers.pdf | ||
| N6339424R0005.pdf | ||
| Attachment_J-4_CPFF_LOE.xls | XLS spreadsheet | |
| Attachment_JS-5_BLS_eCRAFT_and_SCA.xlsx | XLSX spreadsheet | |
| Exhibit_A_CDRLs.pdf | ||
| Attachment_JS-1_Price-Cost Template.xlsx | XLSX spreadsheet | |
| Attachment_J-2_DD254.pdf | ||
| Attachment_J-3_WD.pdf | ||
| Attachment_JS-2_Staffing_Plan.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. N6339424R0005, Attachment No. JS-4
GOVERNMENT PROPERTY MANAGEMENT SYSTEM/PLAN/PRACTICES OFFEROR RESPONSE TEMPLATE
Contractor Plans and Systems:
A. The Offeror shall describe their property management plans, systems, and procedures and identify whether Government Furnished Property that is associated with the awarded Task Order will be managed at the base SeaPort-NxG IDIQ contract, Task Order, program, site or entity level to enable the below identified outcomes.
A1: Acquisition of Property - That Offeror controls are in place to ensure that Contractor Acquired Property will be acquired consistent with its engineering, production planning, and property control operations.
A2: Receipt of Government Property - That the Offeror will receive any Government property under the Task Order and document the receipt by maintaining property records that enable a complete, current, auditable record of all transactions and that include the following information: (1) The name, part number, and description, National Stock Number (if needed for additional item identification tracking and/or disposition), and other data elements as necessary and required in accordance with the terms and conditions of the Task Order; (2) Quantity received (or fabricated), issued, and balance-on-hand; (3) Unit acquisition cost; (4) Unique-item identifier or equivalent (if available and necessary for individual item tracking); (5) Unit of measure; (6) Accountable Task Order number or equivalent code designation; (7) Location; (8) Disposition; (9) Posting reference and date of transaction; (10) Date placed in service (if required in accordance with the terms and conditions of the Task Order). In addition, that the Offeror will identify property as Government owned in a manner appropriate to the type of property (e.g., stamp, tag, mark, or other identification), and manage any discrepancies incident to shipment.
A2.1: Government Furnished Property: The Offeror shall describe their approach for ensuring that upon the receipt of Government Furnished Property, a written statement will be transmitted to the Task Order Property Administrator and Contracting Officer containing all relevant facts, such as cause or condition and a recommended course(s) of action, if overages, shortages, or damages and/or other discrepancies are discovered upon receipt of Government-furnished property.
A2.2: Contractor Acquired Property: The Offeror shall describe their approach for ensuring that all actions necessary to adjust for overages, shortages, damage and/or other discrepancies discovered upon receipt, in shipment of Contractor acquired property from a vendor or supplier, so as to ensure the proper allocability and allowability of associated costs.
A3: Records of Government Property - The Offeror shall describe their process for creating and maintaining records for all Government property accountable to the Task Order, including Government-furnished and Contractor-acquired property.
A3.1: Formal Property Records: The Offeror shall describe their process of ensuring that property records are complete, current, auditable record of all transactions and shall contain the following data elements: (1) The name, part number and description, National Stock Number (if needed for additional item identification tracking and/or disposition), and other data elements as necessary and required in accordance with the terms and conditions of the Task Order; (2) Quantity received (or fabricated), issued, and balance-on-hand; (3) Unit acquisition cost; (4) Unique-item identifier or equivalent (if available and necessary for individual item tracking); (5) Unit of measure; (6) Accountable Task Order number or equivalent code designation; (7) Location; (8) Disposition; (9) Posting reference and date of transaction; (10) Date placed in service (if required in accordance with the terms and conditions of the contract).
Information for Offerors: Use of a Receipt and Issue System for Government Material: When approved by the Property Administrator, the Contractor may maintain, in lieu of formal property records, a file of appropriately cross-referenced documents evidencing receipt, issue, and use of material that is issued for immediate consumption.
A4: Physical Inventory - The Offeror shall describe their process of periodically performing, recording, and disclosing physical inventory results to the Task Order Property Administrator and or Contracting Officer. The Offeror shall describe their process of performing a final physical inventory upon Task Order completion or termination. Note: The Task Order Property Administrator may waive this final inventory requirement, depending on the circumstances (e.g., overall reliability of the Contractor’s system or the property is to be transferred to a follow-on Task Order).
A5: Subcontractor Control - A5.1: The Offeror shall describe their process of ensuring that awarded Task Order subcontracts clearly identify items to be provided and the extent of any restrictions or limitations on their use. The Offeror shall also describe their process of ensuring appropriate flow down of Task Order terms and conditions to subcontractors (e.g., extent of liability for loss of Government property).
A5.2: The Offeror shall describe their process of ensuring that awarded Task Order subcontracts are properly administered and reviews are periodically performed to determine the adequacy of the subcontractor’s property management system.
A6: Reports - The Offeror shall describe their process of creating and providing reports of discrepancies, loss of Government property, physical inventory results, audits and self-assessments, corrective actions, and other property-related reports as directed by the Task Order Contracting Officer.
A7: Relief of Stewardship Responsibility and Liability - The Offeror shall describe their process of ensuring the prompt recognition, investigation, disclosure and reporting of loss of Government property, including losses that occur at subcontractor or alternate site locations.
A7.1: The Offeror shall describe their process of implementing corrective actions necessary to prevent the recurrence of Government Property losses.
A7.2: The Offeror shall describe their process of investigating and reporting to the Government all incidents of property loss as soon as the facts become known. Such reports shall, at a minimum, contain the following information: (1) Date of incident (if known); (2) The data elements identified in Paragraph 1A3.1 above; (3) Quantity; (4) Accountable Task Order number; (5) A statement indicating current or future need; (6) Unit acquisition cost, or if applicable, estimated sales proceeds, estimated repair or replacement costs; (7) All known interests in commingled material of which includes Government material; (8) Cause and corrective action taken or to be taken to prevent recurrence; (9) A statement that the Government will receive compensation covering the loss of Government property, in the event the Contractor was or will be reimbursed or compensated; (10) Copies of all supporting documentation; (11) Last known location; (12) A statement that the property did or did not contain sensitive, export controlled, hazardous, or toxic material, and that the appropriate agencies and authorities were notified.
Information for Offerors: Unless the contract provides otherwise, the Contractor shall be relieved of stewardship responsibility and liability for property when:
(1) Such property is consumed or expended, reasonably and properly, or otherwise accounted for, in the performance of the contract, including reasonable inventory adjustments of material as determined by the Property Administrator;
(2) Property Administrator grants relief of responsibility and liability for loss of Government property;
(3) Property is delivered or shipped from the Contractor's plant, under Government instructions, except when shipment is to a subcontractor or other location of the Contractor; or
(4) Property is disposed of in accordance with paragraphs (j) and (k) of FAR Clause 52.245-1.
A8: Utilizing Government Property - A8.1: The Offeror shall describe their process of ensuring that Government Property shall be utilized, consumed, moved, and stored only as authorized under this Task Order. The Offeror shall describe their process of ensuring that Government property that is excess to Task Order performance in its possession is promptly disclose and reported to the Task Order Property Administrator and Contracting Officer.
A8.2: The Offeror shall describe their process of ensuring that Government material is not commingled with material not owned by the Government. ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ A9: Maintenance - The Offeror shall describe their process of ensuring that Government material is properly maintained and that the Offeror’s process enables the identification, disclosure, and performance of normal and routine preventative maintenance and repair. In addition, The Offeror shall describe their process of disclosing and reporting to the Property Administrator and Contracting Officer the need for replacement and/or capital rehabilitation.
A10: Property Closeout - The Offeror shall describe their process of promptly performing and reporting to the Property Administrator Task Order property closeout, to include reporting, investigating and securing closure of all loss of Government property cases; physically inventorying all property upon termination or completion of this Task Order; and disposing of items at the time they are determined to be excess to contractual needs.
B: The Offeror shall describe their process of establishing and maintaining Government accounting source data, as may be required by this Task Order, particularly in the areas of recognition of acquisitions, loss of Government property, and disposition of material and equipment.
File details come from the government source that posted it. Updated .